HD Hyundai Heavy Industries will invest a total of ₩1.0722 trillion (approximately $801.5 million) to build a new power generation engine production base and a dedicated small modular reactor (SMR) fabrication plant, targeting the rapidly growing power demand from artificial intelligence (AI) data centers.

In a regulatory filing on the 10th, the company announced it will allocate ₩833.6 billion (approximately $623.2 million) to a HiMSEN engine production base in Onsan-eup, Ulju-gun, Ulsan, and ₩238.6 billion (approximately $178.4 million) to a dedicated SMR main equipment plant within its Ulsan shipyard. The decision is part of a strategy to strengthen its position in the onshore power generation market while addressing the large-scale power supply requirements of AI data centers.

HiMSEN Engine Production Base Targets May 2028 Launch

The new production base in Onsan-eup will be built on approximately 215,000 square meters (65,000 pyeong) of land with an annual production capacity of 3 gigawatts (GW). The facility will house engine assembly and commissioning plants, a crankshaft machining plant, and an engine block casting plant. Construction is scheduled to begin in the first quarter of next year, with completion slated for May 2028, followed by full-scale operations.

The HiMSEN engine is an engine independently developed by HD Hyundai Heavy Industries, which holds the license. It has primarily been used for medium-sized vessel propulsion and large vessel power generation. Recently, it has gained attention as a power solution for AI data centers, driving expanded demand.

The company plans to dualize its production bases to enhance efficiency. The existing Ulsan main plant will focus on producing HiMSEN engines for marine applications, while the new plant and HD Hyundai Engine in Yeongam, South Jeolla Province, will be dedicated to onshore power generation engines. Through this arrangement, the company aims to secure annual onshore power generation engine production capacity of 4GW.

Total HiMSEN engine production capacity is expected to more than double from the current 3GW to 7.2GW by 2030.

Dedicated SMR Plant to Be Completed in First Half of 2029

The dedicated SMR main equipment fabrication plant will be constructed on land within the Ulsan shipyard, with completion targeted for the first half of 2029. SMRs are next-generation nuclear reactors that reduce output compared to conventional large-scale nuclear plants and modularize key equipment, offering the advantage of simultaneously achieving stable power supply and carbon reduction.

As AI data centers requiring 24-hour large-scale power rapidly increase, interest in SMRs is also rising. HD Hyundai Heavy Industries’ strategy is to extend its engine and large-scale structure fabrication capabilities accumulated in the shipbuilding industry into the nuclear power sector, positioning AI-era power infrastructure as a new growth engine.

The company is collaborating with U.S.-based TerraPower to enter the global SMR market. HD Hyundai Chairman Chung Ki-sun met with Bill Gates, TerraPower founder and chairman, on August 14 to discuss cooperation on commercializing the next-generation SMR “Natrium.”

Onshore Power Generation Market Already Yielding Order Wins

Visible results are already emerging in the onshore power generation market. In April this year, HD Hyundai Heavy Industries signed a power equipment supply contract worth ₩627.1 billion (approximately $468.8 million) with Aperion Energy Group of the United States, followed by a ₩956 billion (approximately $714.7 million) contract with Corban Energy Group in August.

An HD Hyundai Heavy Industries official said, “This investment is aimed at securing core competitiveness in power generation engines and SMRs, which are gaining attention as new power sources in the AI era,” adding, “We will proactively respond to surging power demand while taking the lead in the global AI infrastructure market.”

Meanwhile, HD Hyundai Heavy Industries reported second-quarter revenue of ₩6.3322 trillion (approximately $4.7 billion) and operating profit of ₩1.0399 trillion (approximately $777.4 million) this year.

Investment ItemAmountLocationCompletion TargetHiMSEN Engine New Production Base₩833.6 billionOnsan-eup, Ulju-gun, UlsanMay 2028Dedicated SMR Main Equipment Fabrication Plant₩238.6 billionWithin Ulsan ShipyardFirst Half 2029

Note: Total investment of ₩1.0722 trillion. HiMSEN engine production capacity expected to expand to 7.2GW by 2030.