{"id":126684,"date":"2026-11-11T11:53:10","date_gmt":"2026-11-11T11:53:10","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/126684\/"},"modified":"2026-11-11T11:53:10","modified_gmt":"2026-11-11T11:53:10","slug":"taoyuan-metro-signaling-to-use-siemens-signaling-x","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/126684\/","title":{"rendered":"Taoyuan Metro signaling to use Siemens Signaling X"},"content":{"rendered":"<p>Siemens Mobility will supply Taoyuan Metro signaling for the Brown Line and the Green Line extension to Zhongli, introducing Signaling X in Taiwan, with GoA4 driverless operation on both projects.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/signaling-x-metro-control-room-singapore-rail-test-centre.webp\"><img data-rws-image-box=\"1600x900\" style=\"width:min(100%,1600px);height:auto;aspect-ratio:1600\/900;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-194055\" src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/signaling-x-metro-control-room-singapore-rail-test-centre.webp\" alt=\"Siemens engineer pointing at a metro track layout on a control room video wall while two colleagues watch\" width=\"1600\" height=\"900\"  \/><\/a>Engineers in a metro control room running Signaling X at the Singapore Rail Test Centre. Photo: Siemens Mobility<\/p>\n<p><a href=\"https:\/\/press.siemens.com\/global\/en\/pressrelease\/siemens-upgrade-taiwans-taoyuan-metro-signaling-x-technology\" rel=\"nofollow noopener\" target=\"_blank\">Siemens announced the two contracts on November 5<\/a>. They were awarded by the Urban Solutions business of ST Engineering, the turnkey rail services provider handling project management and systems integration, and signed during this year\u2019s Singapore Urban Mobility Week by representatives of Siemens Mobility\u2019s Taiwan branch and ST Engineering.<\/p>\n<p>Siemens will equip the Brown Line as well as the Green Line extension, which will run to Zhongli Station, where its terminus G25 is planned to share an extended platform with Airport MRT station A23. The scope covers fully automated train operation at Grade of Automation 4 (GoA4) and Automatic Train Supervision (ATS). Siemens puts commissioning of the new sections in the mid-2030s.<\/p>\n<p>Where Siemens sits in Taoyuan\u2019s turnkey packages<\/p>\n<p>Taoyuan City Government awarded the Brown Line turnkey contract in July 2026 to a consortium of ST Engineering and Hyundai Rotem. Under that deal, <a href=\"https:\/\/www.stengg.com\/en\/newsroom\/news-releases\/st-engineering-win-840m-taoyuan-mrt-brown-line-contract\/\" rel=\"nofollow noopener\" target=\"_blank\">ST Engineering leads project management and systems integration<\/a>, supplies SCADA, communications, fare collection and platform screen doors, and is responsible for delivering the signaling system and track works. Hyundai Rotem provides the rolling stock and power supply. In July, ST Engineering said it expected work to begin in the fourth quarter of 2026 and run for eight years. The company puts the line at 11.38 km with seven stations between Taoyuan City and the Greater Taipei area.<\/p>\n<p>The same two companies hold the electrical and mechanical turnkey package for the Green Line extension, awarded in August 2026. That package covers seven trains, track and core systems including signaling, and uses a CBTC system compatible with the existing Green Line so that trains can run in GoA4 mode, <a href=\"https:\/\/udn.com\/news\/story\/7324\/9727840\" rel=\"nofollow noopener\" target=\"_blank\">Taoyuan officials said at the September 1 signing<\/a>. City officials put the extension at about 7.1 km with six stations, running from station G01 in Bade to Zhongli.<\/p>\n<p>At the September 1 signing, Taoyuan Mayor Chang San-cheng set a 2031 target for completing and opening the Green Line extension. For the Brown Line, which will carry 15 trains under its own package, the city is aiming for <a href=\"https:\/\/www.cna.com.tw\/news\/aloc\/202608190144.aspx\" rel=\"nofollow noopener\" target=\"_blank\">completion and opening in 2032<\/a>.