{"id":122561,"date":"2026-11-05T01:35:36","date_gmt":"2026-11-05T01:35:36","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/122561\/"},"modified":"2026-11-05T01:35:36","modified_gmt":"2026-11-05T01:35:36","slug":"german-regulator-awards-contracts-for-5-2-gw-of-new-gas-capacity-rwe-to-build-2-1-gw-of-gas-fired-power-plants-in-germany","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/122561\/","title":{"rendered":"German regulator awards contracts for 5.2 GW of new gas capacity RWE to build 2.1 GW of gas-fired power plants in Germany"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Germany\u2019s federal energy regulator, Bundesnetzagentur, <a href=\"https:\/\/www.bundesnetzagentur.de\/SharedDocs\/Pressemitteilungen\/EN\/2026\/20261103_StromVKG.html\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">has awarded 11 contracts<\/a> for long-term generating capacity projects totaling nearly 5.2 GW, with almost all of it going to LEAG (about 3 GW) and German energy giant RWE (about 2.1 GW).<\/p>\n<p class=\"wp-block-paragraph\">The awards, announced Nov. 3, are part of Bundesnetzagentur\u2019s broader \u20ac9 billion ($10.1 billion) investment strategy to expand flexible generation, battery storage and hydrogen production over the next five years.<\/p>\n<p class=\"wp-block-paragraph\">North Rhine-Westphalia, where <a href=\"https:\/\/www.rwe.com\/en\/press\/rwe-ag\/2026-11-03-rwe-set-to-build-three-new-hydrogen-compatible-power-stations-in-germany\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">RWE\u2019s plants will be built,<\/a> secured the largest share of awards. Other winning projects included Brandenburg (1.8 GW), Saxony (910 MW), Bavaria (269 MW) and Baden-W\u00fcrttemberg (45 MW).<\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.leag.de\/de\/news\/details\/leag-erhaelt-zuschlaege-fuer-sieben-zukunftskraftwerke-in-der-lausitz-und-in-bayern\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">LEAG won contracts<\/a> for new gas-fired units at its J\u00e4nschwalde (Brandenburg), Boxberg (Saxony) and Leipheim (Bavaria) sites, totaling 3,680 MW of installed capacity, or 2,998 rMW. All three projects will use existing energy sites and are being designed for future hydrogen use. They must be commissioned by the end of 2031.<\/p>\n<p class=\"wp-block-paragraph\">The funding for North Rhine-Westphalia will support three new RWE combined-cycle gas and steam power stations in Voerde, Weisweiler and Werne.<\/p>\n<p class=\"wp-block-paragraph\">Each new facility in the state will provide about 700 to 730 rMW of qualifying capacity, strengthening electricity supply reliability in one of the country\u2019s major industrial regions.<\/p>\n<p class=\"wp-block-paragraph\">The projects will expand RWE\u2019s existing German gas-fired power portfolio, which currently totals approximately 4.2 GW.<\/p>\n<p class=\"wp-block-paragraph\">RWE expects construction of the first plant to begin within weeks, as the utility has already begun preparing the three sites, commissioning international consortia to plan regulatory approvals, securing manufacturing capacity for key components, and initiating permitting procedures.<\/p>\n","protected":false},"excerpt":{"rendered":"Germany\u2019s federal energy regulator, Bundesnetzagentur, has awarded 11 contracts for long-term generating capacity projects totaling nearly 5.2 GW,&hellip;\n","protected":false},"author":2,"featured_media":122562,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[664,5,3010,5885,26676,77740,77741,77742],"class_list":["post-122561","post","type-post","status-publish","format-standard","has-post-thumbnail","category-germany","tag-bundesnetzagentur","tag-germany","tag-hydrogen","tag-north-rhine-westphalia","tag-rwe","tag-voerde","tag-weisweiler","tag-werne"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/122561","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=122561"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/122561\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/122562"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=122561"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=122561"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=122561"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}