{"id":30861,"date":"2026-06-05T06:05:06","date_gmt":"2026-06-05T06:05:06","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/30861\/"},"modified":"2026-06-05T06:05:06","modified_gmt":"2026-06-05T06:05:06","slug":"key-update-on-ratcliffe-on-soar-power-station-demolition-as-timeline-released","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/30861\/","title":{"rendered":"Key update on Ratcliffe-on-Soar Power Station demolition as timeline released"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">The demolition of a Nottinghamshire power station could take up to four years as a timeline for the works has been released.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Ratcliffe-on-Soar Power Station was closed at the end of September 2024, with German company Uniper handling its decommissioning since then.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Erith Group has now been chosen to carry out the demolition works at the Ratcliffe site over the next four years.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">This will include safely removing structures such as the cooling towers and all associated waste products from the site, leaving it flat and level.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The demolition work is due to start later this year, with an exact programme yet to be set.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">It is anticipated that in around mid-2028 at the earliest, the main power station and turbine hall buildings will be demolished, followed by the chimney stack.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The cooling towers will likely not be demolished before 2029.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Mike Lockett, Uniper UK country chair, said: &#8220;We know people are keen to see the redevelopment of the Ratcliffe site, and [bringing Erith on board] is a significant step in that direction.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The demolition of the power station will release large parts of the site for redevelopment.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The site was granted outline permission by Rushcliffe Borough Council in July 2023 for sustainable development.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">This includes low-carbon energy production, a data centre, battery production and energy storage.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">A significant section of the site is part of the East Midlands Freeport, the UK&#8217;s only in-land freeport, while a data centre on the south side of the site has also been granted permission.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Andy Dyson, operations director at Erith Group, said: &#8220;Ratcliffe-on-Soar power station is a significant site, both in terms of its scale and its role in the UK\u2019s energy history.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;The transition following the end of coal-fired generation marks an important stage in how legacy infrastructure is managed and sites are repurposed.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Mr Dyson added that the demolition of the power station will be delivered in a controlled manner, focusing on environmental compliance.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">He said: &#8220;Our approach combines proven large-scale power station demolition experience with detailed sequencing, active risk management and effective coordination.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;Working collaboratively with Uniper and the wider project team is central to this, ensuring the works are delivered safely, predictably and in line with surrounding operations and stakeholder requirements.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"The demolition of a Nottinghamshire power station could take up to four years as a timeline for the&hellip;\n","protected":false},"author":2,"featured_media":30862,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21075],"tags":[29805,29803,29804,4991],"class_list":["post-30861","post","type-post","status-publish","format-standard","has-post-thumbnail","category-uniper","tag-demolition","tag-power-station","tag-ratcliffe-on-soar-power-station","tag-uniper"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/30861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=30861"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/30861\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/30862"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=30861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=30861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=30861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}