{"id":55,"date":"2026-07-30T11:24:30","date_gmt":"2026-07-30T11:24:30","guid":{"rendered":"https:\/\/www.europesays.com\/gbr\/dev\/55\/"},"modified":"2026-07-30T11:24:30","modified_gmt":"2026-07-30T11:24:30","slug":"sidmouth-faces-wait-before-work-starts-on-towns-coastal-defences","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/gbr\/dev\/55\/","title":{"rendered":"Sidmouth faces wait before work starts on town&#8217;s coastal defences"},"content":{"rendered":"<p>Protecting Sidmouth from the sea is at least a year away after the district council announced the detailed planning stage of the town\u2019s coastal defence work will not be completed until autumn 2027.<\/p>\n<p>East Devon District Council (EDDC) this week revealed it had picked a contractor for the town\u2019s \u00a321million coastal defence work.<\/p>\n<p>EDDC hoped the first stage of detailed design and further technical work would be completed in autumn 2027.<\/p>\n<p>The contract has gone to a Hampshire-based firm to carry out the design and delivery of shoring up Sidmouth seafront and East Beach from rising sea levels.<\/p>\n<p>The district council said the multi-million-pound work would help protect Sidmouth seafront \u2013 and areas between Jacob\u2019s Ladder and East Beach \u2013 from erosion and flooding for the next 100 years.<\/p>\n<p>Planned work involves \u2018reshaping and strengthening the beach\u2019, \u00a0building new structures offshore and on the shoreline to help break up waves and keep more sand and shingle in place.<\/p>\n<p>EDDC said the aim was to reduce the risk of flooding and damage to homes, businesses and the promenade over the long term, \u2018while keeping the beach usable and looking as natural as possible\u2019.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-46422\" class=\"size-full wp-image-46422 lazyload\" src=\"https:\/\/www.europesays.com\/gbr\/dev\/wp-content\/uploads\/2026\/07\/EDDC_Sidmouth_Defences--scaled.jpg\" alt=\"\" width=\"2560\" height=\"1804\"  \/><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" aria-describedby=\"caption-attachment-46422\" class=\"size-full wp-image-46422 lazyload\" src=\"https:\/\/www.europesays.com\/gbr\/dev\/wp-content\/uploads\/2026\/07\/1785410669_637_EDDC_Sidmouth_Defences--scaled.jpg\" alt=\"\" width=\"702\" height=\"495\"  \/><\/p>\n<p id=\"caption-attachment-46422\" class=\"wp-caption-text\">Map shows the areas of Sidmouth beach where coastal defence work will be carried out.<br \/>Image: EDDC.<\/p>\n<p>After consulting residents and businesses, the authority said the work would be carried out in two stages, to include environmental assessments and construction preparation.<\/p>\n<p>The proposed coastal defence work includes:<\/p>\n<p>New offshore breakwatersAdding shingle on Town Beach and East BeachNew 120m groyne to the east of East BeachReplacement of existing splash wall foundations for future upgradesImproved flood gates on the EsplanadeNew access ramp at the eastern end of Town BeachNew\u202fflood defences at the eastern end of Town Beach for new ramp accessRepairs and improvements to the River Sid wall<\/p>\n<p style=\"font-weight: 400;\">EDDC said the long-term investment in Sidmouth and East Beach would help protect homes, businesses, roads, services and the local environment from flooding, erosion, rising sea levels and climate change<\/p>\n<p style=\"font-weight: 400;\">Councillor Geoff Jung, EDDC portfolio holder for environment, said:\u202f\u201cAppointing a supplier to develop the detailed design is a major step forward for Sidmouth and East Beach Coastal Defence Scheme.<\/p>\n<p style=\"font-weight: 400;\">\u201cThis milestone brings us closer to protecting Sidmouth\u2019s coastline, homes and businesses for the long term.<\/p>\n<p style=\"font-weight: 400;\">\u201cWe will continue working with partners and the local community to shape a scheme that delivers lasting protection while respecting the character of the town.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-46423\" class=\"size-full wp-image-46423 lazyload\" src=\"https:\/\/www.europesays.com\/gbr\/dev\/wp-content\/uploads\/2026\/07\/Sidmouth-East-Beach-Coastal-Defense-Scheme-goes-ahead-scaled.jpg\" alt=\"Sidmouth\" width=\"2560\" height=\"1508\"  \/><img loading=\"lazy\" data-recalc-dims=\"1\" decoding=\"async\" aria-describedby=\"caption-attachment-46423\" class=\"size-full wp-image-46423 lazyload\" src=\"https:\/\/www.europesays.com\/gbr\/dev\/wp-content\/uploads\/2026\/07\/1785410670_517_Sidmouth-East-Beach-Coastal-Defense-Scheme-goes-ahead-scaled.jpg\" alt=\"Sidmouth\" width=\"702\" height=\"414\"  \/><\/p>\n<p id=\"caption-attachment-46423\" class=\"wp-caption-text\">Pictured here, L to R are: Steve Donnelly, South West Flood and Coastal, Tony Burch, Advisory Group), Andrew Hancock, Tom Buxton-Smith, Cllr Geoff Jung, Cllr Ian Barlow, all from EDDC, Cllr Hilary Nelson, Cllr Chris Lockyear both from Sidmouth Town Council, Steve Kershaw (South West Flood and Coastal). Photo: EDDC.<\/p>\n<p style=\"font-weight: 400;\">Contractor Boskalis Westminster Limited will work in partnership with the\u202fSouth West\u202fFlood and\u202fCoastal team, East Devon District Council, and key partners including the Environment Agency,\u202fDevon County\u202fCouncil\u202fand\u202fSidmouth\u202fTown Council.<\/p>\n<p style=\"font-weight: 400;\">A spokesperson for Boskalis Westminster Ltd said: \u201cWe are committed to working closely with EDDC, South West Flood and Coastal team and the local community to ensure that the completed scheme not only provides enhanced coastal defence but is also sympathetic to the needs of residents and UNESCO World Heritage site at East Beach.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"Protecting Sidmouth from the sea is at least a year away after the district council announced the detailed&hellip;\n","protected":false},"author":2,"featured_media":56,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[2],"tags":[3,22,23,24,25,26,27,28,29,30,31,32],"class_list":["post-55","post","type-post","status-publish","format-standard","has-post-thumbnail","category-news","tag-devon","tag-devon-news","tag-east-devon-beaches","tag-east-devon-news","tag-east-devon-picks","tag-jacobs-ladder-sidmouth","tag-sidmouth-beach","tag-sidmouth-coastal-defence","tag-sidmouth-news","tag-sidmouth-picks","tag-sidmouth-seafront","tag-top-picks"],"share_on_mastodon":{"url":"","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/posts\/55","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/comments?post=55"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/posts\/55\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/media\/56"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/media?parent=55"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/categories?post=55"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/gbr\/dev\/wp-json\/wp\/v2\/tags?post=55"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}