{"id":79170,"date":"2026-05-10T14:17:26","date_gmt":"2026-05-10T14:17:26","guid":{"rendered":"https:\/\/www.europesays.com\/dk\/79170\/"},"modified":"2026-05-10T14:17:26","modified_gmt":"2026-05-10T14:17:26","slug":"denmark-begins-to-sink-89-giant-concrete-blocks-217-meters-long-and-weighing-73-5-thousand-tons-into-the-baltic-sea-to-build-the-worlds-longest-immersed-tunnel-and-connect-the-country-to-germany-in","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/dk\/79170\/","title":{"rendered":"Denmark begins to sink 89 giant concrete blocks, 217 meters long and weighing 73.5 thousand tons, into the Baltic Sea to build the world&#8217;s longest immersed tunnel and connect the country to Germany in 10 minutes by car."},"content":{"rendered":"<p><a href=\"https:\/\/en.clickpetroleoegas.com.br\/ships-that-departed-from-china-arrive-at-the-port-of-santos-with-parts-for-latin-americas-largest-ferris-wheel-bringing-a-70-ton-axle-and-42-ctl01\/\" rel=\"nofollow noopener\" target=\"_blank\">The Fehmarnbelt tunnel reached its first major milestone<\/a> physically completed after the successful installation of the first concrete element on the seabed, in an operation that began late on Monday, May 4, 2026, off the Danish coast. The block left the tunnel factory in R\u00f8dbyhavn, on the Danish island of Lolland, and was transported by five tugboats and the special immersion vessel IVY to the lowering point in the Fehmarn Strait.<\/p>\n<p>According to <a href=\"https:\/\/femern.com\/press\/news\/the-first-element-of-the-fehmarnbelt-tunnel-successfully-immersed\/\" rel=\"nofollow noopener\" target=\"_blank\">Femern<\/a>, what makes this tunnel so impressive is not just its scale, but the way it is being built. The first of the 89 concrete elements, each 217 meters long and weighing over 73,500 tons, was precisely positioned in a trench on the seabed, in front of the Danish portal. When the work is completed, the crossing can be done in just 10 minutes by car and 7 minutes by train, transforming mobility between Denmark and Germany and creating a new backbone for European transport.<\/p>\n<p>The tunnel\u2019s first immersion marked an unprecedented moment<\/p>\n<p>The operation was neither quick nor simple. After several days of work, the immersion phase began around noon on Wednesday. Approximately 14 hours later, the first element reached its exact position on the seabed and was connected to the Danish portal by hydraulic arms.<\/p>\n<p>        ARTICLE CONTINUES BELOW<\/p>\n<p>                See also            <\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/mangroves-hide-a-billion-dollar-water-cleanup-remove-960-thousand-tons-of-nitrogen-per-year-and-reveal-an-environmental-power-that-many-peop-flpc96\/?utm_source=site&amp;utm_medium=recomendacao&amp;utm_campaign=recomendacao_de_artigo\" class=\"pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">Mangroves hide a billion-dollar water cleanup, remove 960 thousand tons of nitrogen per year, and reveal an environmental power that many people hadn\u2019t even imagined existed.<\/p>\n<p>                            <img loading=\"lazy\" width=\"1672\" height=\"941\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/mangroves-hide-a-billion-dollar-water-cleanup-remo.jpeg\"\/><img loading=\"lazy\" width=\"1672\" height=\"941\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/mangroves-hide-a-billion-dollar-water-cleanup-remo.jpeg\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\"  \/>                        <\/a><\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/researchers-found-evidence-that-the-human-brain-can-react-to-the-earths-magnetic-field-according-to-a-study-published-in-the-journal-eneuro-btl96\/?utm_source=site&amp;utm_medium=recomendacao&amp;utm_campaign=recomendacao_de_artigo\" class=\"pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">Researchers found evidence that the human brain can react to the Earth\u2019s magnetic field, according to a study published in the journal eNeuro. The participants remained in a sealed chamber and didn\u2019t even notice when the magnetic field was altered.<\/p>\n<p>                            <img loading=\"lazy\" width=\"1920\" height=\"1080\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/researchers-found-evidence-that-the-human-brain-ca.jpeg\"\/><img loading=\"lazy\" width=\"1920\" height=\"1080\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/researchers-found-evidence-that-the-human-brain-ca.jpeg\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\"  \/>                        <\/a><\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/sweden-resumes-in-lulea-the-largest-dredging-of-its-modern-era-and-will-remove-22-million-cubic-meters-to-take-the-port-beyond-its-50000-ton-ctl01\/?utm_source=site&amp;utm_medium=recomendacao&amp;utm_campaign=recomendacao_de_artigo\" class=\"pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">Sweden resumes in Lule\u00e5 the largest dredging of its modern era and will remove 22 million cubic meters to take the port beyond its 50,000-ton limit, make way for 160,000-ton ships, and unlock the ore route in the Baltic Sea.