{"id":114458,"date":"2026-10-23T10:38:16","date_gmt":"2026-10-23T10:38:16","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/114458\/"},"modified":"2026-10-23T10:38:16","modified_gmt":"2026-10-23T10:38:16","slug":"board-approves-310-4m-mbta-locomotive-purchase-from-siemens","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/114458\/","title":{"rendered":"Board approves $310.4M MBTA locomotive purchase from Siemens"},"content":{"rendered":"<p>Board members approved a $310.4 million MBTA locomotive purchase from Siemens on October 22, covering 10 Tier 4 diesel-electric and 10 dual mode battery\/catenary units for Commuter Rail.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/10\/mbta-siemens-locomotive-rendering.webp\"><img data-rws-image-box=\"1600x900\" style=\"width:min(100%,1600px);height:auto;aspect-ratio:1600\/900;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-192565\" src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/10\/mbta-siemens-locomotive-rendering.webp\" alt=\"Rendering of a Siemens locomotive in purple and silver MBTA livery\" width=\"1600\" height=\"900\"  \/><\/a>Rendering of a Siemens locomotive in MBTA livery. Image: MBTA.<\/p>\n<p>The vote, reported by the State House News Service from Thursday\u2019s meeting, authorizes General Manager Phillip Eng, or his designee, to award Formal Contract 187F-25 to Siemens. Under the <a href=\"https:\/\/cdn.mbta.com\/sites\/default\/files\/2026-10\/2026-10-22-locomotive-procurement.pdf\" rel=\"nofollow noopener\" target=\"_blank\">staff recommendation presented to the board<\/a>, the not-to-exceed amount of $310,359,988 also covers capital spares, a simulator and special tools.<\/p>\n<p>Project budget and funding sources<\/p>\n<p>That figure is the material line of a wider project budget of $373,769,818. The remaining lines are $20.6 million for professional services, $5.3 million for force account work, $6.2 million for project administration, $7.6 million in indirect costs and a $23.8 million contingency, which the MBTA says includes anticipated change orders for platform integration modifications. The project draws on a mix of federal and state money, including <a href=\"https:\/\/www.railway.supply\/massdot-board-authorizes-200-million-for-20-mbta-commuter-rail-locomotives\/\" rel=\"nofollow noopener\" target=\"_blank\">$200 million approved by the MassDOT Board of Directors on September 23, 2026<\/a>.<\/p>\n<p>Aging GP40, F40 and HSP46 fleets<\/p>\n<p>The MBTA told the board it has an immediate need for new locomotives. Its GP40 units were built more than 50 years ago and remanufactured 28 to 29 years ago, and 13 of them are already past their useful life. The F40 fleet, built 33 to 39 years ago, reaches the end of its useful life between 2029 and 2035. The newer HSP46 locomotives, which the MBTA lists as built 14 years ago, are entering a mid-life overhaul that will keep up to 10 units out of service from 2029 into 2031 or later. The new order is meant to let the agency retire the least reliable F40 and GP40 units.<\/p>\n<p>Deliveries, emissions and further options<\/p>\n<p>Pilot locomotives are expected less than three years after notice to proceed. The MBTA\u2019s project chart places that notice around the end of 2026 and design review in 2027, followed by diesel deliveries around 2029 and 2030 and battery\/catenary deliveries around 2030 and 2031.<\/p>\n<p>According to the MBTA, the Siemens locomotives will cut local emissions by more than 75% compared with its current fleet, while the battery\/catenary units produce no local emissions and can run under segmented catenary. The agency describes the diesel-electric design as service-proven, with more than 440 built or on order, and says both types share major components such as trucks, traction equipment, cabs and controls. The battery\/catenary units are initially designated for the Providence Line, where overhead power is already in place for Amtrak trains, SHNS reported.<\/p>\n<p>The contract also carries options for up to 50 more locomotives to fully replace the legacy fleets, subject to available funding. The MBTA presents the purchase as progress toward its Regional Rail Initiative. Transit advocates used the public comment period to question why the agency is buying diesel units while it plans for electrification, the news service reported.<\/p>\n<p>How the order compares with Metro-North\u2019s battery locomotives<\/p>\n<p>In February 2025, Metro-North asked the MTA Board to <a href=\"https:\/\/www.mta.info\/document\/164881\" rel=\"nofollow noopener\" target=\"_blank\">exercise an option on its existing Siemens contract<\/a> for 13 dual-mode locomotives with battery and AC power systems, plus an option for two more, at a combined $304,941,000. Siemens adapted its Tier 4 dual-mode diesel-electric design for that order, using traction batteries in place of the diesel engine and an AC pantograph instead of third-rail equipment for running under catenary. The units are meant for Penn Station Access service and are scheduled for delivery from January 2029 through July 2030.<\/p>\n<p>MBTA and Metro-North battery\/catenary locomotive orders with Siemens<\/p>\n<p>Item<br \/>\nMBTA Commuter Rail<br \/>\nMetro-North (Penn Station Access)<\/p>\n<p>Board action<br \/>\nAuthorization to award Formal Contract 187F-25, October 22, 2026<br \/>\nRequest to exercise Option 4 on Siemens contract 244941, February 2025<\/p>\n<p>Locomotives<br \/>\n10 Tier 4 diesel-electric and 10 dual mode battery\/catenary<br \/>\n13 dual-mode units with battery and AC power systems, plus an option for 2<\/p>\n<p>Amount<br \/>\nUp to $310,359,988, including capital spares, a simulator and special tools<br \/>\n$304,941,000, including the option for 2 locomotives<\/p>\n<p>Delivery<br \/>\nDiesel around 2029\u20132030, battery\/catenary around 2030\u20132031 (project chart)<br \/>\nJanuary 2029 to July 2030<\/p>\n<p>Further options<br \/>\nUp to 50 locomotives, pending funding<br \/>\nApparatus such as test equipment, tools and spare parts<\/p>\n<p>Answer and source<br \/>\nThe two amounts are close but cover different scopes, so no per-locomotive price is derived. Sources: <a href=\"https:\/\/cdn.mbta.com\/sites\/default\/files\/2026-10\/2026-10-22-locomotive-procurement.pdf\" rel=\"nofollow noopener\" target=\"_blank\">MBTA presentation<\/a>, slides 2, 4 and 6, and <a href=\"https:\/\/www.mta.info\/document\/164881\" rel=\"nofollow noopener\" target=\"_blank\">MTA procurement staff summary<\/a>, Schedule I.<\/p>\n","protected":false},"excerpt":{"rendered":"Board members approved a $310.4 million MBTA locomotive purchase from Siemens on October 22, covering 10 Tier 4&hellip;\n","protected":false},"author":2,"featured_media":114459,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21002],"tags":[73940,24460,6487,22225],"class_list":["post-114458","post","type-post","status-publish","format-standard","has-post-thumbnail","category-siemens","tag-mbta","tag-procurement-of-railway-rolling-stock","tag-siemens","tag-siemens-mobility"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/114458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=114458"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/114458\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/114459"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=114458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=114458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=114458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}