{"id":100912,"date":"2026-09-30T12:09:14","date_gmt":"2026-09-30T12:09:14","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/100912\/"},"modified":"2026-09-30T12:09:14","modified_gmt":"2026-09-30T12:09:14","slug":"hydrogen-pipeline-construction-begins-bmw-group-to-integrate-plant-leipzig-into-core-hydrogen-grid","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/100912\/","title":{"rendered":"Hydrogen pipeline construction begins: BMW Group to integrate Plant Leipzig into core hydrogen grid."},"content":{"rendered":"<p>\n  Leipzig. BMW Group Plant Leipzig has today marked the<br \/>\n  official start of construction of a hydrogen pipeline that will<br \/>\n  connect the plant directly to the hydrogen grid. The roughly<br \/>\n  two-kilometre-long link is scheduled to be completed and commissioned<br \/>\n  in the first half of 2028, making Plant Leipzig the first vehicle<br \/>\n  plant worldwide with a direct connection to a hydrogen grid.<\/p>\n<p>Among those attending today\u2019s milestone event were Prime Minister<br \/>\n  of the Free State of Saxony Michael Kretschmer and Parliamentary State<br \/>\n  Secretary to the Federal Minister for Transport, Christian Hirte. The<br \/>\n  involvement of both the Free State of Saxony and the German government<br \/>\n  highlights the importance of the project, which sees industry, energy<br \/>\n  partners and policymakers working closely to establish a<br \/>\n  high-performance hydrogen infrastructure that will be key to<br \/>\n  safeguarding Germany\u2019s long-term competitiveness as an industrial<br \/>\n    base.\u00a0The pipeline project is co-financed by the European Fund<br \/>\n    for Regional Development (EFRE) and the Free State of Saxony and<br \/>\n    will play a fundamental role in the development a resilient and<br \/>\n  sustainable hydrogen infrastructure in the federal state.<\/p>\n<p>\u201cBMW has been demonstrating for years how hydrogen can be used in<br \/>\n  industrial production. The new pipeline will establish Leipzig as a<br \/>\n  key hub for the hydrogen economy and make it one of the first<br \/>\n  industrial sites in Saxony to be connected to the core hydrogen<br \/>\n  network. This will strengthen the competitiveness of our industry and<br \/>\n  lay the foundations for delivering hydrogen where it is needed for<br \/>\n  production\u201d, says Prime Minister Kretschmer.<\/p>\n<p>BMW Group advances innovative use of hydrogen in Leipzig<\/p>\n<p>Plant Leipzig has been leveraging hydrogen in intralogistics<br \/>\n  since 2013 and today operates Europe\u2019s largest hydrogen<br \/>\n  fuel-cell-powered intralogistics fleet, comprising more than 230<br \/>\n  forklifts and tug trains. Since 2022, the plant has also been using<br \/>\n  hydrogen in its paint shop, which now operates eleven dual-fuel paint<br \/>\n  furnaces that can switch flexibly between natural gas and hydrogen.<\/p>\n<p>\u201cThis pipeline will enable us to power our paint shop with<br \/>\n  hydrogen to a far greater extent than ever before. It marks an<br \/>\n  important milestone and lays the foundation for greater energy<br \/>\n  resilience. It also offers significant potential to further<br \/>\n  decarbonise production,\u201d said Petra Peterh\u00e4nsel, Plant Director at BMW<br \/>\n  Group Plant Leipzig.<\/p>\n<p>Once connected to the grid, Plant Leipzig will be able to power<br \/>\n  high-temperature, energy-intensive processes such as paint-drying<br \/>\n  purely with hydrogen rather than natural gas. The use of dual-fuel gas<br \/>\n  and hydrogen burners in the paint shop is already providing valuable<br \/>\n  insights into the technical and commercial aspects of commissioning a<br \/>\n  hydrogen core network while ensuring optimal operational performance.<\/p>\n<p>Local solutions for effective energy management<\/p>\n<p>The forthcoming pipeline in Leipzig is just one element in<br \/>\n  the BMW Group\u2019s broader global energy management. Rather than adopting<br \/>\n  a one-size-fits-all approach, the company pursues a technology-neutral<br \/>\n  pathway, developing the best possible solution for each individual<br \/>\n  location. At Leipzig, years of experience with hydrogen and its<br \/>\n  industrial applications, along with the direct connection to the<br \/>\n  emerging hydrogen infrastructure, lay the foundation for a resilient,<br \/>\n  long-term energy supply.