{"id":24429,"date":"2026-05-26T11:30:14","date_gmt":"2026-05-26T11:30:14","guid":{"rendered":"https:\/\/www.europesays.com\/france\/24429\/"},"modified":"2026-05-26T11:30:14","modified_gmt":"2026-05-26T11:30:14","slug":"schneider-electric-delivers-ai-infra-for-terawulf-campus-set-to-reach-750-mw","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/france\/24429\/","title":{"rendered":"Schneider Electric delivers AI infra for TeraWulf campus, set to reach 750 MW"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Schneider Electric and Motivair have completed a phased delivery of more than $290 million in AI infrastructure for TeraWulf\u2019s Lake Mariner campus in New York. The campus targets up to 750 MW of power demand at full buildout and counts Core42 and Fluidstack, the latter backed by Google, as anchor tenants.<\/p>\n<p class=\"wp-block-paragraph\">TeraWulf\u2019s Lake Mariner facility in upstate New York is among the most ambitious brownfield-to-data-center conversions currently underway in the U.S., the companies note. The campus occupies former industrial land with access to an existing power grid\u2014one whose regional mix is approximately 89% zero-carbon. Schneider Electric and Motivair have now completed a phased delivery of more than $290 million in AI infrastructure for the site, covering power, cooling, and digital intelligence for HPC and AI workloads.<\/p>\n<p class=\"wp-block-paragraph\">The campus is designed to support up to 750 MW of power demand at full buildout. TeraWulf signed a 10-year lease with Core42 to deliver <a href=\"https:\/\/www.datacenterdynamics.com\/en\/news\/terawulf-inks-ten-year-data-center-lease-agreement-with-core42-at-lake-mariner-campus\/\" target=\"_blank\" rel=\"nofollow noopener\">more than 70 MW of turnkey AI data center capacity<\/a> in phases. A separate set of agreements covers <a href=\"https:\/\/investors.terawulf.com\/news-events\/press-releases\/detail\/112\/terawulf-signs-200-mw-10-year-ai-hosting-agreements-with-fluidstack\" target=\"_blank\" rel=\"nofollow noopener\">over 200 MW of critical IT load for Fluidstack<\/a>, an AI cloud platform backed by Google. Both deals are long-term, ten-year commitments.<\/p>\n<p>Purpose-built for AI workloads<\/p>\n<p class=\"wp-block-paragraph\">Schneider Electric acquired a controlling stake in Motivair in early 2025, adding direct liquid-cooling hardware to its data center portfolio. The two companies now offer an integrated stack, from <a href=\"https:\/\/blog.se.com\/datacenter\/2025\/03\/19\/cooling-ai-data-centers-schneider-electric-motivair-changing-game\/\" target=\"_blank\" rel=\"nofollow noopener\">power distribution to coolant distribution units and cold plates<\/a>, aimed at AI racks running at 100 kW and above. Motivair has also <a href=\"https:\/\/www.motivaircorp.com\/news\/motivair-by-schneider-electric-expands-u-s-manufacturing-footprint\/\" target=\"_blank\" rel=\"nofollow noopener\">expanded its U.S. manufacturing footprint<\/a>, opening a fourth production facility in Buffalo, New York in mid-2025 to accelerate liquid cooling supply for AI and HPC deployments.<\/p>\n<p class=\"wp-block-paragraph\">At Lake Mariner, the project required both companies to meet demanding construction timelines as TeraWulf sought to bring purpose-built AI data centers online within a twelve-month window.<\/p>\n<p class=\"wp-block-paragraph\">\u201cTeraWulf\u2019s strategy is centered on delivering scalable, energy efficient infrastructure capable of supporting the increasing intensity of AI and HPC workloads,\u201d said Sean Farrell, COO at TeraWulf. \u201cBy working closely with industry leaders like Schneider Electric and Motivair, we are accelerating the development of AI-ready capacity at our Lake Mariner facilities while reinforcing the strong operational foundations needed to support long-term customer demand.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The site is a <a href=\"https:\/\/www.ramboll.com\/news\/ramboll-terawulf-turning-coal-fired-power-plant-site-into-low-carbon-digital-hub\" target=\"_blank\" rel=\"nofollow noopener\">brownfield transformation of a retired coal-fired generation site<\/a>, repurposing dual 345 kV transmission lines and existing grid infrastructure rather than building new greenfield transmission capacity.<\/p>\n<p class=\"wp-block-paragraph\">Also read: <a href=\"https:\/\/www.techzine.eu\/blogs\/devices\/128816\/schneider-electric-how-do-you-bend-the-energy-curve\/\" type=\"blogs\" id=\"128816\" rel=\"nofollow noopener\" target=\"_blank\">Schneider Electric: how do you bend the energy curve?<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"Schneider Electric and Motivair have completed a phased delivery of more than $290 million in AI infrastructure for&hellip;\n","protected":false},"author":2,"featured_media":24430,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13020],"tags":[17967,17968,7443,17969,17970,17971,17112,17114,13057,17972],"class_list":["post-24429","post","type-post","status-publish","format-standard","has-post-thumbnail","category-schneider-electric","tag-ai-data-center","tag-core42","tag-data-center-infrastructure","tag-fluidstack","tag-hpc","tag-lake-mariner","tag-liquid-cooling","tag-motivair","tag-schneider-electric","tag-terawulf"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/posts\/24429","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/comments?post=24429"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/posts\/24429\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/media\/24430"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/media?parent=24429"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/categories?post=24429"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/france\/wp-json\/wp\/v2\/tags?post=24429"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}