<\/p>\n<p>                            <img loading=\"lazy\" width=\"1280\" height=\"720\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/sweden-resumes-in-lulea-the-largest-dredging-of-it.jpeg\"\/><img loading=\"lazy\" width=\"1280\" height=\"720\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/sweden-resumes-in-lulea-the-largest-dredging-of-it.jpeg\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\"  \/>                        <\/a><\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/brazil-is-in-the-race-for-the-artificial-sun-with-tokamaks-public-research-and-a-global-billion-dollar-competition-that-aims-to-transform-pl-caes\/?utm_source=site&amp;utm_medium=recomendacao&amp;utm_campaign=recomendacao_de_artigo\" class=\"pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">Brazil is in the race for the artificial sun with tokamaks, public research, and a global billion-dollar competition that aims to transform plasma at 100 million degrees into clean, safe, and almost inexhaustible energy for the planet\u2019s future.<\/p>\n<p>                            <img loading=\"lazy\" width=\"1672\" height=\"941\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/brazil-is-in-the-race-for-the-artificial-sun-with.jpeg\"\/><img loading=\"lazy\" width=\"1672\" height=\"941\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/brazil-is-in-the-race-for-the-artificial-sun-with.jpeg\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\"  \/>                        <\/a><\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=bFdkFt8htMg\" target=\"_blank\" rel=\" noreferrer noopener nofollow\"><img decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"\" data-lazy-src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/1778422645_340_1776965356554.jpeg\"\/><img decoding=\"async\" src=\"https:\/\/www.europesays.com\/dk\/wp-content\/uploads\/2026\/05\/1778422645_340_1776965356554.jpeg\" alt=\"\"\/><\/a><\/p>\n<p>Subsequently, the position was confirmed by laser measurements inside the submerged element itself. It was a historic moment because, for the first time, mass-produced tunnel elements of this size are being used in such a construction. This is not just another construction phase, but a real test of a solution that had never been applied on this scale before.<\/p>\n<p>The tunnel blocks are concrete giants designed for highway and railway<\/p>\n<p><img decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block into the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394834\" data-lazy-src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo.jpg\"\/><img decoding=\"async\" src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo.jpg\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block into the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394834\"\/><\/p>\n<p>Each standard element of the tunnel is a massive hollow concrete structure. The foundation states that these blocks are 217 meters long and weigh over 73,500 tons, numbers that help explain why the operation required so many days, specialized equipment, and absolute precision.<\/p>\n<p>These elements are divided into five tubes, with two for the future highway, two for the railway, and one for technical installations. In practice, each block is born as a functional part of the tunnel, ready to fit into a submerged network that will be assembled piece by piece over the coming years.<\/p>\n<p>How the tunnel was fixed to the seabed<\/p>\n<p><a href=\"https:\/\/en.clickpetroleoegas.com.br\/after-95000-eruptions-analyzed-over-50-years-scientists-foresee-an-s-class-solar-flare-up-to-10-times-stronger-than-an-x-class-flare-with-th-ctl01\/\" rel=\"nofollow noopener\" target=\"_blank\">After the element was placed in the correct position<\/a>, the operation did not end. The plan foresees another special vessel depositing large quantities of gravel along the sides of the structure, ensuring it remains firmly in place.<\/p>\n<p>This detail shows why the tunnel depends on such rigorous technical choreography. It\u2019s not enough to lower the block and fit it. It\u2019s necessary to stabilize it, confirm alignment, and prepare the ground for connection with the next elements. Each immersion requires naval engineering, hydraulic precision, and geotechnical control to function as a single machine.<\/p>\n<p>What still needs to be done for the tunnel to be ready<\/p>\n<p><img decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block to the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394858\" data-lazy-src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo-e.jpg\"\/><img decoding=\"async\" src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo-e.jpg\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block to the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394858\"\/><\/p>\n<p>The first element was just the beginning. The foundation states that, in the coming years, the remaining 88 elements will be immersed one by one and connected in a trench excavated in the seabed, up to 40 meters below the sea surface.<\/p>\n<p>When all are installed, the Fehmarnbelt tunnel will be 18 kilometers long, becoming, by a wide margin, the longest immersed tunnel in the world. It is precisely this combination of length, construction method, and serial production that makes the work seem almost unbelievable even by European infrastructure standards.<\/p>\n<p>The tunnel\u2019s impact goes beyond crossing between two countries<\/p>\n<p>Although the direct connection between Denmark and Germany is already a huge achievement, the project was conceived as something greater than a simple binational connection. The foundation highlights that the Fehmarnbelt tunnel is part of Europe\u2019s future transport network, aiming to strengthen trade, mobility, and security on the continent.