{"id":134774,"date":"2026-11-23T14:14:02","date_gmt":"2026-11-23T14:14:02","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/134774\/"},"modified":"2026-11-23T14:14:02","modified_gmt":"2026-11-23T14:14:02","slug":"10-car-amtrak-airo-trainsets-to-run-with-acs-64-locomotives","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/134774\/","title":{"rendered":"10-car Amtrak Airo trainsets to run with ACS-64 locomotives"},"content":{"rendered":"<p>USA: Eight additional 10-car Amtrak Airo trainsets are expected to enter Northeast Regional service from 2031, each with more than 640 seats, about 34% more than the eight-car version.<\/p>\n<p><a href=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/amtrak-acs-64-locomotive-602.webp\"><img data-rws-image-box=\"921x613\" style=\"width:min(100%,921px);height:auto;aspect-ratio:921\/613;\" fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-194733\" src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/amtrak-acs-64-locomotive-602.webp\" alt=\"Amtrak ACS-64 electric locomotive 602 with Siemens lettering at a station platform\" width=\"921\" height=\"613\"  \/><\/a>Amtrak ACS-64 electric locomotive 602 at a platform. Photo: Siemens<\/p>\n<p><a href=\"https:\/\/media.amtrak.com\/2026\/11\/amtrak-expands-airo-fleet-with-higher-capacity-trains\/\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak announced the fleet expansion<\/a> on November 17, 2026. A day later, <a href=\"https:\/\/www.mobility.siemens.com\/us\/en\/company\/newsroom\/press-releases\/siemens-to-deliver-new-higher-capacity-trainsets-for-amtraks-northeast-corridor.html\" rel=\"nofollow noopener\" target=\"_blank\">Siemens Mobility said it will build 80 new Venture passenger coaches<\/a> for the eight trainsets and modernize 18 Siemens ACS-64 electric locomotives it supplied to Amtrak about ten years ago. Each trainset will run with ten coaches and two ACS-64 locomotives in a push-pull formation.<\/p>\n<p>What the ACS-64 modernization covers<\/p>\n<p>Siemens Mobility will update the locomotives\u2019 communications, diagnostic and operating systems and integrate Electronically Controlled Pneumatic (ECP) braking technology. Working together, two modernized locomotives will deliver about 12.8 megawatts, which the manufacturer says allows a ten-car trainset to run at up to 125 mph. In the push-pull formation, the locomotives do not have to be turned at terminal stations.<\/p>\n<p>The trainsets will also carry onboard digital connectivity and systems for real-time diagnostics, equipment health monitoring and predictive maintenance. Siemens Mobility says these give operators and maintenance teams more visibility into train performance. Neither Amtrak nor Siemens Mobility disclosed the value of the work.<\/p>\n<p>Northeast Regional seats from 2027 to 2031<\/p>\n<p>Amtrak carried 15.2 million customers on Acela and Northeast Regional trains in fiscal year 2025. Eight-car Northeast Regional Airo trains are in testing and are planned to start carrying passengers in late 2027. Amtrak Virginia routes come next, and the 10-car trainsets are planned to follow from 2031.<\/p>\n<p>Amtrak Interim President Byl Herrmann said:<\/p>\n<p>\u201cDemand for train travel isn\u2019t slowing down, and neither are we. For our customers, that means more seats, more availability when travel is busiest, and more chances to find a fare that fits their budget.\u201d<\/p>\n<p>Siemens Mobility builds Airo trainsets at its plants in Sacramento, California, and Lexington, North Carolina. <a href=\"https:\/\/media.amtrak.com\/2026\/11\/airo-supplier-fact-sheet\/\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak\u2019s Airo supplier fact sheet<\/a> counts over 3,500 parts made by close to 100 suppliers in 31 states.<\/p>\n<p>How the 10-car sets differ from earlier Airo trains<\/p>\n<p><a href=\"https:\/\/assets.new.siemens.com\/siemens\/assets\/api\/uuid:f7972216-fd02-46aa-9428-1874f489bdba\/SIE-RS-Amtrak-Airo-Venture-Trainsets-Sheet.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Siemens Mobility\u2019s product sheet for the Airo Venture trainsets<\/a> describes them as powered by Siemens Charger locomotives with a 4,200 hp Cummins QSK95 diesel engine. They can also run fully electric under 25 kV and 12.5 kV catenary, at up to 125 mph in electric mode and 110 mph on diesel. The sheet lists 430 economy and 49 business seats for the eight-car configuration, or 479 in total, which matches Amtrak\u2019s figure of about 34% more seats for a train with more than 640.