{"id":151309,"date":"2026-08-24T09:51:08","date_gmt":"2026-08-24T09:51:08","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/151309\/"},"modified":"2026-08-24T09:51:08","modified_gmt":"2026-08-24T09:51:08","slug":"greater-changhua-4-turbine-taken-offline-after-fire-orsted-says","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/151309\/","title":{"rendered":"Greater Changhua 4 Turbine Taken Offline After Fire, \u00d8rsted Says"},"content":{"rendered":"<p>A fire was reported on a wind turbine at \u00d8rsted\u2019s Greater Changhua 4 offshore wind farm in Taiwan on 8 August after the turbine\u2019s system detected an abnormal condition and automatically stopped its operation. \u00a0<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"557\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/08\/Greater-Changhua-2b-and-4_-Photo-Orsted-768x557.jpg\" class=\"attachment-medium_large size-medium_large\" alt=\"\" loading=\"eager\"  \/>Greater Changhua 2b and 4; Photo: \u00d8rsted via LinkedIn<\/p>\n<p>\u00d8rsted said the wind farm team observed the fire shortly after the automatic trip and extinguished it. No personnel were injured, and the company notified the relevant authorities and key stakeholders.<\/p>\n<p>The affected turbine was taken out of service and disconnected from the transmission system as part of the safety measures implemented following the incident. It remains shut down, while a safety exclusion zone has been established around it.<\/p>\n<p>The rest of the wind farm continues to operate normally, according to \u00d8rsted.<\/p>\n<p>The company is investigating the incident together with Siemens Gamesa, which supplied 66 SG 14-236 DD wind turbines for the 920 Greater Changhua 2b &amp; 4, the first project to use this Siemens Gamesa model.<\/p>\n<p>An investigation plan and a subsequent repair plan have been prepared, but the root cause has not yet been established, \u00d8rsted said on 21 August.<\/p>\n<p>The company emphasised that the turbine\u2019s safety systems are designed to detect abnormal conditions and stop automatically so the wider wind farm is not affected.<\/p>\n<p>\u201cOffshore wind farms are designed with multiple layers of safety protection and equipment isolation mechanisms. When an individual piece of equipment detects an abnormal condition, it can be stopped and isolated immediately, preventing the incident from affecting other turbines or the wind farm\u2019s overall operation\u201d, \u00d8rsted said.<\/p>\n<p>According to Taiwanese media, Taiwan\u2019s Energy Administration said that \u00d8rsted reported the incident to the authority at around 07:00 on 8 August. The authority said the damage was limited to the turbine and that there were no injuries, and has asked \u00d8rsted to determine the cause and implement the necessary repairs.<\/p>\n<p>\u00d8rsted said it remains in dialogue with the competent authorities and other stakeholders as the investigation progresses, and that all actions will prioritise personnel and operational safety and avoiding impacts on the surrounding marine environment.<\/p>\n<p>Wind turbine installation on Greater Changhua 2b &amp; 4 was <a href=\"https:\/\/www.offshorewind.biz\/2026\/01\/20\/all-turbines-up-at-orsteds-920-mw-offshore-wind-farm-in-taiwan\/\" rel=\"nofollow noopener\" target=\"_blank\">completed in January<\/a>.<\/p>\n<p>In May this year, the developer announced that all inter-array cables were installed and energised, and all 42 wind turbines at Greater Changhua 4 were connected to Taipower\u2019s grid and generating electricity.<\/p>\n<p>Once fully operational, which is\u00a0<a href=\"https:\/\/www.offshorewind.biz\/2025\/09\/08\/damaged-cable-delays-greater-changhua-2b-commissioning-until-third-quarter-2026\/\" rel=\"nofollow noopener\" target=\"_blank\">expected in the third quarter of 2026<\/a>, Greater Changhua 2b and 4 will supply renewable electricity to Taiwan Semiconductor Manufacturing Company Limited (TSMC) under a corporate power purchase agreement (CPPA) signed in 2020.<\/p>\n<p>\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/08\/1787565068_237_OW.biz-img-white-bckgrnd-1024x538.png\" class=\"attachment-large size-large\" alt=\"\"  \/><\/p>\n<p>Reach the offshore wind industry in one go!<\/p>\n<p>offshoreWIND.biz is read by thousands of offshore wind professionals every day.<\/p>\n<p>\u2014<\/p>\n<p>Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.<\/p>\n<p class=\"has-text-align-center\">Follow offshoreWIND.biz on:<\/p>\n","protected":false},"excerpt":{"rendered":"A fire was reported on a wind turbine at \u00d8rsted\u2019s Greater Changhua 4 offshore wind farm in Taiwan&hellip;\n","protected":false},"author":2,"featured_media":151310,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[285],"tags":[2608,287,2609],"class_list":["post-151309","post","type-post","status-publish","format-standard","has-post-thumbnail","category-orsted","tag-greater-changhua-2b-4","tag-orsted","tag-siemens-gamesa"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/117149872301288791","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/151309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=151309"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/151309\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/151310"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=151309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=151309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=151309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}