{"id":95821,"date":"2026-01-29T07:03:06","date_gmt":"2026-01-29T07:03:06","guid":{"rendered":"https:\/\/www.europesays.com\/ee\/95821\/"},"modified":"2026-01-29T07:03:06","modified_gmt":"2026-01-29T07:03:06","slug":"lati-projektijuht-rail-balticu-valmimine-hilineb-mitu-aastat-valismaa","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ee\/95821\/","title":{"rendered":"L\u00e4ti projektijuht: Rail Balticu valmimine hilineb mitu aastat | V\u00e4lismaa"},"content":{"rendered":"<p>Rail Balticu raudtee esimese etapi valmimine v\u00f5ib kolm kuni viis aastat edasi l\u00fckkuda, \u00fctles projekti L\u00e4ti osa ehitamist juhtiva ettev\u00f5tte Eiropas Dzelzce\u013ca l\u012bnijas (EDzL, Euroopa raudteeliinid) juhatuse esimees M\u0101ris Dzelme. Tema s\u00f5nul takistab raudtee valmis ehitamist 2030. aasta l\u00f5puks rahapuudus.<\/p>\n<p>&#8220;Praktilisest ehituslikust vaatenurgast ei n\u00e4e ma praegu olemasoleva rahastamise juures mingit v\u00f5imalust Rail Balticu esimese etapi valmimiseks 2030. aastaks,&#8221; \u00fctles Dzelme kolmap\u00e4eval L\u00e4ti Televisiooni hommikusaates, mida vahendas L\u00e4ti rahvusringh\u00e4\u00e4lingu <a href=\"https:\/\/eng.lsm.lv\/article\/economy\/transport\/28.01.2026-latvian-project-head-rail-baltica-will-be-years-late.a631976\/\" target=\"_blank\" rel=\"noopener nofollow\">uudisteportaal LSM.lv<\/a>.<\/p>\n<p>Ta t\u00f5i v\u00e4lja, et esimese ehitusfaasi valmimise prognoosi saab teha siis, kui on selge, millal ja kui palju raha on selleks olemas. Raudtee esimene faas t\u00e4hendab \u00fche r\u00f6\u00f6papaariga \u00fchendust Balti riike Poolaga \u00fchendaval trassil.<\/p>\n<p>&#8220;See ei l\u00e4he sujuvalt ja ilusti. Kuidas see saab sujuvalt ja ilusti minna, kui raha pole? Me saame edasi liikuda tempos, mida meile antav raha v\u00f5imaldab. See projekt maksab raha,&#8221; r\u00e4\u00e4kis Dzelme.<\/p>\n<p>Ta t\u00f5i ka v\u00e4lja, et Rail Balticu esimese etapi projekt plaanitakse L\u00e4tis \u00fcmber teha.<\/p>\n<p>&#8220;\u00dcmberprojekteerimine ei tulene mitte ainult vajadusest v\u00e4hendada raudteeinfrastruktuuri ehituse ulatust, vaid ka vajadusest v\u00e4hendada kulusid,&#8221; \u00fctles Dzelme.<\/p>\n<p>\u00dcmberprojekteerimine v\u00f5ib maksta umbes kaheksa miljonit eurot, kuid tema s\u00f5nul peaks see s\u00e4\u00e4stma 100\u2013200 miljonit eurot.<\/p>\n","protected":false},"excerpt":{"rendered":"Rail Balticu raudtee esimese etapi valmimine v\u00f5ib kolm kuni viis aastat edasi l\u00fckkuda, \u00fctles projekti L\u00e4ti osa ehitamist&hellip;\n","protected":false},"author":2,"featured_media":95822,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[14],"tags":[131,130,37,33,35,34,36,46505,46504],"class_list":{"0":"post-95821","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-ari","8":"tag-ari","9":"tag-business","10":"tag-ee","11":"tag-eesti","12":"tag-eesti-keel","13":"tag-estonia","14":"tag-estonian","15":"tag-maris-dzelme","16":"tag-rail-baltic-lati"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ee\/115977113418051946","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/posts\/95821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/comments?post=95821"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/posts\/95821\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/media\/95822"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/media?parent=95821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/categories?post=95821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ee\/wp-json\/wp\/v2\/tags?post=95821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}