<\/p>\n<p>Eight-car and 10-car Amtrak Airo trainsets for the Northeast Regional<\/p>\n<p>Item<br \/>\nEight-car Amtrak Airo<br \/>\n10-car Amtrak Airo<\/p>\n<p>Cars<br \/>\n8<br \/>\n10 Venture passenger coaches<\/p>\n<p>Power<br \/>\nSiemens Charger locomotive, diesel or electric under catenary<br \/>\nTwo modernized Siemens ACS-64 electric locomotives, push-pull<\/p>\n<p>Power output<br \/>\n4,250 kW maximum rated power<br \/>\nAbout 12.8 megawatts combined<\/p>\n<p>Seats<br \/>\n479 (430 economy, 49 business)<br \/>\nMore than 640<\/p>\n<p>Top speed<br \/>\n125 mph electric, 110 mph diesel<br \/>\nUp to 125 mph<\/p>\n<p>Passenger service<br \/>\nPlanned from late 2027<br \/>\nPlanned to begin in 2031<\/p>\n<p>The 10-car version adds two cars and changes the power from a Charger locomotive to two ACS-64 units. Eight-car data come from <a href=\"https:\/\/assets.new.siemens.com\/siemens\/assets\/api\/uuid:f7972216-fd02-46aa-9428-1874f489bdba\/SIE-RS-Amtrak-Airo-Venture-Trainsets-Sheet.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Siemens Mobility\u2019s Airo Venture product sheet<\/a>, 10-car data from <a href=\"https:\/\/www.mobility.siemens.com\/us\/en\/company\/newsroom\/press-releases\/siemens-to-deliver-new-higher-capacity-trainsets-for-amtraks-northeast-corridor.html\" rel=\"nofollow noopener\" target=\"_blank\">Siemens Mobility\u2019s November 18, 2026 release<\/a> and service dates from <a href=\"https:\/\/media.amtrak.com\/2026\/11\/amtrak-expands-airo-fleet-with-higher-capacity-trains\/\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak\u2019s November 17, 2026 release<\/a>. The 479-seat total is an editorial sum of the sheet\u2019s economy and business seats. The eight-car output is the Charger trainset\u2019s rated maximum, while the 10-car figure combines two locomotives, so the two values are not a like-for-like comparison.<\/p>\n<p>The ACS-64 is an electric, double-cab locomotive designed for push-pull operation without turning. <a href=\"https:\/\/assets.new.siemens.com\/siemens\/assets\/api\/uuid:180cffaf-f83a-4a36-a575-a033f8ab989f\/ACS-64-Amtrak-Cities-Sprinter_original.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Siemens Mobility\u2019s ACS-64 product sheet<\/a> gives a maximum rating of 6,400 kW per locomotive, so two units add up to the 12.8 megawatts cited for the new trainsets. The same sheet already lists an electronically controlled pneumatic brake system among the locomotive\u2019s equipment.<\/p>\n<p>18 of the 70 ACS-64 locomotives ordered in 2010<\/p>\n<p>Amtrak ordered 70 ACS-64 locomotives from Siemens in October 2010 for the Northeast Corridor between Boston and Washington, D.C., and the Keystone Corridor between Philadelphia and Pittsburgh. The 18 locomotives now set for modernization equal about a quarter of that order. Eight trainsets with two locomotives each account for 16 of them, and Siemens Mobility has not said how the other two will be used.<\/p>\n<p>The eight trainsets extend a program that began with <a href=\"https:\/\/media.amtrak.com\/2021\/07\/amtrak-to-transform-rail-travel-with-7-3-billion-investment-in-state-of-the-art-equipment\/\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak\u2019s July 2021 contract with Siemens Mobility<\/a> for a fleet of up to 83 trains, with options for up to 130 more. The $7.3 billion investment also covered a long-term parts and service agreement and facility upgrades. In August 2023, <a href=\"https:\/\/media.amtrak.com\/2023\/08\/more-amtrak-airo-trainsets-ordered-to-meet-surging-demand\/\" rel=\"nofollow noopener\" target=\"_blank\">Amtrak exercised an option for 10 more Airo trainsets<\/a>, bringing the total order to 83. The November 2026 announcements do not say whether the eight 10-car trainsets come under those options.<\/p>\n","protected":false},"excerpt":{"rendered":"USA: Eight additional 10-car Amtrak Airo trainsets are expected to enter Northeast Regional service from 2031, each with&hellip;\n","protected":false},"author":2,"featured_media":134775,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21002],"tags":[82584,82585,24460,6487,22225],"class_list":["post-134774","post","type-post","status-publish","format-standard","has-post-thumbnail","category-siemens","tag-amtrak-airo","tag-northeast-corridor","tag-procurement-of-railway-rolling-stock","tag-siemens","tag-siemens-mobility"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/134774","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=134774"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/134774\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/134775"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=134774"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=134774"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=134774"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}