{"id":65312,"date":"2026-04-21T10:50:10","date_gmt":"2026-04-21T10:50:10","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/65312\/"},"modified":"2026-04-21T10:50:10","modified_gmt":"2026-04-21T10:50:10","slug":"cip-begins-construction-on-1500mwh-chile-bess","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/65312\/","title":{"rendered":"CIP begins construction on 1,500MWh Chile BESS"},"content":{"rendered":"<p>Additionally, the project has qualified for an \u201cinternationally recognised\u201d carbon offset programme.<\/p>\n<p>In 2024, <a href=\"https:\/\/www.energy-storage.news\/copenhagen-infrastructure-partners-starts-construction-standalone-bess-in-chile\/\" rel=\"nofollow noopener\" target=\"_blank\">CIP reached final investment decision on the 220MW\/1,100MWh Arena BESS project in Antofagasta<\/a>.<\/p>\n<p>Most BESS projects in Chile are paired with solar PV. While Arena is a standalone project, it\u2019s still located in Chile\u2019s northern region, where high irradiation levels have concentrated the country\u2019s solar capacity.<\/p>\n<p>As reported earlier this year by our colleagues at PV Tech, <a href=\"https:\/\/www.energy-storage.news\/energy-storage-fleet-mitigated-2twh-of-renewables-curtailment-in-chile-in-2025\/\" rel=\"nofollow noopener\" target=\"_blank\">solar and wind curtailment in Chile surpassed 6TWh in 2025<\/a>, up 8% year-on-year, according to Chilean renewable energy and storage association ACERA.<\/p>\n<p>Without BESS absorbing curtailed generation, the situation would have been far worse. ACERA estimates that curtailment could have reached 8TWh, a 43% increase, if operational BESS hadn\u2019t stored renewable energy that would otherwise have been wasted.<\/p>\n<p>ACERA noted that if all curtailed solar and wind had reached the grid in 2025, renewable energy\u2019s share would have been 49.4% instead of 42.4%.<\/p>\n<p>Energy storage deployment is accelerating in Chile. If current trends continue, ACERA projects approximately 9GW of BESS, averaging 4-hour duration, will be operational by the end of 2026, quickly surpassing <a href=\"https:\/\/www.energy-storage.news\/chile-to-hit-2030-energy-storage-target-early-argentina-entices-investors-energy-storage-summit-latin-america-day-1\/\" rel=\"nofollow noopener\" target=\"_blank\">the country\u2019s 2GW BESS deployment by 2030 target<\/a> four years ahead of schedule.<\/p>\n<p>In March, <a href=\"https:\/\/www.energy-storage.news\/chile-grenergy-places-2-6gwh-bess-order-with-byd-engie-energises-230mwh-project\/\" rel=\"nofollow noopener\" target=\"_blank\">Spain-headquartered independent power producer (IPP) Grenergy ordered 2,600MWh of BESS equipment from Chinese manufacturer BYD for its Central Oasis solar-plus-storage complex<\/a>.<\/p>\n<p>Central Oasis is Grenergy\u2019s second GWh-scale hybrid project in Chile, following Oasis de Atacama in the country\u2019s Atacama Desert region.<\/p>\n<p>Earlier this month, <a href=\"https:\/\/www.energy-storage.news\/copenhagen-infrastructure-partners-sells-960mwh-summerfield-battery-to-palisade-in-south-australia\/\" rel=\"nofollow noopener\" target=\"_blank\">CIP exited one of South Australia\u2019s largest\u00a0BESS projects, agreeing to sell its stake in the 240MW\/960MWh Summerfield BESS to Palisade Investment Partners<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"Additionally, the project has qualified for an \u201cinternationally recognised\u201d carbon offset programme. In 2024, CIP reached final investment&hellip;\n","protected":false},"author":2,"featured_media":65313,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[13317,1479,18134,992,108,382,35914],"class_list":{"0":"post-65312","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-copenhagen","8":"tag-battery","9":"tag-bess","10":"tag-chile","11":"tag-cip","12":"tag-copenhagen","13":"tag-copenhagen-infrastructure-partners","14":"tag-solarplusstorage"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/116442315282418415","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/65312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=65312"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/65312\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/65313"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=65312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=65312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=65312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}