{"id":191285,"date":"2026-10-23T15:37:00","date_gmt":"2026-10-23T15:37:00","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/191285\/"},"modified":"2026-10-23T15:37:00","modified_gmt":"2026-10-23T15:37:00","slug":"ltg-link-stadler-flirt-trains-enter-service-in-lithuania","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/191285\/","title":{"rendered":"LTG Link Stadler FLIRT trains enter service in Lithuania"},"content":{"rendered":"<p>The first of 15 new LTG Link Stadler FLIRT trains entered regular passenger service on October 22, 2026, on the Vilnius\u2013Kaunas\u2013Vilnius route, with battery-electric units due in December.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/10\/ltg-link-stadler-flirt-vilnius-kaunas.webp\"><img data-rws-image-box=\"1600x900\" style=\"width:min(100%,1600px);height:auto;aspect-ratio:1600\/900;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-192594\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/10\/ltg-link-stadler-flirt-vilnius-kaunas.webp\" alt=\"LTG Link Stadler FLIRT beside a platform with Vilnius\u2013Kaunas on its destination display\" width=\"1600\" height=\"900\"  \/><\/a>An LTG Link Stadler FLIRT at Vilnius railway station. Photo: Ministry of Transport and Communications of Lithuania.<\/p>\n<p>The electric train left on its first run after a <a href=\"https:\/\/ltg.lt\/en\/naujienos\/2026\/new-chapter-for-lithuanian-railways-stadler-train-enters-passenger-service\/\" rel=\"nofollow noopener\" target=\"_blank\">launch ceremony at Vilnius railway station<\/a>. The order placed by the passenger arm of the Lithuanian Railways (LTG) Group covers <a href=\"https:\/\/www.railway.supply\/new-ltg-link-trains-speed-comfort-and-accessibility-by-2026\/\" rel=\"nofollow noopener\" target=\"_blank\">nine electric units and six battery-electric units<\/a> able to run on both electrified and non-electrified lines.<\/p>\n<p>Rollout to Vilnius\u2013Klaip\u0117da and battery routes<\/p>\n<p>Over the coming months, the rest of the fleet is to take over from the trains now used on the country\u2019s main routes. After Vilnius\u2013Kaunas, the electric units are due to move to Vilnius\u2013Klaip\u0117da\u2013Vilnius, and LTG expects them to operate most trips on that route by the end of the year. The battery-electric trains are scheduled to enter passenger service in December, starting on Kaunas\u2013\u0160iauliai\u2013Kaunas and Radvili\u0161kis\u2013Klaip\u0117da\u2013Radvili\u0161kis and adding Vilnius\u2013Var\u0117na\u2013Marcinkonys\u2013Vilnius in the second half of the month.<\/p>\n<p>Where the new Stadler FLIRT trains are due to run: one route in service, four more planned by the end of December 2026. Schedule as published by LTG on October 22, 2026, with the Klaip\u0117da line status from LTG on October 5, 2026. Sources: <a href=\"https:\/\/ltg.lt\/en\/naujienos\/2026\/new-chapter-for-lithuanian-railways-stadler-train-enters-passenger-service\/\" rel=\"nofollow noopener\" target=\"_blank\">LTG launch announcement<\/a>, <a href=\"https:\/\/ltg.lt\/en\/naujienos\/2026\/dynamic-testing-completed-for-the-vilnius-klaipeda-electrification-project-just-one-step-away-from-operation\/\" rel=\"nofollow noopener\" target=\"_blank\">LTG electrification update<\/a>.<\/p>\n<p>Route<br \/>\nTrain type<br \/>\nTiming<br \/>\nStatus<\/p>\n<p>Vilnius\u2013Kaunas\u2013Vilnius<br \/>\nElectric<br \/>\nFrom October 22, 2026<br \/>\nIn passenger service<\/p>\n<p>Vilnius\u2013Klaip\u0117da\u2013Vilnius<br \/>\nElectric<br \/>\nAfter Vilnius\u2013Kaunas, with most trips by the end of 2026<br \/>\nPlanned; line certification for electric operation under way<\/p>\n<p>Kaunas\u2013\u0160iauliai\u2013Kaunas<br \/>\nBattery-electric<br \/>\nDecember 2026<br \/>\nPlanned<\/p>\n<p>Radvili\u0161kis\u2013Klaip\u0117da\u2013Radvili\u0161kis<br \/>\nBattery-electric<br \/>\nDecember 2026<br \/>\nPlanned<\/p>\n<p>Vilnius\u2013Var\u0117na\u2013Marcinkonys\u2013Vilnius<br \/>\nBattery-electric<br \/>\nSecond half of December 2026<br \/>\nPlanned<\/p>\n<p>Speaking to reporters at the station, Ar\u016bnas Rumskas, interim chief executive of LTG Group, said the first Vilnius\u2013Kaunas journeys would run about eight minutes longer than usual while the overhead line undergoes a major overhaul. <a href=\"https:\/\/www.lrt.lt\/naujienos\/eismas\/7\/3090164\/liks-nepamirsti-laiku-islipti-prasideda-keliones-naujaisiais-stadler-traukiniais\" rel=\"nofollow noopener\" target=\"_blank\">Lithuanian news agency BNS reported<\/a> that 13 of the 15 trains, seven electric and all six battery-electric units, had already arrived in Lithuania.<\/p>\n<p>Certification of the Vilnius\u2013Klaip\u0117da line<\/p>\n<p>The Klaip\u0117da step is tied to the electrification of the 363-kilometer Vilnius\u2013Klaip\u0117da corridor, which LTG Group company LTG Infra is carrying out in three stages. LTG reported on October 5 that <a href=\"https:\/\/ltg.lt\/en\/naujienos\/2026\/dynamic-testing-completed-for-the-vilnius-klaipeda-electrification-project-just-one-step-away-from-operation\/\" rel=\"nofollow noopener\" target=\"_blank\">dynamic testing on the Radvili\u0161kis\u2013Klaip\u0117da section<\/a> was complete and that certification procedures were under way. Once that process ends, the line will be approved for regular electric train operations, which LTG says will open the route to the new Stadler electric trains. When the project is finished, the electrified share of Lithuania\u2019s rail network is set to rise from 8% to 28%.