{"id":208957,"date":"2026-10-30T08:13:28","date_gmt":"2026-10-30T08:13:28","guid":{"rendered":"https:\/\/www.europesays.com\/korea\/208957\/"},"modified":"2026-10-30T08:13:28","modified_gmt":"2026-10-30T08:13:28","slug":"koreas-khnp-fails-to-reach-construction-deal-on-18-billion-czech-nuclear-project","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/korea\/208957\/","title":{"rendered":"Korea&#8217;s KHNP Fails to Reach Construction Deal on $18 Billion Czech Nuclear Project"},"content":{"rendered":"<p><img loading=\"lazy\" alt=\"Korea's KHNP Fails to Reach Construction Deal on $18 Billion Czech Nuclear Project - Seoul Economic Daily Finance News from South Korea\" title=\"Korea's KHNP Fails to Reach Construction Deal on $18 Billion Czech Nuclear Project\" width=\"1200\" height=\"675\" decoding=\"async\" data-nimg=\"1\" class=\"w-full h-auto rounded-sm\" style=\"color:transparent;object-fit:contain;object-position:center\" src=\"https:\/\/www.europesays.com\/korea\/wp-content\/uploads\/2026\/10\/news-p.v1.20261029.aa56bbca040c451ea1d09b76d97ba664_P1.png\"\/><\/p>\n<p class=\"mb-4 text-[var(--color-text)] leading-relaxed\">Korea Hydro &amp; Nuclear Power has broken off construction contract talks with a consortium of Daewoo Engineering &amp; Construction (047040) and Doosan Enerbility (034020) for the Dukovany nuclear power plant in the Czech Republic. KHNP said it would begin terminating its joint cooperation agreement with the consortium and prepare a tender to select a new builder.<\/p>\n<p class=\"mb-4 text-[var(--color-text)] leading-relaxed\">&#8220;The two sides were unable to reach a final agreement because of differences over key contract terms,&#8221; KHNP said on the 29th. &#8220;We have decided to formally end the construction contract negotiations to ensure the stable progress of the overall project.&#8221; The two sides had sought a deal through working-level negotiations, a dispute mediation committee and talks between senior management, but failed to narrow their differences.<\/p>\n<p class=\"mb-4 text-[var(--color-text)] leading-relaxed\">KHNP is reviewing follow-up measures to minimize the impact on the project from selecting a new contractor. It is also drawing up contingency plans, including carrying out essential tasks directly, to guard against any gap in work before a new builder is chosen.<\/p>\n<p class=\"mb-4 text-[var(--color-text)] leading-relaxed\">The Dukovany project, worth about 26 trillion won ($18 billion), calls for the construction of two 1,000-megawatt Korean-designed reactors (APR1000) in the Czech Republic. After signing the main contract with Czech client EDU II in June last year, KHNP awarded an overall design services contract to KEPCO Engineering &amp; Construction and supply contracts for reactor and turbine generator equipment to Doosan Enerbility.<\/p>\n<p class=\"mb-4 text-[var(--color-text)] leading-relaxed\">Negotiations on a nuclear fuel contract with KEPCO Nuclear Fuel and a commissioning and maintenance services contract with KEPCO KPS are targeted for signing in 2027. &#8220;We will work closely with the government, the client and partner companies to minimize the impact on the main contract and to push ahead with the project as originally planned,&#8221; KHNP said.<\/p>\n","protected":false},"excerpt":{"rendered":"Korea Hydro &amp; Nuclear Power has broken off construction contract talks with a consortium of Daewoo Engineering &amp;&hellip;\n","protected":false},"author":2,"featured_media":208958,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[98141,98944,98943,39527,410,409,408,32079,5403],"class_list":["post-208957","post","type-post","status-publish","format-standard","has-post-thumbnail","category-doosan","tag-apr1000","tag-construction-contract-talks","tag-czech-republic-nuclear","tag-daewoo-engineering-construction","tag-doosan","tag-doosan-enerbility","tag-doosan-group","tag-dukovany-nuclear-power-plant","tag-khnp"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/208957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/comments?post=208957"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/208957\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media\/208958"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media?parent=208957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/categories?post=208957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/tags?post=208957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}