<\/p>\n<p>Taoyuan Brown Line and Green Line extension at a glance. Brown Line length and stations as given by ST Engineering (Siemens counts eight stations), extension figures as given by Taoyuan officials at the September 2026 signing. Target years refer to completion and opening as stated by the city in August and September 2026. Siemens puts commissioning of both sections in the mid-2030s. Sources: <a href=\"https:\/\/www.stengg.com\/en\/newsroom\/news-releases\/st-engineering-win-840m-taoyuan-mrt-brown-line-contract\/\" rel=\"nofollow noopener\" target=\"_blank\">ST Engineering<\/a>, <a href=\"https:\/\/press.siemens.com\/global\/en\/pressrelease\/siemens-upgrade-taiwans-taoyuan-metro-signaling-x-technology\" rel=\"nofollow noopener\" target=\"_blank\">Siemens Mobility<\/a>, Taoyuan officials as reported by <a href=\"https:\/\/www.cna.com.tw\/news\/aloc\/202608190144.aspx\" rel=\"nofollow noopener\" target=\"_blank\">CNA<\/a> and <a href=\"https:\/\/udn.com\/news\/story\/7324\/9727840\" rel=\"nofollow noopener\" target=\"_blank\">udn<\/a>.<\/p>\n<p>Item<br \/>\nBrown Line<br \/>\nGreen Line extension<\/p>\n<p>Route<br \/>\nTaoyuan City to the Greater Taipei area<br \/>\nStation G01 in Bade to Zhongli<\/p>\n<p>Length<br \/>\n11.38 km<br \/>\nAbout 7.1 km<\/p>\n<p>Stations<br \/>\n7<br \/>\n6 (5 underground, 1 elevated)<\/p>\n<p>Trains in the turnkey package<br \/>\n15<br \/>\n7<\/p>\n<p>Turnkey contractor<br \/>\nST Engineering and Hyundai Rotem<br \/>\nST Engineering and Hyundai Rotem<\/p>\n<p>Signaling supplier<br \/>\nSiemens Mobility (Signaling X, GoA4)<br \/>\nSiemens Mobility (Signaling X, GoA4)<\/p>\n<p>Target for completion and opening<br \/>\n2032 (city target, August 2026)<br \/>\n2031 (mayor\u2019s target, September 2026)<\/p>\n<p>How Signaling X separates software from hardware<\/p>\n<p>Signaling X decouples signaling software from proprietary hardware, so applications run on commercial off-the-shelf (COTS) computers. Siemens says this lets operators modernize and scale their systems independently of hardware lifecycles and simplifies maintenance and spare parts management through widely available IT standards. Its DS3 safety platform provides a redundant environment in which safety-critical applications meet CENELEC Safety Integrity Level 4 (SIL4) requirements, and the system follows secure-by-design and zero-trust principles.<\/p>\n<p>Siemens\u2019 earlier work on the Taoyuan Green Line<\/p>\n<p>The new contracts follow an earlier Siemens role in Taoyuan. In 2018, a consortium of Hyundai Rotem, BES Engineering and Siemens won the turnkey electrical and mechanical contract for the Green Line, with Siemens supplying the <a href=\"https:\/\/assets.new.siemens.com\/siemens\/assets\/api\/uuid:bc1cd021-0edf-45d1-be93-ff971439c112\/PR2018070248MOEN.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Trainguard MT CBTC system for unattended GoA4 operation<\/a>, traction drives and DC traction power. That line is planned at 27.8 km with 21 stations.<\/p>\n<p>Marc Ludwig, Executive Vice President Rail Infrastructure at Siemens Mobility, said:<\/p>\n<p>\u201cTogether with ST Engineering, we are building on our existing experience in Taoyuan to reduce interface complexity and support efficient project delivery, while providing the foundation for safe, reliable and fully automated operations.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"Siemens Mobility will supply Taoyuan Metro signaling for the Brown Line and the Green Line extension to Zhongli,&hellip;\n","protected":false},"author":2,"featured_media":126685,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21002],"tags":[79509,7521,6487,22225],"class_list":["post-126684","post","type-post","status-publish","format-standard","has-post-thumbnail","category-siemens","tag-digital-railway-news","tag-metro","tag-siemens","tag-siemens-mobility"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/126684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=126684"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/126684\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/126685"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=126684"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=126684"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=126684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}