{"id":179979,"date":"2026-10-07T06:22:10","date_gmt":"2026-10-07T06:22:10","guid":{"rendered":"https:\/\/www.europesays.com\/korea\/179979\/"},"modified":"2026-10-07T06:22:10","modified_gmt":"2026-10-07T06:22:10","slug":"posco-holdings-completes-upstream-facility-at-second-lithium-brine-plant-in-argentina","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/korea\/179979\/","title":{"rendered":"POSCO Holdings Completes Upstream Facility at Second Lithium Brine Plant in Argentina"},"content":{"rendered":"<p>Combined annual production capacity of 48,000 tonnes secured at Plants 1 and 2 in Argentina Linking with the downstream facility in Yulchon in 2027 to complete a 50,000-tonne lithium hydroxide production system Chairman Chang In-hwa: \u201cTaking another step toward becoming Korea\u2019s leading resource development company\u201d  <\/p>\n<p>            <img decoding=\"async\" src=\"https:\/\/www.europesays.com\/korea\/wp-content\/uploads\/2026\/10\/news-p.v1.20261007.97b0226507b34db9825fd4b4c5c79879_P1.jpg\" orgwidth=\"700\" orgheight=\"467\" alt=\"Attendees pose for a commemorative photo at the completion ceremony for the upstream facility at POSCO Argentina\u2019s second lithium brine plant on the 6th (local time). From left: Bang Seok-ju, head of POSCO E&amp;C\u2019s Plant Business Division; Flavia Roy\u00f3n, chair of the Argentine Senate Committee on Mining, Energy and Fuels; Fernanda \u00c1vila, chair of the Chamber of Deputies Committee on Mining; Kim Ki-su, head of POSCO Holdings\u2019 Future Technology Research Institute; Lee Jong-hwa, South Korean ambassador to Argentina; Karina Milei, chief of staff at the President\u2019s Office; POSCO Group Chairman Chang In-hwa; Diego Santilli, federal Chief of the Cabinet of Ministers; Salta Governor Gustavo S\u00e1enz; Catamarca Governor Ra\u00fal Jalil; Park Hyeon, head of POSCO Argentina S.A.U.; and Sergio Reu, head of the industry sector at IDB Invest. POSCO Holdings\"\/>                      \uc0ac\uc9c4 \ud655\ub300                Attendees pose for a commemorative photo at the completion ceremony for the upstream facility at POSCO Argentina\u2019s second lithium brine plant on the 6th (local time). From left: Bang Seok-ju, head of POSCO E&amp;C\u2019s Plant Business Division; Flavia Roy\u00f3n, chair of the Argentine Senate Committee on Mining, Energy and Fuels; Fernanda \u00c1vila, chair of the Chamber of Deputies Committee on Mining; Kim Ki-su, head of POSCO Holdings\u2019 Future Technology Research Institute; Lee Jong-hwa, South Korean ambassador to Argentina; Karina Milei, chief of staff at the President\u2019s Office; POSCO Group Chairman Chang In-hwa; Diego Santilli, federal Chief of the Cabinet of Ministers; Salta Governor Gustavo S\u00e1enz; Catamarca Governor Ra\u00fal Jalil; Park Hyeon, head of POSCO Argentina S.A.U.; and Sergio Reu, head of the industry sector at IDB Invest. POSCO Holdings      <\/p>\n<p refid=\"2\">With the completion of the upstream facility at its second lithium brine plant in Argentina, POSCO Holdings has laid the groundwork for establishing an annual production capacity of 50,000 tonnes of lithium hydroxide, eight years after acquiring mining rights at the Hombre Muerto salt flat in 2018.<\/p>\n<p refid=\"3\">On the 6th (local time), POSCO Holdings held a completion ceremony for the upstream facility at its second lithium brine plant near the Hombre Muerto salt flat, at an altitude of 4,000 meters. Attendees included POSCO Group Chairman Chang In-hwa; Karina Milei, chief of staff at the Argentine President\u2019s Office; Diego Santilli, the federal Chief of the Cabinet of Ministers; Salta Governor Gustavo S\u00e1enz; Catamarca Governor Ra\u00fal Jalil; and Lee Jong-hwa, South Korea\u2019s ambassador to Argentina.<\/p>\n<p refid=\"4\">At the ceremony, Chairman Chang said, \u201cSince 2014, when I was head of the New Business Division, I have visited sites myself while searching for salt flats suitable for lithium development, so reaching completion today is deeply moving. POSCO Group has taken another step toward becoming a resource development company representing the Republic of Korea.\u201d<\/p>\n<p refid=\"5\">The significance of the completion is that POSCO Group has further expanded its foundation for commercial production, following its proactive efforts to secure lithium resources. The upstream facility at the second plant, completed with a total investment of $954 million, has an annual lithium carbonate production capacity of 23,000 tonnes. This brings the company\u2019s total commercial production capacity in Argentina to 48,000 tonnes, including the existing first plant\u2019s capacity of 25,000 tonnes.<\/p>\n<p refid=\"6\">By linking the lithium carbonate produced at the second plant\u2019s upstream facility with a downstream facility scheduled for completion in 2027 at the Yulchon Industrial Complex in South Jeolla Province, and converting it into 25,000 tonnes of lithium hydroxide for battery use per year, POSCO Holdings will be able to complete a brine-based lithium hydroxide production system with a total capacity of 50,000 tonnes.<\/p>\n<p refid=\"7\">POSCO Group began developing its own lithium extraction technology in 2010, after recognizing lithium\u2019s growth potential, and has continued to make proactive investments, including acquiring the Hombre Muerto salt flat in Argentina in 2018.<\/p>\n<p refid=\"8\">Going forward, the company plans to bring the second plant into normal operation as soon as possible and accelerate new investments in Plants 3 and 4 to achieve a 100,000-tonne lithium brine production system by 2033. On the day of the completion ceremony, POSCO Argentina S.A.U. signed a memorandum of understanding (MOU) with the provincial governments of Salta and Catamarca to pursue the two plants.<\/p>\n<p refid=\"9\">Plants 3 and 4 will each have an annual lithium carbonate production capacity of 25,000 tonnes, enabling POSCO Group to respond to growth in the energy storage system (ESS) market driven by the expansion of AI data centers and rising demand for lithium iron phosphate (LFP) batteries.<\/p>\n<p style=\"font-size: 1.5rem;\">\nThis article has been translated by GripLabs Mingo AI.<\/p>\n","protected":false},"excerpt":{"rendered":"Combined annual production capacity of 48,000 tonnes secured at Plants 1 and 2 in Argentina Linking with the&hellip;\n","protected":false},"author":2,"featured_media":179980,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[380],"tags":[19434,28013,1356,442,2620,460,2782],"class_list":["post-179979","post","type-post","status-publish","format-standard","has-post-thumbnail","category-posco","tag-argentina","tag-lithium-brine","tag-lithium-hydroxide","tag-posco","tag-posco-group","tag-posco-holdings","tag-production-capacity"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/179979","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/comments?post=179979"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/179979\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media\/179980"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media?parent=179979"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/categories?post=179979"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/tags?post=179979"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}