{"id":138525,"date":"2026-11-29T04:39:32","date_gmt":"2026-11-29T04:39:32","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/138525\/"},"modified":"2026-11-29T04:39:32","modified_gmt":"2026-11-29T04:39:32","slug":"siemens-gamesa-reserves-capacity-for-turbines-over-15-mw-for-green-volt-set-to-be-the-worlds-largest-floating-wind-farm","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/138525\/","title":{"rendered":"Siemens Gamesa reserves capacity for turbines over 15 MW for Green Volt, set to be the world&#8217;s largest floating wind farm"},"content":{"rendered":"<p>                    Green Volt, developed by Flotation Energy and V\u00e5rgr\u00f8nn, signed a deal with Siemens Gamesa on November 24, 2026, to reserve manufacturing capacity for 28 turbines rated above 15 MW. The project is about 80 km from Peterhead, Scotland, and has consent for up to 560 MW<\/p>\n<p class=\"wp-block-paragraph\">The Green Volt floating wind farm has reserved manufacturing capacity from Siemens Gamesa for 28 turbines, each rated above 15 MW.<\/p>\n<p class=\"wp-block-paragraph\">The announcement was made Tuesday, November 24, 2026, in Aberdeen, Scotland.<\/p>\n<p class=\"wp-block-paragraph\">The deal is outlined in the <a href=\"https:\/\/greenvoltoffshorewind.com\/world-first-turbine-deal-and-aberdeen-port-investment-for-green-volt-floating-windfarm\/\" target=\"_blank\" rel=\"noopener nofollow\">Green Volt announcement<\/a>, published the same day. <a href=\"https:\/\/www.oedigital.com\/news\/544556-scottish-floating-wind-farm-to-feature-siemens-gamesa-turbines\" target=\"_blank\" rel=\"noopener nofollow\">Offshore Engineer<\/a> also reported the reservation <a class=\"cpg-int\" href=\"https:\/\/clickpetroleoegas.com.br\/petrobras-avalia-ajuste-pontual-na-politica-de-precos-dos-combustiveis-com-o-barril-abaixo-de-us-90-e-a-diretora-angelica-laureano-diz-que-a-queda-do-petroleo-pode-ser-btl96-mhbb01\/\" rel=\"nofollow noopener\" target=\"_blank\">on Tuesday, November 24<\/a>.<\/p>\n<p class=\"wp-block-paragraph\">The project is about 50 miles, or 80 km, from Peterhead and has consent for up to 560 MW.<\/p>\n<p class=\"wp-block-paragraph\">Construction is expected to create more than 2,800 direct jobs and about 100 permanent operations positions.<\/p>\n<p class=\"wp-block-paragraph\">In Brazil, offshore wind <a class=\"cpg-int\" href=\"https:\/\/clickpetroleoegas.com.br\/petrobras-afirma-na-apresentacao-do-seu-plano-de-negocios-de-us-122-bilhoes-ate-2031-que-nao-tem-previsao-de-novo-concurso-publico-depois-de-contratar-6-mil-empregados-desde-btl96-mhbb01\/\" rel=\"nofollow noopener\" target=\"_blank\">is still<\/a> awaiting regulations. The first auction of offshore areas depends on a decree that Brazil\u2019s Ministry of Mines and Energy plans to publish by the end of 2026.<\/p>\n<p>What Siemens Gamesa reserved for Green Volt<\/p>\n<p class=\"wp-block-paragraph\">The deal with Siemens Gamesa is worth several million pounds, though no exact figure has been disclosed. It secures manufacturing capacity and specialized engineering teams for the 28 turbines.<\/p>\n<p class=\"wp-block-paragraph\">The developers say this is the first time anywhere in the world that a commercial-scale floating wind farm has reserved turbines of this size.<\/p>\n<p class=\"wp-block-paragraph\">The move is still a reservation.<\/p>\n<p class=\"wp-block-paragraph\">Darren Davidson, Siemens Energy\u2019s director for the UK and Ireland, said important steps remain, but reserving capacity for 28 15-MW turbines is a concrete advance.<\/p>\n<p class=\"wp-block-paragraph\">Davidson also noted that floating wind brings new opportunities and challenges, requiring close collaboration with suppliers.<\/p>\n<p class=\"wp-block-paragraph\">He said Siemens would continue working with Green Volt through the remaining phases of the project.