{"id":192277,"date":"2026-10-17T22:31:08","date_gmt":"2026-10-17T22:31:08","guid":{"rendered":"https:\/\/www.europesays.com\/korea\/192277\/"},"modified":"2026-10-17T22:31:08","modified_gmt":"2026-10-17T22:31:08","slug":"seoul-races-to-meet-30000-home-goal-as-demolition-delays-squeeze-year-end-starts","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/korea\/192277\/","title":{"rendered":"Seoul races to meet 30,000-home goal as demolition delays squeeze year-end starts"},"content":{"rendered":"<p><img src=\"https:\/\/www.europesays.com\/korea\/wp-content\/uploads\/2026\/10\/DXG7BVU7NZN7HLCV6BYZIETQ64.JPG\" alt=\"A view of Hannam District 3 in Yongsan-gu, Seoul. \/Courtesy of News1\" height=\"346\" width=\"616\" decoding=\"async\"  loading=\"lazy\"\/>A view of Hannam District 3 in Yongsan-gu, Seoul. \/Courtesy of News1<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">About 97% of the remaining 16,117 households in maintenance projects that Seoul said would break ground within the year are concentrated in November and December. Of the 11 establishments, five are still undergoing demolition, and some are stuck at demolition rates in the 50%\u201370% range. The city said there is no problem starting construction within the year because work can begin on sites where demolition has been completed.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">According to Seoul&#8217;s &#8220;sites scheduled to break ground in the second half of 2026&#8221; data obtained by ChosunBiz on the 18th, the remaining scheduled starts are 492 households in October, 8,640 in November, and 6,985 in December. A total of 15,625 households, or 96.9% of the total, are concentrated in the last two months of the year. Seoul tallies groundbreaking performance based on the filing of a groundbreaking report.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">As of the 12th, the reference date for the data, establishments where demolition is underway are five sites: Hannam District 3 in Yongsan District (5,970 households), Macheon District 4 in Songpa District (1,254 households), Noryangjin District 5 (727 households) and District 7 (576 households) in Dongjak District, and Geumho District 16 in Seongdong District (595 households). The dwellings to be built at these establishments total 9,122 households, accounting for 56.6% of the remaining groundbreaking volume.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">Demolition progress varies by establishment. The largest, Hannam District 3, is at 99%, and Macheon District 4 is at 95%, both near completion. By contrast, Noryangjin District 7, slated to break ground in December, is at 50%. Noryangjin District 5, also targeting a December start, is at 70%, and Geumho District 16, scheduled for November, is at 75%.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">Seoul said breaking ground within the year is possible even if demolition is still underway in some districts. A city official said, &#8220;For most establishments scheduled to start this year, dismantling work is nearly complete,&#8221; and added, &#8220;Although work in the Noryangjin districts is somewhat delayed, there is no issue with starting within the year because we will break ground first on the main site where demolition is complete and carry out infrastructure work afterward.&#8221; The official went on, &#8220;Internally, we expect that filing for groundbreaking will be possible in early to mid-December.&#8221;<\/p>\n<p><img src=\"https:\/\/www.europesays.com\/korea\/wp-content\/uploads\/2026\/10\/ME3WIYJXMNRWKNBSGUZTIOBRMQ.jpg\" alt=\"\uc11c\uc6b8\uc2dc\uccad \uc804\uacbd. 2022.9.1 \u24d2 \ub274\uc2a41 \ubc15\uc9c0\ud61c \uae30\uc790\" height=\"410\" width=\"616\" decoding=\"async\"  loading=\"lazy\"\/>A view of Seoul City Hall. \/Courtesy of News1<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">Some sites have a considerable gap between demolition completion and the scheduled groundbreaking date. Bangbae District 13 in Seocho District (2,228 households) finished demolition on Jan. 30 but is slated to break ground in December. Susaek District 8 in Eunpyeong District (620 households) also finished demolition in January and is aiming for a November start.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">A construction company official, speaking about typical factors for judging the start of construction, said, &#8220;From a contractor&#8217;s perspective, it is more important to continue work without interruption after starting within the year than to turn the first shovel,&#8221; and added, &#8220;If equipment and labor are mobilized before the project financing and payment terms are finalized and the work stops, additional burdens such as site maintenance costs can arise.&#8221;<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">The remaining volume is concentrated in large establishments and some contractors. Hannam District 3 alone accounts for 5,970 households, or 37% of the total. By contractor, Hyundai Engineering &amp; Construction is handling 9,274 households across five sites\u2014Hannam District 3, Macheon District 4, Geumho District 16, Noryangjin District 4, and Hongje District 3\u2014representing 57.5% of the total. Lotte Engineering &amp; Construction will build 2,692 households, GS Engineering &amp; Construction 2,228, SK ecoplant 1,196, and Daewoo Engineering &amp; Construction 727.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">Seoul said on the 13th that 14 of the 25 maintenance establishments it has managed as targets for groundbreaking this year\u2014about 15,000 households\u2014have already started. If the remaining 11 proceed as planned, the city said it can reach its annual goal of 30,000 households.<\/p>\n<p class=\" article-body__content article-body__content-text | text--black text font--size-sm-18 font--size-md-18 font--primary\">On the 13th, the city signed a joint cooperation agreement with 11 associations, five contractors, and eight district offices to review establishment-specific issues such as construction cost disputes and permitting delays. Kim Seong-bo, Seoul&#8217;s second vice mayor for administration, said, &#8220;The last volumes are concentrated in December,&#8221; and added, &#8220;We plan to review progress again at year&#8217;s end and try to break ground on the final volumes.&#8221;<\/p>\n<p>\u203b This article has been translated by AI. Share your feedback <a class=\"font--tertiary font--size-md-16 font--size-sm-16 text--grey-60 text--underline\" style=\"border-bottom:0\" href=\"javascript:throw new Error('React has blocked a javascript: URL as a security precaution.')\">here.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"A view of Hannam District 3 in Yongsan-gu, Seoul. \/Courtesy of News1 About 97% of the remaining 16,117&hellip;\n","protected":false},"author":2,"featured_media":192278,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[39527,15726,41234,15637,92686,61703,22264,112,14416],"class_list":["post-192277","post","type-post","status-publish","format-standard","has-post-thumbnail","category-seoul","tag-daewoo-engineering-construction","tag-groundbreaking","tag-gs-engineering-construction","tag-hyundai-engineering-construction","tag-lotte-engineering-construction","tag-maintenance-project","tag-redevelopment","tag-seoul","tag-sk-ecoplant"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/192277","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/comments?post=192277"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/192277\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media\/192278"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media?parent=192277"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/categories?post=192277"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/tags?post=192277"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}