{"id":549408,"date":"2026-06-23T04:19:31","date_gmt":"2026-06-23T04:19:31","guid":{"rendered":"https:\/\/www.europesays.com\/ie\/549408\/"},"modified":"2026-06-23T04:19:31","modified_gmt":"2026-06-23T04:19:31","slug":"luas-finglas-line-could-begin-construction-in-2028-minister-says-the-irish-times","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ie\/549408\/","title":{"rendered":"Luas Finglas line could begin construction in 2028, Minister says \u2013 The Irish Times"},"content":{"rendered":"<p class=\"c-paragraph paywall \">The Government is to accelerate the extension of the <a href=\"https:\/\/www.irishtimes.com\/tags\/luas\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/luas\">Luas<\/a> network to Finglas with construction now earmarked for 2028 rather than in the 2030s, Minister for Transport <a href=\"https:\/\/www.irishtimes.com\/tags\/darragh-o-brien\/\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/darragh-o-brien\/\">Darragh O\u2019Brien<\/a> has said.<\/p>\n<p class=\"c-paragraph paywall \">The Minister said the aim now was that the main design and build contract for the 3.9km off-road project, which will link up with the existing Luas line and mainline <a href=\"https:\/\/www.irishtimes.com\/tags\/public-transport\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/public-transport\">rail services<\/a> at Broombridge, will go to tender early next year.<\/p>\n<p class=\"c-paragraph paywall \">O\u2019Brien said there was a railway order \u2013 essentially planning permission \u2013 for the Luas extension to Finglas in place since October 2025 and that three judicial review challenges to the project had now been resolved.<\/p>\n<p class=\"c-paragraph paywall \">\u201c<a href=\"https:\/\/www.irishtimes.com\/tags\/transport-infrastructure-ireland\/\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/transport-infrastructure-ireland\/\">Transport Infrastructure Ireland<\/a> [TII] is seeking to position the project to a ready-to-start stage, with the aim that the main design and build contract being tendered at the start of next year. I want to bring this forward at that point in order that we can look to accelerating it with a view to getting into construction in 2028,\u201d the Minister said in reply to a parliamentary question from TD Paul McAuliffe of <a href=\"https:\/\/www.irishtimes.com\/tags\/fianna-fail\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/fianna-fail\">Fianna F\u00e1il<\/a>.<\/p>\n<p class=\"c-paragraph paywall \">He said under the previous <a href=\"https:\/\/www.irishtimes.com\/tags\/national-development-plan\/\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/national-development-plan\/\">National Development Plan<\/a> the Luas to Finglas project \u201cwas sitting in the middle of the 2030s\u201d.<\/p>\n<p class=\"c-paragraph paywall \">O\u2019Brien said the new Finglas Luas line would serve an area with 58,000 households. <\/p>\n<p class=\"c-paragraph paywall \">The Government is also likely to allocate a spending package for the extension, with a potential drawdown from the climate and nature fund \u2013 similar to a move done last year to pay some of the bill for <a href=\"https:\/\/www.irishtimes.com\/tags\/metrolink\" target=\"_blank\" rel=\"noreferrer nofollow noopener\" title=\"https:\/\/www.irishtimes.com\/tags\/metrolink\">MetroLink<\/a> \u2013 possible. However, one source familiar with the plans said this was not highly likely.<\/p>\n<p class=\"c-paragraph paywall \">Meanwhile the Cabinet is expected to consider plans to authorise the next phase of the Dublin MetroLink project in mid-July. O\u2019Brien is expected to bring new costings for the metro plan to Government along with proposals to tender key elements of the projects.<\/p>\n<p class=\"c-paragraph paywall \">There is speculation in the transport world that the bill for MetroLink \u2013 the largest public project in the history of the State \u2013 could be in the range of \u20ac15 billion to \u20ac18 billion. <\/p>\n<p class=\"c-paragraph paywall \">It is understood there are some concerns within Government that comprehensive governance and oversight arrangements will have to be tightly locked down to ensure costs do not increase further.<\/p>\n<p class=\"c-paragraph paywall \">Meanwhile there is no agreement yet in place regarding the remuneration package to be put in place for the new project director of MetroLink to succeed New Zealander Sean Sweeney who resigned suddenly in April after about 20 months in the role. <\/p>\n<p class=\"c-paragraph paywall \">Sweeney had been paid an overall package which included a \u20ac550,000 salary, private health insurance for him and his family, and up to \u20ac30,000 in moving and relocation expenses.<\/p>\n<p class=\"c-paragraph paywall \">In a statement the Department of Public Expenditure said it was \u201ccurrently engaging with the Department of Transport on the terms and conditions for the recruitment of a new programme director for MetroLink\u201d.<\/p>\n<p class=\"c-paragraph paywall \">\u201cThe engagement centres on the remuneration package for the new programme director. It would be inappropriate to divulge any details prior to Minister for Public Expenditure\u2019s decision on the terms and conditions proposed by the Department of Transport.\u201d <\/p>\n<p class=\"c-paragraph paywall \">Some sources in the transport world have maintained that to secure a candidate with top level experience of developing metro projects, a package of more than that awarded to Sweeney will be needed. Government sources insisted that they are happy with progress being made on replacing Sweeney. <\/p>\n","protected":false},"excerpt":{"rendered":"The Government is to accelerate the extension of the Luas network to Finglas with construction now earmarked for&hellip;\n","protected":false},"author":2,"featured_media":549409,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[73],"tags":[79,2914,42426,52,18,4771,19,17,11550,4852,10915,13421,53919],"class_list":["post-549408","post","type-post","status-publish","format-standard","has-post-thumbnail","category-business","tag-business","tag-darragh-o-brien","tag-department-of-public-expenditure-and-reform","tag-dublin","tag-eire","tag-fianna-fail","tag-ie","tag-ireland","tag-luas","tag-metrolink","tag-national-development-plan","tag-public-transport","tag-transport-infrastructure-ireland"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ie\/116797503492267212","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/posts\/549408","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/comments?post=549408"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/posts\/549408\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/media\/549409"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/media?parent=549408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/categories?post=549408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ie\/wp-json\/wp\/v2\/tags?post=549408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}