<\/p>\n<p>The European Commission treated the work as a priority project and allocated approximately 1.3 billion euros for its construction. This shows that the tunnel is not merely seen as local infrastructure, but as a strategic piece of a more integrated and faster European network.<\/p>\n<p>What changes in the European transport map<\/p>\n<p><img decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block to the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394850\" data-lazy-src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo-2.jpg\"\/><img decoding=\"async\" src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo-2.jpg\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block to the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394850\"\/><\/p>\n<p>When the tunnel is completed, crossing the Fehmarn Strait will drop to 10 minutes by car and 7 minutes by train. Furthermore, rail connections between Copenhagen and Hamburg can be made in 2 and a half hours, compared to the current 5 hours.<\/p>\n<p>This time reduction helps explain why the project attracts so much attention. It is not just a monumental engineering feat, but an intervention capable of redesigning economic and logistical distances between important cities in Northern Europe. What today requires more time, planning, and slower crossings will operate with much greater fluidity.<\/p>\n<p>Denmark, Germany, and Europe treat the tunnel as a historic landmark<\/p>\n<p><img decoding=\"async\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block to the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394861\" data-lazy-src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo-e-2.jpg\"\/><img decoding=\"async\" src=\"https:\/\/clickpetroleoegas.com.br\/wp-content\/uploads\/2026\/05\/Dinamarca-comeca-a-afundar-no-Mar-Baltico-89-blocos-gigantes-de-concreto-de-217-metros-e-735-mil-toneladas-para-construir-o-tunel-imerso-mais-longo-do-mundo-e-2.jpg\" alt=\"Fehmarnbelt Tunnel sinks first 217-meter block to the seabed and advances connection between Denmark and Germany.\" class=\"wp-image-394861\"\/><\/p>\n<p>The symbolic weight of the operation was clearly evident in official statements. Mikkel Hemmingsen, CEO of Sund &amp; B\u00e6lt, stated that the technology, equipment, and contractors demonstrated the capacity to achieve something unprecedented, classifying the moment as very important for the project, for Denmark, for Germany, and for Europe.<\/p>\n<p>Apostolos Tzitzikostas, European Commissioner for Sustainable Transport and Tourism, also described the immersion of the first tunnel element as a historic achievement and stated that the world is witnessing the best of European engineering and construction. This reaction shows that the work has already transcended the technical field and also entered the realm of a continental symbol.<\/p>\n<p><a href=\"https:\/\/en.clickpetroleoegas.com.br\/brl-205-million-establishes-a-german-industry-40-giant-in-joinville-inaugurates-schomackers-first-factory-in-brazil-and-introduces-a-technol-ctl01\/\" rel=\"nofollow noopener\" target=\"_blank\">Works of this magnitude are usually imagined as maps<\/a>, projections, and schedules. What happened now was different. The tunnel began to take shape on the seabed, with concrete, tugboats, hydraulic arms, laser, and tons of precision.<\/p>\n<p>The first successfully submerged element concludes nothing on its own, but changes everything in the project\u2019s perception. From this point on, the tunnel ceases to be merely an engineering promise and becomes a real structure, already installed on the seabed, paving the way for one of the most impressive submerged connections in global infrastructure.<\/p>\n<p>If the first block has already been successfully installed and the next 88 are yet to come, will the Fehmarnbelt tunnel merely be remembered as an engineering feat or can it truly change how Europe connects for centuries to come?<\/p>\n","protected":false},"excerpt":{"rendered":"The Fehmarnbelt tunnel reached its first major milestone physically completed after the successful installation of the first concrete&hellip;\n","protected":false},"author":2,"featured_media":79171,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[2],"tags":[42210,42211,42212,27,26,15518,26811,42213,42214],"class_list":["post-79170","post","type-post","status-publish","format-standard","has-post-thumbnail","category-denmark","tag-alemanha","tag-blocos","tag-blocos-gigantes","tag-danmark","tag-denmark","tag-dinamarca","tag-mar-baltico","tag-tunel","tag-tunel-imerso"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@dk\/116550713204669901","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/79170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/comments?post=79170"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/posts\/79170\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media\/79171"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/media?parent=79170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/categories?post=79170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/dk\/wp-json\/wp\/v2\/tags?post=79170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}