<\/p>\n<p>Bistro, ramps and more room on board<\/p>\n<p>LTG describes the trains as roomier and higher in capacity, with ramps and interior design intended to make movement easier for passengers with reduced mobility, plus more space for bicycles. Every unit is more than half a meter wider than standard models. The electric trains also bring back an on-board bistro selling hot food and drinks, a service the company says Lithuanian trains have lacked for several decades.<\/p>\n<p>The 2023 contract with Stadler<\/p>\n<p>The order dates from June 2023, when LTG Link signed with Stadler after a tender launched at the end of 2020. Stadler Polska manufactures the trains under a <a href=\"https:\/\/sc.bns.lt\/view\/item\/ltg-link-and-the-swiss-capital-company-stadler-will-purchase-15-new-electric-and-electric-battery-trains-464892\" rel=\"nofollow noopener\" target=\"_blank\">\u20ac226.5 million contract<\/a> that also covers technical support for their maintenance and the supply of spare parts until 2037. At the time of signing, LTG planned for passengers to start riding the first new trains in mid-2026.<\/p>\n<p>Stadler\u2019s <a href=\"https:\/\/www.stadlerrail.com\/api\/docs\/49f46b7430\/2023_0621_media-release_stadler-with-the-first-order-in-the-lithuania_en.pdf\" rel=\"nofollow noopener\" target=\"_blank\">specifications from the contract award<\/a> describe the nine electric trains as five-car FLIRT Intercity units 93 meters long with up to 200 seats, 16 of them in first class. The six battery-electric trains are more than 65 meters long and combine three passenger cars with a separate power car holding the traction batteries, with up to 128 seats. They are meant to replace diesel trains on non-electrified sections.<\/p>\n<p>The contract leaves room for a larger fleet. Beyond the 15 firm units, Stadler listed options for up to 13 more electric FLIRT Intercity trains, 15 battery-electric trains with a 100-kilometer range and 11 battery-electric trains with a 70-kilometer range. LTG calls the program the largest renewal of the LTG Link fleet since Lithuania regained independence.<\/p>\n<p>How the two LTG Link Stadler FLIRT versions compare, including the contract options that could add up to 39 more units (Railway Supply calculation: 13 + 15 + 11). Figures from Stadler\u2019s contract release of June 21, 2023; seat and bicycle numbers are maximums, and options are not firm orders. Source: <a href=\"https:\/\/www.stadlerrail.com\/api\/docs\/49f46b7430\/2023_0621_media-release_stadler-with-the-first-order-in-the-lithuania_en.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Stadler contract release<\/a>.<\/p>\n<p>Feature<br \/>\nElectric FLIRT Intercity<br \/>\nBattery-electric FLIRT<\/p>\n<p>Firm order<br \/>\n9 units<br \/>\n6 units<\/p>\n<p>Contract options<br \/>\nUp to 13 units<br \/>\nUp to 15 units with a 100 km range and up to 11 with a 70 km range<\/p>\n<p>Formation and length<br \/>\nFive cars, 93 m<br \/>\nThree passenger cars plus a battery power car, over 65 m<\/p>\n<p>Seats<br \/>\nUp to 200, including 16 in first class<br \/>\nUp to 128<\/p>\n<p>Bicycle spaces<br \/>\n14 to 30, depending on season and route<br \/>\n6 to 30, depending on season and route<\/p>\n<p>Doors<br \/>\n5<br \/>\n3<\/p>\n<p>On-board catering<br \/>\nBistro area<br \/>\nSnack vending machines<\/p>\n<p>Planned use<br \/>\nIntercity services<br \/>\nNon-electrified lines, in place of diesel trains<\/p>\n<p>Rumskas placed the launch within the group\u2019s wider rail program:<\/p>\n<p>\u201cWe are renewing trains, electrifying major rail lines, modernizing infrastructure, and consistently strengthening the role of railways in the country.\u201d<\/p>\n<p>Minister of National Defense Robertas Kaunas linked the investment to military logistics:<\/p>\n<p>\u201cBy investing in railways, logistics hubs, and military mobility, we ensure the ability to rapidly receive and effectively supply allied forces, while strengthening the resilience of NATO\u2019s eastern flank.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"The first of 15 new LTG Link Stadler FLIRT trains entered regular passenger service on October 22, 2026,&hellip;\n","protected":false},"author":2,"featured_media":191286,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[93],"tags":[171,24049,40294,1155,170],"class_list":["post-191285","post","type-post","status-publish","format-standard","has-post-thumbnail","category-vilnius","tag-lithuania","tag-lithuanian-railways","tag-procurement-of-railway-rolling-stock","tag-stadler","tag-vilnius"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/117490971265071107","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/191285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=191285"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/191285\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/191286"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=191285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=191285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=191285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}