{"id":195982,"date":"2026-10-31T19:11:24","date_gmt":"2026-10-31T19:11:24","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/195982\/"},"modified":"2026-10-31T19:11:24","modified_gmt":"2026-10-31T19:11:24","slug":"nuremberg-ingolstadt-high-speed-line-closed-until-dec-12","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/195982\/","title":{"rendered":"Nuremberg\u2013Ingolstadt high-speed line closed until Dec. 12"},"content":{"rendered":"<p>Deutsche Bahn has closed the Nuremberg\u2013Ingolstadt high-speed line until Dec. 12, adding about 45 minutes to Munich\u2013Berlin ICE trips, which now take roughly 4 hours 50 minutes.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/10\/ice-train-near-forchheim.webp\"><img data-rws-image-box=\"1600x900\" style=\"width:min(100%,1600px);height:auto;aspect-ratio:1600\/900;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-193412\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/10\/ice-train-near-forchheim.webp\" alt=\"White DB ICE train with a red stripe passing under a blue arch bridge on a four-track line near Forchheim\" width=\"1600\" height=\"900\"  \/><\/a>An ICE train on the four-track Nuremberg\u2013Bamberg line near Forchheim. Photo: Deutsche Bahn AG<\/p>\n<p>The full closure began at 10 p.m. on Oct. 30 and runs through Dec. 12, <a href=\"https:\/\/www.deutschebahn.com\/de\/presse\/presse-regional\/pr-muenchen-de\/aktuell\/presseinformationen\/DB-InfraGO-modernisiert-Schnellfahrstrecke-zwischen-Nuernberg-und-Ingolstadt-14064532\" rel=\"nofollow noopener\" target=\"_blank\">DB InfraGO said when it announced the rail renewal<\/a>. Crews from the group\u2019s infrastructure company are laying more than 160 kilometers (about 100 miles) of new rail between Allersberg, Kinding and Ingolstadt Nord and moving around 10,000 metric tons of material. High speeds on the line make rail replacement necessary after roughly 20 years, the company says.<\/p>\n<p>The work also includes several new switches, new cabling, tunnel inspections and cleaning of drainage systems. A DB spokeswoman told German news agency dpa that the project costs around \u20ac70 million and that about 170 trains a day use the line, some at speeds of 300 km\/h (186 mph).<\/p>\n<p>ICE changes on Munich routes to Berlin, Hamburg and Frankfurt<\/p>\n<p><a href=\"https:\/\/assets-ri.extranet.deutschebahn.com\/db_fernverkehr\/2026-03-18\/d486be89-72c1-44e2-8bed-14ef45f72805Details%2BBauarbeiten%2Bzwischen%2BN%25C3%25BCrnberg%2Bund%2BM%25C3%25BCnchen.pdf\" rel=\"nofollow noopener\" target=\"_blank\">DB\u2019s long-distance timetable for the works<\/a> applies from 7 a.m. on Oct. 30 to 11:59 p.m. on Dec. 12. Munich keeps at least one direct train an hour to Berlin, while services between Nuremberg and Berlin are unaffected. ICE line 18 via Augsburg runs as normal. Line 28 operates only between Nuremberg and Hamburg and no longer calls at Munich Hbf, and line 29 is diverted between Ingolstadt and Nuremberg, adding about 30 minutes and shifting its Munich\u2013Nuremberg times.<\/p>\n<p>Trains between Munich and Hamburg via Kassel run every two hours instead of hourly, and in the other hour they start or end in Nuremberg. On line 25, trains via Augsburg are unchanged, but those via Nuremberg skip both Munich Hbf and Ingolstadt Hbf. Ingolstadt still has an hourly ICE, though only to and from Berlin.<\/p>\n<p>There are no direct Munich\u2013Frankfurt trains via Nuremberg during the closure, and DB points travelers to direct services via Stuttgart. Line 41 runs only between Nuremberg and Essen or Dortmund, without its Munich stop.