{"id":38162,"date":"2026-06-17T11:54:14","date_gmt":"2026-06-17T11:54:14","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/38162\/"},"modified":"2026-06-17T11:54:14","modified_gmt":"2026-06-17T11:54:14","slug":"siemens-energy-and-nsore-snag-north-sea-offshore-wind-contract","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/38162\/","title":{"rendered":"Siemens Energy and NSORe snag North Sea offshore wind contract"},"content":{"rendered":"<p>    <img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/www.europesays.com\/germany\/wp-content\/uploads\/2026\/06\/44eebaa4eb54d1f233b4c17829a76db8.jpeg\" alt=\"FILE PHOTO: A view of an offshore wind farm in the North Sea. (is associated with: \u00abSiemens Energy and NSORe snag North Sea offshore wind contract\u00bb) Sina Schuldt\/dpa\" loading=\"eager\" height=\"640\" width=\"960\" class=\"yf-lglytj  loaded\"\/> FILE PHOTO: A view of an offshore wind farm in the North Sea. (is associated with: \u00abSiemens Energy and NSORe snag North Sea offshore wind contract\u00bb) Sina Schuldt\/dpa      <\/p>\n<p class=\"yf-1fy9kyt\">The German transmission system operator 50Hertz has awarded a contract for up to 2 gigawatts of wind energy to Siemens Energy and Neptun Smulders Offshore Renewables (NSORe), Munich-based Siemens Energy reported on Wednesday.<\/p>\n<p class=\"yf-1fy9kyt\">No price information was disclosed. Siemens Energy said it expects to book the order in its fiscal year beginning October 1, 2026.<\/p>\n<p class=\"yf-1fy9kyt\">The North Sea Connector 2 grid connection system will enable up to 2 gigawatts of electricity generated by offshore wind farms in the North Sea to be transmitted to Germany&#8217;s onshore power grid.<\/p>\n<p class=\"yf-1fy9kyt\">The project marks the first time Siemens Energy will build a 2-GW offshore converter platform in partnership with a German shipyard, the company said in a statement. The platform will be fabricated primarily at the Neptun Werft shipyard in Rostock-Warnem\u00fcnde by NSORe, a joint venture between Neptun Werft, part of the Meyer Werft Group, and Belgian construction company Smulders.<\/p>\n<p class=\"yf-1fy9kyt\">Siemens Energy will supply the electrical transmission technology for the platform, including transformers, converters and SF6-free gas-insulated switchgear. SF6-free gear is an environmentally friendly alternative to sulfur -hexafluoride, which emits greenhouse gases., the company said.<\/p>\n<p class=\"yf-1fy9kyt\">Siemens Energy notes that SF6 is a gas that is &#8220;24,300 times more climate-hostile than CO2 and one which stays in the atmosphere for up to 1,000 years.&#8221;<\/p>\n<p class=\"yf-1fy9kyt\">The company has also secured a long-term service agreement covering maintenance, IT services and on-call support.<\/p>\n<p class=\"yf-1fy9kyt\">The company said most of its work on the project, including key electrical equipment, will be carried out in Germany, with transformers and converters produced in Nuremberg and switchgear supplied from Berlin. Siemens Energy added that it is investing several hundred million euros to expand capacity at these sites to meet growing demand for energy-transition technologies.<\/p>\n<p>    <img decoding=\"async\" src=\"data:image\/gif;base64,R0lGODlhAQABAIAAAAAAAP\/\/\/ywAAAAAAQABAAACAUwAOw==\" alt=\"FILE PHOTO: Company logo seen on a building at the Siemens Energy turbine factory in Goerlitz. (is associated with: \u00abSiemens Energy and NSORe snag North Sea offshore wind contract\u00bb) J\u00fcrgen L\u00f6sel\/dpa\" loading=\"lazy\" height=\"640\" width=\"960\" class=\"yf-lglytj loader\"\/> FILE PHOTO: Company logo seen on a building at the Siemens Energy turbine factory in Goerlitz. (is associated with: \u00abSiemens Energy and NSORe snag North Sea offshore wind contract\u00bb) J\u00fcrgen L\u00f6sel\/dpa      <\/p>\n","protected":false},"excerpt":{"rendered":"FILE PHOTO: A view of an offshore wind farm in the North Sea. (is associated with: \u00abSiemens Energy&hellip;\n","protected":false},"author":2,"featured_media":38163,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21002],"tags":[34006,21991,6487,3844,24405,32074],"class_list":["post-38162","post","type-post","status-publish","format-standard","has-post-thumbnail","category-siemens","tag-neptun-werft","tag-offshore-wind-farm","tag-siemens","tag-siemens-energy","tag-the-north-sea","tag-wind-energy"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/38162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=38162"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/38162\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/38163"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=38162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=38162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=38162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}