{"id":198832,"date":"2026-06-09T05:10:07","date_gmt":"2026-06-09T05:10:07","guid":{"rendered":"https:\/\/www.europesays.com\/ee\/198832\/"},"modified":"2026-06-09T05:10:07","modified_gmt":"2026-06-09T05:10:07","slug":"risti-hubriidpark-katab-haapsalu-kahe-oopaeva-elektritarbimise","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ee\/198832\/","title":{"rendered":"Risti h\u00fcbriidpark katab Haapsalu kahe \u00f6\u00f6p\u00e4eva elektritarbimise"},"content":{"rendered":"<p>            <a href=\"https:\/\/online.le.ee\/wp-content\/uploads\/2026\/06\/RRPS_BESS-Sunly_Latvia.jpg\" data-caption=\"Rolls-Royce Power Systems and Sunly have signed contracts for the construction of four large-scale battery storage systems in Latvia, with a total capacity of 490 MWh. The first hybrid energy park, featuring mtu EnergyPacks and solar panels (see graphic) will be commissioned in Valmiera in 2027.&#010;&#010;Rolls-Royce Power Systems und Sunly haben Vertr\u00e4ge \u00fcber den Bau von vier Batterie-Gro\u00dfspeichersystemen in Lettland mit einer Gesamtkapazit\u00e4t von 490 MWh unterzeichnet. Der erste Hybrid-Energiepark mit mtu EnergyPacks und Solaranlagen (siehe Grafik) wird 2027 in Valmiera in Betrieb genommen.\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" width=\"696\" height=\"389\" class=\"entry-thumb td-modal-image lazyload\" alt=\"\" title=\"RRPS_BESS Sunly_Latvia\" src=\"https:\/\/www.europesays.com\/ee\/wp-content\/uploads\/2026\/06\/RRPS_BESS-Sunly_Latvia-696x389.jpg\" decoding=\"async\"  data- data-eio-rwidth=\"696\" data-eio-rheight=\"389\"\/><\/a>Rolls-Royce Power Systems and Sunly have signed contracts for the construction of four large-scale battery storage systems in Latvia, with a total capacity of 490 MWh. The first hybrid energy park, featuring mtu EnergyPacks and solar panels (see graphic) will be commissioned in Valmiera in 2027.<\/p>\n<p>Rolls-Royce Power Systems und Sunly haben Vertr\u00e4ge \u00fcber den Bau von vier Batterie-Gro\u00dfspeichersystemen in Lettland mit einer Gesamtkapazit\u00e4t von 490 MWh unterzeichnet. Der erste Hybrid-Energiepark mit mtu EnergyPacks und Solaranlagen (siehe Grafik) wird 2027 in Valmiera in Betrieb genommen.<\/p>\n<p> Rolls-Royce&#8217;i akusalvestuss\u00fcsteem p\u00e4ikesepargi k\u00f5rval Valmiera l\u00e4hedal L\u00e4tis. Rolls-Royce<\/p>\n<p>Eesti taastuvenergia arendaja Sunly koos Rolls-Royce Power Systemsiga ehitab Ristile suure akusalvestuse h\u00fcbriidpargi. Park on nii suur, et sellega saaks katta Haapsalu linna suvise elektritarbimise kahel \u00f6\u00f6p\u00e4eval.<\/p>\n<p>Kokku plaanib Sunly ehitada viis salvestusparki. Neli neist ehitatakse L\u00e4tti; viies, parkidest suurim, tuleb aga Ristile. \u201eSinna kavandatud akupargi maht on 300 MWh. V\u00f5rdluseks: L\u00e4tis rajame nelja pargi peale kokku 490 Mwh salvestusv\u00f5imekust,\u201d \u00fctles Sunly ehitusjuht Marek Sakk L\u00e4\u00e4ne Elule.<\/p>\n<p>Sakk t\u00f5i v\u00e4lja, et akude laadimine s\u00f5ltub ilmast, tootmisest ja sellest, mida elektriv\u00f5rk parajasti vajab, kuid lisas, et akude maksimaalne t\u00e4islaadimine v\u00f5tab veidi \u00fcle kahe tunni. \u201e300 MWh on v\u00e4ga suur \u00fchekordne maht, millega saaks katta Haapsalu-suuruse linna suvise elektritarbimise kahel \u00f6\u00f6p\u00e4eval,\u201d \u00fctles ta.<\/p>\n<p>Artikkel j\u00e4tkub peale reklaami<img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-387649\" src=\"https:\/\/www.europesays.com\/ee\/wp-content\/uploads\/2026\/06\/1780981807_927_tasuline.png\" alt=\"\" width=\"688\" height=\"101\" data-eio=\"l\"\/><\/a><\/p>\n<p>Reklaam<\/p>\n","protected":false},"excerpt":{"rendered":"Rolls-Royce Power Systems and Sunly have signed contracts for the construction of four large-scale battery storage systems in&hellip;\n","protected":false},"author":2,"featured_media":198833,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[14],"tags":[131,130,37,33,35,34,36,83306,83307,9558],"class_list":["post-198832","post","type-post","status-publish","format-standard","has-post-thumbnail","category-ari","tag-ari","tag-business","tag-ee","tag-eesti","tag-eesti-keel","tag-estonia","tag-estonian","tag-marek-sakk","tag-risti-hubriidpark","tag-sunly"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ee\/116718431474417257","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/posts\/198832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/comments?post=198832"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/posts\/198832\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/media\/198833"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/media?parent=198832"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/categories?post=198832"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/tags?post=198832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}