{"id":93407,"date":"2026-09-18T03:18:10","date_gmt":"2026-09-18T03:18:10","guid":{"rendered":"https:\/\/www.europesays.com\/japan\/93407\/"},"modified":"2026-09-18T03:18:10","modified_gmt":"2026-09-18T03:18:10","slug":"japans-nuclear-revival-hits-setbacks-after-scandals-and-accidents","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/japan\/93407\/","title":{"rendered":"Japan\u2019s nuclear revival hits setbacks after scandals and accidents"},"content":{"rendered":"<p>Japan\u2019s nuclear revival is facing fresh setbacks after a summer of scandals and regulatory hurdles delayed reactor restarts, threatening the country\u2019s plans to expand atomic power as electricity demand and energy costs rise.<\/p>\n<p>BloombergNEF expects nine reactors totaling 9.6 gigawatts of power to restart through 2040, down from a previous outlook of 11 units. Japan will fall at least 11.7 gigawatts short of its 2040 target of generating 35 gigawatts of electricity from nuclear, BNEF said.<\/p>\n<p>The weaker outlook comes after Chubu Electric Power withdrew applications to restart two units at its Hamaoka nuclear plant in Shizuoka Prefecture after <a href=\"https:\/\/www.japantimes.co.jp\/business\/2026\/09\/18\/companies\/nra-fraud-chubu-electric-time\/\" rel=\"nofollow noopener\" target=\"_blank\">being accused of fabricating seismic data<\/a> for the facility.<\/p>\n<p>Hokkaido Electric Power\u2019s effort to restart its reactor is also facing delays after a fatal accident during construction of a seawall at its Tomari nuclear plant and the rejection of proposed safety measures by regulators. BNEF subsequently pushed its forecast for the restart of Tomari No. 3 back a year to 2028.<\/p>\n<p>Japan has been pushing for the resumption of reactors shut in the aftermath of the 2011 Fukushima disaster, in order to curb a reliance on expensive imported fossil fuels. The delays threaten to keep power prices elevated\u00a0and expose the country to volatile liquefied natural gas (LNG) and coal markets, just as the artificial intelligence boom is expected to lift electricity demand.<\/p>\n<p>\u201cWe expect Japan data center power demand to double by 2030 from current levels,\u201d said Robert Liew, director of integrated energy research at Wood Mackenzie. \u201cIf not using nuclear, alternative sources of baseload power will be required from either more coal or LNG imports.\u201d<\/p>\n<p>Nationwide spot electricity prices recently hit the highest level since 2022 due to the near-closure of the Strait of Hormuz, which has choked about a fifth of global LNG supply.<\/p>\n<p>Japan\u2019s strict regulatory regime and pockets of local opposition mean\u00a0only 15 of the nation\u2019s 33 operable reactors are currently online.<\/p>\n<p>The problems in Hokkaido jeopardize its\u00a0plan to become a major data-center hub, as electricity demand there is forecast to grow faster than any other part of Japan, according to the Organization for Cross-regional Coordination of Transmission Operators. The No. 3 unit at Tomari, Hokkaido\u2019s only operable nuclear power plant, could meet as much as a third of the island\u2019s power demand if restarted, according to BNEF.<\/p>\n<p>Japan\u2019s government set a goal in June to replace as many as 14 retiring reactors with new units by the 2050s. The country is aiming for about 20% of its power mix to come from nuclear energy by 2040, compared to 9% today, but still well below almost a third before the Fukushima disaster.<\/p>\n","protected":false},"excerpt":{"rendered":"Japan\u2019s nuclear revival is facing fresh setbacks after a summer of scandals and regulatory hurdles delayed reactor restarts,&hellip;\n","protected":false},"author":2,"featured_media":93408,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[12488,19279,8,83,1131,5538],"class_list":["post-93407","post","type-post","status-publish","format-standard","has-post-thumbnail","category-japan","tag-chubu-electric","tag-data-centers","tag-japan","tag-lng","tag-nuclear-energy","tag-utilities"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/posts\/93407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/comments?post=93407"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/posts\/93407\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/media\/93408"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/media?parent=93407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/categories?post=93407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/japan\/wp-json\/wp\/v2\/tags?post=93407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}