{"id":16958,"date":"2026-02-18T06:16:31","date_gmt":"2026-02-18T06:16:31","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/16958\/"},"modified":"2026-02-18T06:16:31","modified_gmt":"2026-02-18T06:16:31","slug":"poland-power-supply-agreement-signed-for-warsaw-lodz-high-speed-rail-line","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/16958\/","title":{"rendered":"Poland: Power Supply Agreement Signed for Warsaw\u2013\u0141\u00f3d\u017a High-Speed Rail Line"},"content":{"rendered":"<p>Centralny Port Komunikacyjny (CPK) has contracted Polskie Sieci Elektroenergetyczne (PSE) to\u00a0provide power connections for the high-speed rail line between Warsaw and \u0141\u00f3d\u017a, forming part of Poland\u2019s Port Polska investment programme.<\/p>\n<p>CPK and PSE will work together to connect traction substations on the route to the national transmission grid. The total value of the agreements exceeds 46 million PLN.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-17603303\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/02\/unnamed-15-scaled.png\" alt=\"Power supply for the High-Speed rail Warsaw-\u0141\u00f3d\u017a agreement signed\" width=\"2560\" height=\"1338\"  \/><\/p>\n<p>Power supply for the High-Speed rail Warsaw-\u0141\u00f3d\u017a agreement signed<\/p>\n<p>\u00a9 CPK<\/p>\n<p>Under the arrangements, PSE will connect two traction substations serving the Warsaw\u2013\u0141\u00f3d\u017a line. One substation will be located near the planned <a href=\"https:\/\/airportindustry-news.com\/in-pictures-construction-design-submitted-for-cpk-airport\/\" rel=\"noreferrer noopener nofollow\" target=\"_blank\">new airport<\/a> and will be supplied from a 400\/110 kV power substation currently being built by PSE. This facility will also provide electricity for airport operations, including the air traffic control tower, operational control centres, rescue and fire-fighting buildings, maintenance facilities and offices for airport services.<\/p>\n<p>The second traction substation, located in Dmosin near \u0141\u00f3d\u017a, will be supplied from the 400\/220\/110 kV Stryk\u00f3w power substation. Traction substations play a central role in railway operations, as they distribute and convert electricity for use by trains.<\/p>\n<p>PSE, Poland\u2019s electricity transmission system operator, is responsible for the operation and development of the national transmission grid and cross-border interconnections, as well as infrastructure supporting the wholesale electricity market.<\/p>\n<p>The Warsaw\u2013\u0141\u00f3d\u017a high-speed rail line will use a 2\u00d725 kV alternating current power supply, which is required for train operations at speeds of up to 350 km\/h.<\/p>\n<p>Piotr Rachwalski, Member of the Management Board of Centralny Port Komunikacyjny responsible for rail said:<\/p>\n<p class=\"article__quote-text\">Ensuring power supply is an extremely important element of the High-Speed Rail construction process. A 2\u00d725 kV alternating current supply will allow passenger trains to reach speeds of up to 350 km\/h. We are counting on continued good cooperation with PSE in the implementation of further sections of the \u2018Y\u2019 railway line, which will connect Warsaw, the new airport, \u0141\u00f3d\u017a, Pozna\u0144 and Wroc\u0142aw, setting a new standard for rail travel in Poland.<\/p>\n<p>Under the division of responsibilities, PSE will build the power infrastructure required to connect the traction substations to the transmission grid, while CPK will construct the substations themselves as part of the Port Polska programme. The facilities will enable electricity to be distributed and converted to the voltage required by the railway traction system.<\/p>\n<p>Railway lines developed under the programme will use two power supply standards: 3 kV direct current for conventional lines connecting to the new network, and 2\u00d725 kV alternating current for the high-speed \u201cY\u201d line. The latter standard has not previously been used in Poland.<\/p>\n<p>The power supply agreements mark further progress on the Warsaw\u2013\u0141\u00f3d\u017a high-speed rail project. At the end of 2025, CPK announced the first construction tender for a 13-kilometre section of the route between Kotowice, in the Brwin\u00f3w municipality, and the airport junction. Further procurement procedures are planned in 2026 for five additional sections totalling 120 kilometres, while preparatory works continue for the high-speed rail tunnel excavation.<\/p>\n<p>    \t\t\t\t\t\t\tTags<\/p>\n<p>\t\t\t\t\t\t\t\t\t\t\t\t\tProducts &amp; Services<\/p>\n","protected":false},"excerpt":{"rendered":"Centralny Port Komunikacyjny (CPK) has contracted Polskie Sieci Elektroenergetyczne (PSE) to\u00a0provide power connections for the high-speed rail line&hellip;\n","protected":false},"author":2,"featured_media":16959,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[95],"tags":[7002,182,12262,181],"class_list":{"0":"post-16958","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-warsaw","8":"tag-cpk","9":"tag-poland","10":"tag-power-supply","11":"tag-warsaw"},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/16958","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=16958"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/16958\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/16959"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=16958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=16958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=16958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}