<\/p>\n<p>Where the wind farm is located and how much power it could generate<\/p>\n<p class=\"wp-block-paragraph\">Green Volt is in the North Sea, about 80 km from Peterhead, according to <a href=\"https:\/\/oceannews.com\/news\/energy\/green-volt-secures-turbine-deal-and-port-agreement-for-worlds-largest-floating-wind-farm\" target=\"_blank\" rel=\"noopener nofollow\">Ocean News<\/a>. The Scottish government has granted consent for up to 560 MW of capacity.<\/p>\n<p class=\"wp-block-paragraph\">The Siemens Gamesa turbines will float on structures anchored to the seabed. Water at the site is 90 to 100 meters deep, according to the <a href=\"https:\/\/greenvoltoffshorewind.com\/project-overview\/\" target=\"_blank\" rel=\"noopener nofollow\">project website<\/a>.<\/p>\n<p class=\"wp-block-paragraph\">The announcement says Green Volt is set to become the world\u2019s largest commercial floating wind farm.<\/p>\n<p class=\"wp-block-paragraph\">The power will go to the UK grid and help decarbonize offshore oil and gas platforms.<\/p>\n<p class=\"wp-block-paragraph\">Flotation Energy presented the project in an English-language video published on YouTube on February 26, 2026. In it, the company\u2019s chairman, Barry McLeod, discusses Green Volt.<\/p>\n<p class=\"wp-block-paragraph\">McLeod says the partnership with V\u00e5rgr\u00f8nn works because of shared values and an entrepreneurial spirit. In his view, delivering projects that are first of their kind worldwide depends on people, and the team was hand-picked.<\/p>\n<p><img loading=\"lazy\" data-takopic=\"\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Barry Macleod of Flotation Energy, Isla Robb of ETZ and Bob Sanguinetti of the Port of Aberdeen wearing hard hats on the dock, with ships and a rig in the background.\" class=\"wp-image-410315\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/siemens-gamesa-green-volt-maior-eolico-flutuante-28-turbinas-mh25-2-ec1f270f.jpg\"\/><img loading=\"lazy\" data-takopic=\"\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/siemens-gamesa-green-volt-maior-eolico-flutuante-28-turbinas-mh25-2-ec1f270f.jpg\" alt=\"Barry Macleod of Flotation Energy, Isla Robb of ETZ and Bob Sanguinetti of the Port of Aberdeen wearing hard hats on the dock, with ships and a rig in the background.\" class=\"wp-image-410315\"  \/>Barry Macleod, Isla Robb and Bob Sanguinetti at South Harbour in Aberdeen, at the announcement of the agreement between Green Volt and the port. Photo: Green Volt.<\/p>\n<p>Brazil\u2019s offshore wind sector still awaits regulations and its first auction<\/p>\n<p class=\"wp-block-paragraph\">Brazil has Law No. 15,097\/2025, approved in January 2025, which governs offshore power generation. Regulations have yet to be issued.<\/p>\n<p class=\"wp-block-paragraph\">On October 27, 2026, <a href=\"https:\/\/cenarioenergia.com.br\/2026\/10\/27\/mme-enviara-decreto-eolica-offshore-casa-civil-regulamentacao\/\" target=\"_blank\" rel=\"noopener nofollow\">Cen\u00e1rio Energia<\/a> reported that the Ministry of Mines and Energy plans to send a draft decree to the Office of the Chief of Staff, Brazil\u2019s presidential office.<\/p>\n<p class=\"wp-block-paragraph\">The goal is to publish the regulation by the end of 2026.<\/p>\n<p class=\"wp-block-paragraph\">The decree is expected to address the allocation of offshore areas, Preliminary Interference Declarations and the stages for offering those areas.<\/p>\n<p class=\"wp-block-paragraph\">Mariana Esp\u00e9cie, a secretary at the ministry, announced the plan at the Brazil WindPower event.<\/p>\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/tribunadonorte.com.br\/economia\/com-14-projetos-no-rn-setor-de-eolica-offshore-ainda-aguarda-regulamentacao\/\" target=\"_blank\" rel=\"noopener nofollow\">Tribuna do Norte<\/a> reported in December 2025 that 104 offshore wind projects had applied for permits from Ibama, Brazil\u2019s environmental agency, by March 2025. Fourteen are in Rio Grande do Norte.<\/p>\n<p class=\"wp-block-paragraph\">In the same report, the ministry said there was still no forecast for an auction of offshore areas.