{"id":91367,"date":"2026-09-14T17:03:21","date_gmt":"2026-09-14T17:03:21","guid":{"rendered":"https:\/\/www.europesays.com\/japan\/91367\/"},"modified":"2026-09-14T17:03:21","modified_gmt":"2026-09-14T17:03:21","slug":"japanese-utility-execs-resign-over-falsified-quake-safety-data-for-2-nuclear-reactors-3","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/japan\/91367\/","title":{"rendered":"Japanese utility execs resign over falsified quake safety data for 2 nuclear reactors"},"content":{"rendered":"<p class=\"mb-4 text-lg md:leading-8 break-words\">TOKYO (AP) \u2014 The president of <a data-ylk=\"slk:Chubu Electric Power Co.;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/apnews.com\/article\/japan-hamaoka-nuclear-fabrication-data-893d7cf94e790ffb51cb1cf85254d658\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Chubu Electric Power Co.<\/a>, Japan&#8217;s third-largest utility, said Monday that he and the chairperson are resigning to take responsibility over the company&#8217;s yearslong manipulation of earthquake safety data for two nuclear reactors and that the operator will withdraw applications to restart them.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Japan has been gradually restarting some of the 54 nuclear reactors it shuttered in 2011, after the <a data-ylk=\"slk:Fukushima disaster;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/apnews.com\/article\/japan-fukushima-earthquake-tsunami-nuclear-radiation-c3fd16050902c0b82b0a9d5bd1408022\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Fukushima disaster<\/a>, when a 9.0 earthquake off Japan&#8217;s northeastern coast and a subsequent tsunami caused meltdowns at three reactors operated by Tokyo Electric Power Company Holdings, or TEPCO.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Chubu Electric&#8217;s announcement comes at a time when Prime Minister <a data-ylk=\"slk:Sanae Takaichi&#039;s government;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/apnews.com\/article\/japan-earthquake-tsunami-nuclear-disaster-fukushima-9727fc1f169a199246cc0932719eae68\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">Sanae Takaichi&#8217;s government<\/a> has accelerated nuclear reactor restarts amid rising energy costs and as it comes under pressure to reduce carbon emissions.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Chubu Electric President Kingo Hayashi said that an outside investigative panel found that the utility had for years provided manipulated seismic data for its Hamaoka No. 3 and No. 4 reactors to ensure the figures met requirements.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">With the credibility of the safety data in serious question, the utility has decided to drop the pending restart application for the two reactors, Hayashi said.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">&#8220;We had serious problems with our corporate culture and governance,&#8221; Hayashi said. &#8220;Regaining public trust is our top priority.&#8221;<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Hayashi and chairperson Satoru Katsuno were not directly linked to the data manipulation. But the top management set early resumption as a key business target and harshly reprimanded a team working on a resumption permit because of the prolonged screening, which might have pressured them into wrongdoing, the report said.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Hayashi and Katsuno will officially step down on Sept. 30, while Minoru Yasui, currently a director, will be promoted to president on Oct. 1.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Chubu Electric applied for safety screening to resume operations at the No. 3 and 4 reactors at the Hamaoka plant in 2014 and 2015, but the Nuclear Regulation Authority suspended their screening in December after months of internal investigation based on a tip from a whistleblower.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Two other reactors at the plant are being decommissioned, and a fifth is idle.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">The plant, about 200 kilometers (125 miles) west of Tokyo, is located on a coastal area known for potential risks from so-called Nankai Trough megaquakes.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Hayashi said nuclear power generation remains an important energy supply and that the utility will reapply for restarts of the No. 3 and No. 4 reactors after implementing preventive measures, restructuring and making a fresh start.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Public opinion on nuclear energy in Japan remains divided due to lingering safety concerns after the <a data-ylk=\"slk:2011 Fukushima Daiichi meltdowns;elm:context_link;itc:0;sec:content-canvas;\" data-yga=\"{&quot;yLinkElement&quot;:&quot;link&quot;,&quot;yLinkElementType&quot;:&quot;article_link&quot;}\" href=\"https:\/\/apnews.com\/article\/japan-fukushima-earthquake-tsunami-nuclear-radiation-c3fd16050902c0b82b0a9d5bd1408022\" rel=\"noopener noreferrer nofollow\" target=\"_blank\">2011 Fukushima Daiichi meltdowns<\/a>, though acceptance has gradually grown as many households face rising fuel costs from the repercussions of the Middle East conflict.<\/p>\n<p class=\"mb-4 text-lg md:leading-8 break-words\">Of Japan&#8217;s 54 commercial reactors, 11 are currently in operation, 20 are offline and more than 20 others are being decommissioned, according to the Nuclear Regulation Authority.<\/p>\n","protected":false},"excerpt":{"rendered":"TOKYO (AP) \u2014 The president of Chubu Electric Power Co., Japan&#8217;s third-largest utility, said Monday that he and&hellip;\n","protected":false},"author":2,"featured_media":91368,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[57268,57267,8,17,29614,13260],"class_list":["post-91367","post","type-post","status-publish","format-standard","has-post-thumbnail","category-japan","tag-chubu-electric-power","tag-data-manipulation","tag-japan","tag-japanese","tag-nuclear-reactors","tag-utility"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/posts\/91367","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/comments?post=91367"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/posts\/91367\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/media\/91368"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/media?parent=91367"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/categories?post=91367"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/tags?post=91367"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}