{"id":170231,"date":"2026-09-29T03:28:50","date_gmt":"2026-09-29T03:28:50","guid":{"rendered":"https:\/\/www.europesays.com\/korea\/170231\/"},"modified":"2026-09-29T03:28:50","modified_gmt":"2026-09-29T03:28:50","slug":"hanwha-aerospace-expands-role-as-nuri-rocket-console-operations-grow-for-5th-launch","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/korea\/170231\/","title":{"rendered":"Hanwha Aerospace Expands Role as Nuri Rocket Console Operations Grow for 5th Launch"},"content":{"rendered":"<p><img decoding=\"async\" alt=\"The fifth launch of Nuri, carrying a total of 15 satellites\u2014five microsatellite constellation satellites and ten CubeSats\u2014is now nine days away. Courtesy of KARI\" src=\"https:\/\/www.europesays.com\/korea\/wp-content\/uploads\/2026\/09\/bd30a96624e478cf4cef0ca423b5a136.jpg\"\/><\/p>\n<p>The fifth launch of Nuri, carrying a total of 15 satellites\u2014five microsatellite constellation satellites and ten CubeSats\u2014is now nine days away. Courtesy of KARI.<\/p>\n<p>Hardware preparations for the fifth Nuri launch, which is scheduled to head to space on the 7th of next month, were completed on the 28th. This fifth launch will place 15 satellites into orbit. In particular, the participation of the private system integration company in launch operations will be significantly expanded. The Korea Aerospace Research Institute (KARI) plans to gradually increase the role of the private sector in the 6th and 7th launches so that the system integration company will take charge of launches starting from the 8th mission.<\/p>\n<p>At the \u201cNuri 5th Launch Online Academy\u201d held on the 28th, Han Young-min, director of KARI\u2019s Launch Vehicle Systems Research Directorate, said, \u201cThe technical goal of the fifth Nuri launch is to place all payload satellites into orbit in a stable manner, and from the launch operations perspective, it is to expand the participation of the system integration company.\u201d<\/p>\n<p>The Nuri rocket to be launched this time will carry a total of 15 satellites: five microsatellite constellation satellites and ten CubeSats. Unlike the fourth launch, which had a single primary payload, the fifth mission will carry five microsatellite constellation satellites as its primary payloads.<\/p>\n<p>Another key point of interest in the fifth Nuri launch is the \u201cexpansion of private-sector participation.\u201d Han explained, \u201cThe Korean Launch Vehicle Advancement Program, which is underway following the completion of the Nuri development project, aims to enhance launch reliability through repeated launches while transferring Nuri technology to the private sector to foster a domestic launch vehicle industry ecosystem.\u201d<\/p>\n<p>Han said, \u201cWe are transferring technology to Hanwha Aerospace (Hanwha Aero), the system integration company,\u201d adding, \u201cWe have already handed over all the documents and are conveying detailed technical information through seminars and training.\u201d He continued, \u201cA great deal of technology transfer is also taking place between Hanwha Aero personnel and KARI personnel during launch operations.\u201d<\/p>\n<p>The role of the private sector has already expanded significantly at the production stage. For the first to third Nuri launches, KARI oversaw launch vehicle manufacturing and final assembly, but for the fourth and fifth launches, Hanwha Aero has been responsible for launch vehicle production and overall assembly.<\/p>\n<p>In the fifth launch, private-sector participation in launch operations will be expanded one step further. The number of Hanwha Aero personnel involved in launch operations increased by 10, from 32 in the fourth launch to 42. Of the 22 launch vehicle-related consoles in the Launch Control Center (LCC), Hanwha Aero staff will participate at 20, and among them, 18 will operate the consoles directly. These duties were previously performed by KARI personnel.<\/p>\n<p>Han said, \u201cThe scope of tasks actually handled by Hanwha Aero, the system integration company, has increased,\u201d and noted that the private sector\u2019s role will expand further in subsequent launches. Starting from the sixth launch, each stage will be assembled at Hanwha Aero\u2019s Suncheon stage assembly plant and then transported to the Naro Space Center for full assembly of the first, second, and third stages.<\/p>\n<p>Han added, \u201cFor the 6th and 7th launches, we will gradually increase the participation of the system integration company, and from the 8th launch onward, the system integration company will take the lead in conducting launches according to schedule.\u201d<\/p>\n<p>Hardware preparations for the fifth Nuri launch vehicle are also in their final stages. As of the 28th, assembly of the first and second stages has been completed, and work on the third stage is underway. Han said, \u201cBy this afternoon (28th), assembly will be almost complete.\u201d<\/p>\n<p>The fifth Nuri launch is scheduled to take place between 12:23 p.m. and 1:23 p.m. on October 7. Before launch, weather conditions, the possibility of collisions with space objects, and the space environment will be comprehensively reviewed, and the final launch decision will be made based on analysis results compiled eight hours prior to launch. If the average ground wind speed exceeds 15 m\/s or the maximum instantaneous wind speed exceeds 21 m\/s, the launch may be postponed.<\/p>\n<p>Han said, \u201cIn early October, the weather at the Naro Space Center is generally clear, and wind speeds are forecast to remain within 3\u20135 m\/s, so we do not expect major weather issues,\u201d while also noting, \u201cWe will only know for sure on the actual day.\u201d<\/p>\n<p>Copyright \u24d2 DongA Science. All rights reserved.<\/p>\n","protected":false},"excerpt":{"rendered":"The fifth launch of Nuri, carrying a total of 15 satellites\u2014five microsatellite constellation satellites and ten CubeSats\u2014is now&hellip;\n","protected":false},"author":2,"featured_media":170232,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[84568,84564,355,277,354,10243,10241,20169,10233,25092,57078,84569,10219,84565,84566,84567,40029,10227,10230,10231],"class_list":["post-170231","post","type-post","status-publish","format-standard","has-post-thumbnail","category-hanwha","tag-5th","tag-84564","tag-hanwha","tag-hanwha-aerospace","tag-hanwha-group","tag-kari","tag-korea-aerospace-research-institute","tag-launch","tag-nuri","tag-private-sector","tag-space-agency","tag-space-aeronautics-agency","tag-10219","tag-84565","tag-84566","tag-84567","tag-40029","tag-10227","tag-10230","tag-10231"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/170231","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/comments?post=170231"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/170231\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media\/170232"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media?parent=170231"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/categories?post=170231"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/tags?post=170231"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}