MetOceanWorks has announced that its metocean design basis for EnBW’s 1
GW Dreekant
offshore wind farm

has received independent certification from TÜV SÜD.



The company was appointed to the project back in 2025 to develop a 45 year
wind, wave and hydrodynamic hindcast to support the wind farm’s design
and development.


The design basis was created using measurements collected across the region
to establish both normal and extreme conditions, ensuring compliance with
the requirements of BSH and IEC standards.



The certified design basis will support the detailed engineering and design
of the project’s wind turbines and foundations.



In addition, MetOceanWorks completed a seabed mobility study covering both
the wind farm site and the associated export cable corridor.

The study evaluated
potential changes in seabed levels to support engineering, installation
and project planning activities throughout the project’s development.

For more information about offshore wind
farm projects across the globe, click
here
.