{"id":204709,"date":"2026-11-13T11:50:11","date_gmt":"2026-11-13T11:50:11","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/204709\/"},"modified":"2026-11-13T11:50:11","modified_gmt":"2026-11-13T11:50:11","slug":"seaway7-starts-cable-installation-at-orsteds-hornsea-3","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/204709\/","title":{"rendered":"Seaway7 Starts Cable Installation At \u00d8rsted\u2019S Hornsea 3"},"content":{"rendered":"<p>Seaway7 has installed the first inter-array cable at \u00d8rsted&#8217;s 2.9 GW Hornsea 3 offshore wind farm in the UK North Sea, marking the start of a major cable installation campaign.<\/p>\n<p>The company will transport and install more than 536 kilometers of 66kV inter-array cables, connecting the wind turbines to offshore converter stations, Seaway7 announced on November 12.<\/p>\n<p>The scope covers 197 inter-array cables at Hornsea 3, which Seaway7 expects to become the world&#8217;s largest offshore wind farm when completed.<\/p>\n<p>The project is the third in \u00d8rsted&#8217;s Hornsea offshore wind zone for which Seaway7 has secured an inter-array cable installation contract.<\/p>\n<p>The company previously transported and installed 89 cables totaling approximately 170 kilometers at Hornsea 1, followed by 165 cables spanning around 382 kilometers at Hornsea 2.<\/p>\n<p>Once the latest campaign is completed, Seaway7 will have installed more than 1,000 kilometers of inter-array cables across the three developments.<\/p>\n<p>The Hornsea projects are located approximately 90 &#8211; 160 kilometers off the east coast of England, in water depths ranging from around 25 to 75 meters.<\/p>\n<p>Delivery of the current installation program is being led from Seaway7&#8217;s Aberdeen office.<\/p>\n","protected":false},"excerpt":{"rendered":"Seaway7 has installed the first inter-array cable at \u00d8rsted&#8217;s 2.9 GW Hornsea 3 offshore wind farm in the&hellip;\n","protected":false},"author":2,"featured_media":204710,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[285],"tags":[287],"class_list":["post-204709","post","type-post","status-publish","format-standard","has-post-thumbnail","category-orsted","tag-orsted"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/117608987091314269","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/204709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=204709"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/204709\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/204710"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=204709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=204709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=204709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}