
LEBANON, N.H. (ABC22/FOX44) – Monday marked the first day of a closure of a bridge on New Hampshire Route 12A which is expected to last for a full year.
The “dry bridge” on Main Street over the New England Central Railroad is no longer structurally sound and needs to be replaced.
The closure has been approved to last 365 days. Last year, the Lebanon City Council chose the full closure over an alternative which would have only partially closed the bridge – at the cost of more than two years of construction work.
Lebanon votes to close bridge during upcoming replacement
City officials had hoped that the railroad would be willing to allow occasional pauses in traffic – but NECR wasn’t willing to compromise. Then-interim Lebanon city manager Jack Wozmak had estimated that one train crosses under the bridge each day.
For pedestrians, a footbridge is reportedly available; bicyclists can walk across that temporary bridge, and it is ADA accessible.

(Courtesy: City of Lebanon)
For drivers, the designated detour goes via Interstate 89 from Exit 20 to Exit 19, and via Mechanic Street and Seminary Hill Road. The detour route is about three miles longer.
A possible shorter detour, via Glen Road, is discouraged due to a single-lane underpass crossing below the railroad tracks.
Transit riders will want to be aware that stops between Main Street and Hannaford will not be served during the closure. However, Advance Transit’s Red Line will be stopping at Shaw’s to the south and Main at Church Streets to the north of the closed bridge.
Copyright 2026 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.For the latest news, weather, sports, and streaming video, head to ABC22 & FOX44.