<\/p>\n<p class=\"wp-block-paragraph\">The only project to advance in Rio Grande do Norte is a test site run by Senai, Brazil\u2019s National Service for Industrial Training, with a preliminary license for up to two experimental turbines.<\/p>\n<p>Agreement with Port of Aberdeen includes \u00a315 million<\/p>\n<p class=\"wp-block-paragraph\">Green Volt also signed a letter of intent with the Port of Aberdeen. It calls for using South Harbour to prepare anchors and mooring lines for Siemens Gamesa\u2019s turbines.<\/p>\n<p class=\"wp-block-paragraph\">The agreement is expected to support a \u00a315 million package of investment and spending on the port\u2019s infrastructure, facilities and suppliers. Offshore Engineer converted the amount to US$19.6 million.<\/p>\n<p class=\"wp-block-paragraph\">The package and economic benefits are subject to final confirmation, the statement said.<\/p>\n<p class=\"wp-block-paragraph\">Bob Sanguinetti, chief executive of the Port of Aberdeen, said the \u00a3420 million investment in South Harbour puts the port at the center of Scotland\u2019s offshore wind industry.<\/p>\n<p class=\"wp-block-paragraph\">He said Flotation Energy wants to use the port to assemble and ship the Green Volt structures, citing its deepwater berths and large laydown area.<\/p>\n<p class=\"wp-block-paragraph\">Sanguinetti expects the work to create business opportunities for suppliers in northeast Scotland. He also called for faster progress on the other projects from the ScotWind and INTOG rounds.<\/p>\n<p>Jobs, investment and emissions cuts<\/p>\n<p class=\"wp-block-paragraph\">Green Volt is expected to generate more than 2,800 direct construction jobs and about 100 permanent operating positions. The planned investment is about \u00a32.5 billion.<\/p>\n<p class=\"wp-block-paragraph\">The project website cites more than \u00a31.3 billion in benefits to the UK economy. Once operational, the farm is expected to avoid about 1 million metric tons of CO\u2082 emissions a year.<\/p>\n<p class=\"wp-block-paragraph\">The schedule calls for construction from 2025 to 2028, with first power expected in 2029.<\/p>\n<p><img loading=\"lazy\" data-takopic=\"\" decoding=\"async\" width=\"1792\" height=\"1008\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Two wind turbines on yellow floating foundations in open water beneath a blue sky.\" class=\"wp-image-410316\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/siemens-gamesa-green-volt-maior-eolico-flutuante-28-turbinas-mh25-3-3a971a06.jpg\"\/><img loading=\"lazy\" data-takopic=\"\" decoding=\"async\" width=\"1792\" height=\"1008\" src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/11\/siemens-gamesa-green-volt-maior-eolico-flutuante-28-turbinas-mh25-3-3a971a06.jpg\" alt=\"Two wind turbines on yellow floating foundations in open water beneath a blue sky.\" class=\"wp-image-410316\"  \/>Floating wind turbines in an image used by Green Volt to illustrate its target of delivering first power in 2029. Photo: Green Volt.<br \/>\nWho is developing the project and what has been approved<\/p>\n<p class=\"wp-block-paragraph\">Green Volt is being developed by Aberdeen-based Flotation Energy and Norway\u2019s V\u00e5rgr\u00f8nn. In 2024, it received its main onshore and offshore permits.<\/p>\n<p class=\"wp-block-paragraph\">That same year, it won a 400-MW Contract for Difference from the UK government. The contract guarantees a price for the farm\u2019s electricity.<\/p>\n<p class=\"wp-block-paragraph\">Energy Voice journalist Allister Thomas commented on the result in English on X on September 3, 2024, when the AR6 auction results were announced.<\/p>\n<p class=\"wp-block-paragraph\">He wrote that Green Volt, set to become the world\u2019s largest floating wind farm near Aberdeen, was among the winners. He also said only 5 GW of wind power was awarded in the round.