{"id":148564,"date":"2026-08-19T10:30:10","date_gmt":"2026-08-19T10:30:10","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/148564\/"},"modified":"2026-08-19T10:30:10","modified_gmt":"2026-08-19T10:30:10","slug":"arenko-to-manage-300mw-bess-co-located-with-uk-offshore-wind","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/148564\/","title":{"rendered":"Arenko to manage 300MW BESS co-located with UK offshore wind"},"content":{"rendered":"<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Software provider Arenko will deploy its Nimbus software at \u00d8rsted\u2019s 300MW\/600MWh battery energy storage system (BESS).<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Arenko\u2019s Nimbus platform will optimise, manage and trade energy from the utility-scale BESS, which is co-located with the 2.9GW Hornsea 3 offshore wind power plant near Norwich.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">The project, now referred to as the Iceni BESS but at <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.solarpowerportal.co.uk\/energy-policy\/-rsted-s-boudica-project-is-blueprint-for-the-future-\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">one time dubbed Boudica<\/a>, is directly integrated with the offshore transmission infrastructure that connects the wind power plant. The BESS site is scheduled to come online by Q1 2027, slightly behind initial projections that it would be commissioned at the end of this year. It <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.solarpowerportal.co.uk\/colocation\/-rsted-breaks-ground-on-hornsea-bess\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">entered construction in March 2025<\/a>.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">The shared grid connection with Hornsea 3, the UK\u2019s largest offshore wind project, makes the Iceni BESS a novel project, regarded as one of the most technically and commercially advanced battery developments in Europe. It is a UK \u2018pathfinder\u2019 co-location project, referred to as a \u201cblueprint for the future\u201d.<\/p>\n<p data-component=\"related-article\" class=\"RelatedArticle\">Related:<a class=\"RelatedArticle-RelatedContent\" href=\"https:\/\/www.solarpowerportal.co.uk\/battery-storage\/untitled\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">SSE secures consent to double Mullafarry BESS duration to 320MWh<\/a><\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">There are a number of other BESS projects situated close to offshore wind, including Vattenfall&#8217;s Battery@Ray and ScottishPower&#8217;s Whitelee BESS, but these do not share grid connections with the offshore wind plants from which they store electricity. As the electricity grid cannot handle peak generation from the UK&#8217;s wind generation fleet, the National Energy System Operator (NESO) pays generators to power down, costing billions of pounds.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">The use of BESS and other flexibility is a way to <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.solarpowerportal.co.uk\/energy-policy\/renewable-uk-planning-changes-should-support-co-location-with-offshore-wind\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">use offshore wind generation more efficiently<\/a>, helping smooth variability and reduce curtailment. This applies to all modes of renewable generation, but offshore wind generation is at particular risk of curtailment losses.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">CEO of Arenko Rupert Newland noted that the co-location with Hornse 3 \u201ccreates significant opportunities\u201d but also comes with challenges, \u201cfrom forecasting and deciding how and when to allocate capacity in real time, to the technical, data and controls integrations between the two assets\u201d.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">According to Katinka Hussman Palbo, vice president of global trading and revenue at \u00d8rsted, the company is \u201caiming to optimise two very different assets, wind and storage, through a shared connection point, while ensuring that both deliver significant value to the grid\u201d.<\/p>\n<p class=\"ContentParagraph ContentParagraph_align_left\" data-testid=\"content-paragraph\">Notably, the Danish-headquartered company <a class=\"ContentText-BodyTextChunk ContentText-BodyTextChunk_link\" href=\"https:\/\/www.solarpowerportal.co.uk\/battery-storage\/orsted-completes-50-hornsea-3-wind-divestment-600mwh-under-construction-bess-not-part-of-deal\" target=\"_self\" data-discover=\"true\" rel=\"nofollow noopener\">sold a 50% stake in the wind plant element of the project late last year<\/a>. The sale, to asset manager Apollo, was kept separate from the BESS element, which is \u00d8rsted\u2019s first large-scale BESS in the UK.<\/p>\n","protected":false},"excerpt":{"rendered":"Software provider Arenko will deploy its Nimbus software at \u00d8rsted\u2019s 300MW\/600MWh battery energy storage system (BESS). Arenko\u2019s Nimbus&hellip;\n","protected":false},"author":2,"featured_media":148565,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[285],"tags":[287],"class_list":["post-148564","post","type-post","status-publish","format-standard","has-post-thumbnail","category-orsted","tag-orsted"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/117121713917304613","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/148564","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=148564"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/148564\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/148565"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=148564"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=148564"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=148564"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}