{"id":44666,"date":"2026-06-28T02:17:26","date_gmt":"2026-06-28T02:17:26","guid":{"rendered":"https:\/\/www.europesays.com\/germany\/44666\/"},"modified":"2026-06-28T02:17:26","modified_gmt":"2026-06-28T02:17:26","slug":"enbw-begins-construction-of-400mw-bess-in-germany","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/germany\/44666\/","title":{"rendered":"EnBW begins construction of 400MW BESS in Germany"},"content":{"rendered":"\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">EnBW Energie Baden-W\u00fcrttemberg (EnBW) has commenced construction of a battery energy storage system (BESS) with a planned power capacity of 400MW and an energy capacity of 800MW-hours (MWh) at Philippsburg Energy Park in Germany.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">The facility is said to be one of the country&#8217;s largest battery storage projects.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">It is designed to store electricity from wind and solar sources, supplying energy for approximately 100,000 households daily.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">The BESS is being developed at a site that previously housed two nuclear power units, which are currently undergoing dismantlement.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">In addition to the storage project, transmission system operator TransnetBW has installed a direct-current converter nearby as part of the ULTRANET DC link, intended to transmit wind-generated electricity from northern to south-western Germany.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">EnBW&#8217;s battery storage initiative is being financed without subsidies.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">Funding will come from revenue generated by electricity sales and grid services, which help ensure reliable grid operations and a steady electricity supply.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">Initial construction will involve a pilot plant to evaluate two distinct BESS.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">Additional systems are expected to be introduced next year, with plans for the overall facility to become operational by the end of 2027.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">EnBW sustainable generation infrastructure chief operations officer Peter Heydecker said: &#8220;Renewable energy needs flexible support systems. Battery storage facilities, together with hydrogen-ready gas-fired power plants, ensure a reliable and affordable electricity supply.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">&#8220;Both of these technologies deliver an important contribution to security of supply by balancing out fluctuations in wind and solar energy.&#8221;  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">EnBW currently operates 20 BESS with a combined installed capacity exceeding 100MWh across Germany.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">The company is also developing additional storage facilities totalling 1,800MWh of capacity.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">All upcoming solar farms installed by EnBW are set to include co-located BESS.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">In February this year, EnBW <a href=\"https:\/\/www.power-technology.com\/news\/enbw-google-sign-ppa-100mw-germany\/\" data-ylk=\"slk:signed%20a%2015-year%20power%20purchase%20agreement;elm:context_link;itc:0;sec:content-canvas\" data-yga=\"{&quot;yLinkText&quot;:&quot;signed a 15-year power purchase agreement&quot;,&quot;yLinkElement&quot;:&quot;context_link&quot;,&quot;yModuleName&quot;:&quot;content-canvas&quot;}\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">signed a 15-year power purchase agreement<\/a> with Google to supply 100MW of clean electricity from the He Dreiht offshore wind farm in the German North Sea.  <\/p>\n<p class=\"text text-block paragraph text-left neo-font-paragraph-xl-reg  yf-18d6y07\" style=\"text-decoration: none; font-style: normal; text-transform: none; text-align: inherit; font-variant-numeric: normal;\">&#8220;EnBW begins construction of 400MW BESS in Germany&#8221; was originally created and published by <a href=\"https:\/\/www.power-technology.com\/news\/enbw-construction-400mw-bess-germany\/\" data-ylk=\"slk:Power%20Technology;elm:context_link;itc:0;sec:content-canvas\" data-yga=\"{&quot;yLinkText&quot;:&quot;Power Technology&quot;,&quot;yLinkElement&quot;:&quot;context_link&quot;,&quot;yModuleName&quot;:&quot;content-canvas&quot;}\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">Power Technology<\/a>, a GlobalData owned brand.  <\/p>\n","protected":false},"excerpt":{"rendered":"EnBW Energie Baden-W\u00fcrttemberg (EnBW) has commenced construction of a battery energy storage system (BESS) with a planned power&hellip;\n","protected":false},"author":2,"featured_media":44667,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21242],"tags":[4989,5401,15526,19828,21270,38129,38130,38131],"class_list":["post-44666","post","type-post","status-publish","format-standard","has-post-thumbnail","category-enbw","tag-battery-energy-storage-system","tag-bess","tag-electricity-supply","tag-enbw","tag-enbw-energie-baden-wurttemberg","tag-energy-capacity","tag-installed-capacity","tag-planned-power-capacity"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/44666","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/comments?post=44666"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/posts\/44666\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media\/44667"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/media?parent=44666"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/categories?post=44666"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/germany\/wp-json\/wp\/v2\/tags?post=44666"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}