<\/p>\n<p lang=\"en\" dir=\"ltr\">CfD results from the AR6 round are out. <\/p>\n<p>Green Volt, to become the world&#8217;s largest floating wind farm off <a href=\"https:\/\/x.com\/hashtag\/Aberdeen?src=hash&amp;ref_src=twsrc%5Etfw\" rel=\"nofollow\">#Aberdeen<\/a>, is among the winners. <\/p>\n<p>However, only 5GW of wind power awarded this round, so hitting 2030 Gov target of 50+ GW looks v challenging<br \/><a href=\"https:\/\/x.com\/hashtag\/OffshoreWind?src=hash&amp;ref_src=twsrc%5Etfw\" rel=\"nofollow\">#OffshoreWind<\/a> <a href=\"https:\/\/t.co\/apfTwA3rvb\" rel=\"nofollow\">pic.twitter.com\/apfTwA3rvb<\/a><\/p>\n<p>\u2014 Allister Thomas (@AllisterMThomas) <a href=\"https:\/\/x.com\/AllisterMThomas\/status\/1830861372395048979?ref_src=twsrc%5Etfw\" rel=\"nofollow\">September 3, 2024<\/a><\/p>\n<p class=\"wp-block-paragraph\">The project faced turbulence in 2026. Energy Voice TV published an English-language program about the North Sea on YouTube on October 15, 2026.<\/p>\n<p class=\"wp-block-paragraph\">The video\u2019s description says Flotation Energy confirmed staff cuts. This came amid rumors that V\u00e5rgr\u00f8nn was planning to leave Green Volt.<\/p>\n<p>Kincardine, Flotation Energy\u2019s earlier experience<\/p>\n<p class=\"wp-block-paragraph\">Flotation Energy\u2019s founders played a central role in the Kincardine floating wind farm. It is located 15 km off the coast of Aberdeen.<\/p>\n<p class=\"wp-block-paragraph\">The company calls Kincardine the world\u2019s largest grid-connected floating wind project. The video below, in English, was published by Flotation Energy on YouTube on May 14, 2025.<\/p>\n<p class=\"wp-block-paragraph\">The footage shows the floating structures being towed to the wind farm site off the coast of Scotland.<\/p>\n<p>What companies and governments said<\/p>\n<p class=\"wp-block-paragraph\">Matt Green, Green Volt project director, called the two agreements milestones for floating wind. \u201cReserving turbines of this size is unprecedented anywhere in the world,\u201d he said.<\/p>\n<p class=\"wp-block-paragraph\">He said the agreements bring the project closer to construction and should attract new contracts. Green said the company will explore manufacturing opportunities in the UK with Siemens Gamesa.<\/p>\n<p class=\"wp-block-paragraph\">UK Energy Minister Michael Shanks said the announcement was a vote of confidence in Scotland\u2019s industrial future.<\/p>\n<p class=\"wp-block-paragraph\">Stephen Gethins, Scotland\u2019s energy minister, said the country is recognized as a global leader in floating wind. Isla Robb of ETZ Ltd called the announcement a milestone for Scottish industry.<\/p>\n<p class=\"wp-block-paragraph\">Robb said Aberdeen and northeast Scotland are well positioned to lead the sector, thanks to their energy expertise, suppliers and investment in the port.<\/p>\n<p>What still needs to happen before construction can begin<\/p>\n<p class=\"wp-block-paragraph\">Green Volt still needs to secure other major contracts and attract more investment, according to Offshore Engineer.<\/p>\n<p class=\"wp-block-paragraph\">The reservation with Siemens Gamesa and the letter with the port prepare the project for this stage, but they are not yet firm supply contracts.<\/p>\n<p>                <script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"Green Volt, developed by Flotation Energy and V\u00e5rgr\u00f8nn, signed a deal with Siemens Gamesa on November 24, 2026,&hellip;\n","protected":false},"author":2,"featured_media":138526,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21002],"tags":[6487],"class_list":["post-138525","post","type-post","status-publish","format-standard","has-post-thumbnail","category-siemens","tag-siemens"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/138525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=138525"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/138525\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/138526"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=138525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=138525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=138525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}