<\/p>\n<p>Think global, act local<\/p>\n<p>The BMW Group implements site-specific energy solutions<br \/>\n  across its locations. Crucially, these take into account the local<br \/>\n  infrastructure, costs and available energy sources, ensuring secure<br \/>\n  and competitive supplies, and supporting decarbonisation. Going<br \/>\n  forward, BMW Group locations will evolve into what is known as<br \/>\n  \u201cprosumers\u201d, not only consuming energy but also generating and storing<br \/>\n  it for flexible use.<\/p>\n<p>Complementing this approach, the BMW Group is advancing digital<br \/>\n  energy management. Here, virtual power plants enable the data-driven<br \/>\n  optimisation of energy flows by connecting producers, consumers and<br \/>\n  storage facilities. This way, sites can manage loads more flexibly and<br \/>\n  support grid stability while reducing their dependence on market and<br \/>\n  price fluctuations.<\/p>\n<p>Successful transformation depends on reliable framework conditions<\/p>\n<p>For industry to transition to hydrogen-based energy,<br \/>\n  collaboration with energy providers and policymakers is essential.<br \/>\n  Accelerated energy infrastructure development is also required, along<br \/>\n  with internationally competitive energy costs and robust quality<br \/>\n  certification standards. For molecular fuels, this means rapidly<br \/>\n  establishing a core hydrogen grid along with the associated<br \/>\n  distribution infrastructure. In addition, grid charges must be<br \/>\n  competitive, and low-cost, climate-friendly fuels must be accessible.<br \/>\n  Investment and planning certainty are also crucial, along with<br \/>\n  practical certifications that are recognised across Europe.<\/p>\n<p>Strong partners for a resilient energy supply<\/p>\n<p>Connecting BMW Group Plant Leipzig to the core hydrogen<br \/>\n  network of the future is a joint undertaking between industry and<br \/>\n  energy partners. The BMW Group has signed a capacity reservation<br \/>\n  contract with ONTRAS Gastransport GmbH, the company responsible for<br \/>\n  developing the region\u2019s core hydrogen grid. Construction of the<br \/>\n  pipeline link itself, along with the associated gas pressure<br \/>\n  regulation and metering station, will be carried out by MITNETZ GAS<br \/>\n  GmbH. Together, the project partners are advancing the use of hydrogen<br \/>\n  as an energy source in industry and laying the foundation for a more<br \/>\n  resilient long-term energy supply at Plant Leipzig.<\/p>\n<p>Resilient energy supply is not purely a matter for industry,<br \/>\n  energy and policymakers, however. It also involves the wider<br \/>\n  community. When it comes to establishing acceptance and planning<br \/>\n  certainty, the BMW Group sees transparency, reliability and early<br \/>\n  community involvement as vital. Projects such as the hydrogen pipeline<br \/>\n  in Leipzig support industrial competitiveness, decarbonisation and<br \/>\n  value creation in the region.<\/p>\n","protected":false},"excerpt":{"rendered":"Leipzig. BMW Group Plant Leipzig has today marked the official start of construction of a hydrogen pipeline that&hellip;\n","protected":false},"author":2,"featured_media":100913,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20955],"tags":[6213,3010,9427,4285,7561,21118],"class_list":["post-100912","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bmw","tag-bmw","tag-hydrogen","tag-leipzig","tag-plants","tag-production","tag-recycling"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/100912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=100912"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/100912\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/100913"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=100912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=100912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=100912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}