<\/p>\n<p>ICE lines from Munich under DB\u2019s long-distance timetable for the works, 7 a.m. Oct. 30 to 11:59 p.m. Dec. 12, 2026 (the line itself closed at 10 p.m. on Oct. 30): three lines lose their Munich Hbf stop on some or all trains, one is diverted and one runs as normal. Source: <a href=\"https:\/\/assets-ri.extranet.deutschebahn.com\/db_fernverkehr\/2026-03-18\/d486be89-72c1-44e2-8bed-14ef45f72805Details%2BBauarbeiten%2Bzwischen%2BN%25C3%25BCrnberg%2Bund%2BM%25C3%25BCnchen.pdf\" rel=\"nofollow noopener\" target=\"_blank\">DB long-distance timetable notice<\/a><\/p>\n<p>Line<br \/>\nRegular route<br \/>\nDuring the closure<\/p>\n<p>ICE 18<br \/>\nMunich \u2013 Augsburg \u2013 Nuremberg \u2013 Erfurt \u2013 Berlin \u2013 Hamburg<br \/>\nRuns as normal<\/p>\n<p>ICE 25<br \/>\nMunich \u2013 Augsburg or Nuremberg \u2013 Kassel \u2013 Hanover \u2013 Hamburg<br \/>\nTrains via Augsburg run as normal. Trains via Nuremberg run only between Nuremberg and Hamburg and skip Munich Hbf and Ingolstadt Hbf<\/p>\n<p>ICE 28<br \/>\nMunich \u2013 Nuremberg \u2013 Erfurt \u2013 Leipzig \u2013 Berlin \u2013 Hamburg<br \/>\nRuns only between Nuremberg and Hamburg, no Munich Hbf stop<\/p>\n<p>ICE 29<br \/>\nMunich \u2013 Ingolstadt \u2013 Nuremberg \u2013 Erfurt \u2013 Halle \u2013 Berlin<br \/>\nDiverted between Ingolstadt and Nuremberg, about 30 minutes longer, with changed Munich\u2013Nuremberg times<\/p>\n<p>ICE 41<br \/>\nMunich \u2013 Nuremberg \u2013 Frankfurt \u2013 Cologne \u2013 Essen \u2013 (Dortmund)<br \/>\nRuns only between Nuremberg and Essen or Dortmund, no Munich Hbf stop<\/p>\n<p>RE1 trains rerouted and buses for Allersberg and Kinding<\/p>\n<p>Regional RE1 trains between Munich, Ingolstadt and Nuremberg are diverted via Treuchtlingen (by way of Ingolstadt) or via Augsburg. Replacement buses run between Nuremberg and Ingolstadt, stopping at Allersberg and Allersberg (Rothsee) Johannisbr\u00fccke for RE1 and S5 passengers, and at Kinding, Kinding Marktplatz and Ingolstadt Nord for RE1 passengers.<\/p>\n<p>Closure ends a day before DB\u2019s 2027 timetable<\/p>\n<p>The closure is scheduled to end on Dec. 12, one day before <a href=\"https:\/\/www.deutschebahn.com\/de\/presse\/pressestart_zentrales_uebersicht\/Fahrplan-2027-stabile-Preise-neue-Sprinter-mehr-europaeische-Verbindungen-14065322\" rel=\"nofollow noopener\" target=\"_blank\">DB\u2019s 2027 timetable takes effect on Dec. 13<\/a>. The new timetable adds an ICE Sprinter line between Hamburg and Munich, running three times a day in each direction with stops only in Hanover and Nuremberg and cutting the journey by 20 minutes to 5 hours 20 minutes.<\/p>\n","protected":false},"excerpt":{"rendered":"Deutsche Bahn has closed the Nuremberg\u2013Ingolstadt high-speed line until Dec. 12, adding about 45 minutes to Munich\u2013Berlin ICE&hellip;\n","protected":false},"author":2,"featured_media":195983,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[99],"tags":[112,7371,190,87701],"class_list":["post-195982","post","type-post","status-publish","format-standard","has-post-thumbnail","category-berlin","tag-berlin","tag-deutsche-bahn-ag","tag-germany","tag-germany-rail-news"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/117537111093454285","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/195982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=195982"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/195982\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/195983"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=195982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=195982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=195982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}