{"id":48599,"date":"2026-03-25T21:59:55","date_gmt":"2026-03-25T21:59:55","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/48599\/"},"modified":"2026-03-25T21:59:55","modified_gmt":"2026-03-25T21:59:55","slug":"maersk-orders-eight-dual-fuel-lng-container-ships","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/48599\/","title":{"rendered":"Maersk orders eight dual-fuel LNG container ships"},"content":{"rendered":"<p>Maersk has placed an order for eight large LNG dual-fuel container ships with New Times Shipbuilding Co. Ltd. in China.<\/p>\n<p>The vessels, all featuring identical specifications, will form part of a new series of 18,600 TEU ships scheduled for delivery in 2029 and 2030. Each ship will measure 366 meters in length and 58.6 meters in breadth, making them slightly smaller than the current maximum container vessel length of 400 meters.\u00a0<\/p>\n<p>These eight new vessels are a key part of our ongoing fleet renewal and will help maintain the competitive edge of our fleet<\/p>\n<p>\u2026 said Anda Cristescu, Head of Chartering &amp; Newbuilding at Maersk.<\/p>\n<p>With this order, Maersk now has 33 vessels on order, including four scheduled for delivery later in 2026.<\/p>\n<p>Although these vessels are large, they offer greater flexibility than the biggest ships currently under construction in the industry. This allows us multiple deployment options across both our current and future network<\/p>\n<p>\u2026 Anda Cristescu added.<\/p>\n<p><a href=\"https:\/\/safety4sea.com\/maersk-completes-17480-teu-dual-fuel-methanol-vessel-series\/\" rel=\"nofollow noopener\" target=\"_blank\">To remind, in January, Maersk announced the naming of the last vessel in its 17,480 TEU dual-fuel methanol <\/a>series, Barcelona M\u00e6rsk, marking the company\u2019s achievement of its target to deploy 19 methanol-capable vessels by 2026; its methanol fleet now comprises 12 vessels of 16,000 TEU, six of 17,480 TEU, and one 15,690-TEU container ship retrofitted to operate on methanol.<\/p>\n","protected":false},"excerpt":{"rendered":"Maersk has placed an order for eight large LNG dual-fuel container ships with New Times Shipbuilding Co. Ltd.&hellip;\n","protected":false},"author":2,"featured_media":48600,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[224],"tags":[5989,5933,27250,245,6906],"class_list":["post-48599","post","type-post","status-publish","format-standard","has-post-thumbnail","category-maersk","tag-alternative-fuels","tag-dual-fuel-engines","tag-lng-as-a-fuel","tag-maersk","tag-shipping-emissions"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/116292067403709269","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/48599","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=48599"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/48599\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/48600"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=48599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=48599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=48599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}