{"id":6550,"date":"2026-02-09T14:23:07","date_gmt":"2026-02-09T14:23:07","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/6550\/"},"modified":"2026-02-09T14:23:07","modified_gmt":"2026-02-09T14:23:07","slug":"cadelers-new-offshore-wind-om-platform-bags-eur-20-million-contract-in-taiwan","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/6550\/","title":{"rendered":"Cadeler&#8217;s New Offshore Wind O&#038;M Platform Bags EUR 20+ Million Contract in Taiwan"},"content":{"rendered":"<p>Cadeler\u2019s service and maintenance unit, Nexra, has signed a firm contract valued at more than EUR 20 million for the execution of an operations and maintenance (O&amp;M) campaign in Taiwan, the company said on 9 February, leaving the client unnamed. <\/p>\n<p>The campaign, which will be performed across two offshore wind farms in Taiwan, will commence in March 2026 and run for 3-4 months. The work will be carried out by Cadeler\u2019s wind turbine installation vessel (WTIV) Wind Maker.<\/p>\n<p>Cadeler established Nexra in 2025 in response to what the company says is a rapid expansion of operational wind turbines in the 10\u201315 MW segment. Nexra is using the vessels Zaratan, Wind Scylla and Wind Keeper, and has the flexibility to use additional vessels from Cadeler\u2019s fleet as needed.<\/p>\n<p>\u201cThis contract underlines Nexra\u2019s strength in execution and flexibility to respond quickly to client needs in the operational phase of offshore wind farms. In securing near-term campaigns such as this, Nexra demonstrates its ability to drive utilisation across Cadeler\u2019s fleet, while continuing to deliver the reliability and technical expertise our clients expect\u201d, said Mikkel Gleerup, CEO of Cadeler.<\/p>\n<p>The Wind Maker jack-up vessel was delivered to Cadeler by South Korean shipbuilder Hanwha Ocean in January 2025 and was deployed on \u00d8rsted\u2019s Greater Changhua 2b and 4 offshore wind projects in Taiwan shortly after delivery. <\/p>\n<p>Outfitted with a 2,600-tonne main crane, the jack-up\u00a0is designed for the installation and maintenance of heavy offshore wind turbine foundations and components in water depths of up to 65 metres.\u00a0The vessel can install turbines with capacities of up to 20 MW, with the flexibility to operate using either liquefied natural gas (LNG) or ammonia as alternate fuels.<\/p>\n<p>\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"538\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/02\/OW.biz-img-white-bckgrnd-1024x538.png\" class=\"attachment-large size-large\" alt=\"\"  \/><\/p>\n<p>Reach the offshore wind industry in one go!<\/p>\n<p>offshoreWIND.biz is read by thousands of offshore wind professionals every day.<\/p>\n<p>\u2014<\/p>\n<p>Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our offshore wind business directory.<\/p>\n<p class=\"has-text-align-center\">Follow offshoreWIND.biz on:<\/p>\n","protected":false},"excerpt":{"rendered":"Cadeler\u2019s service and maintenance unit, Nexra, has signed a firm contract valued at more than EUR 20 million&hellip;\n","protected":false},"author":2,"featured_media":6551,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[285],"tags":[2607,5772,287,5773],"class_list":["post-6550","post","type-post","status-publish","format-standard","has-post-thumbnail","category-orsted","tag-cadeler","tag-nexra","tag-orsted","tag-wind-maker"],"share_on_mastodon":{"url":"","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/6550","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=6550"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/6550\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/6551"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=6550"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=6550"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=6550"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}