{"id":230826,"date":"2026-11-16T08:21:11","date_gmt":"2026-11-16T08:21:11","guid":{"rendered":"https:\/\/www.europesays.com\/korea\/230826\/"},"modified":"2026-11-16T08:21:11","modified_gmt":"2026-11-16T08:21:11","slug":"bkt-reshapes-mahenge-funding-plan","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/korea\/230826\/","title":{"rendered":"BKT reshapes Mahenge funding plan"},"content":{"rendered":"<p>POSCO\u2019s amended subscription is binding but remains conditional, including on the ACM investment<\/p>\n<p>ACM proposes US$70m for a 36.7% interest in Mahenge\u2019s project holding company<\/p>\n<p>BKT still needs to secure remaining US$40m of Module 1 equity<\/p>\n<p>Special Report: Financing of Black Rock Mining\u2019s Mahenge graphite project in Tanzania is closer to the finish line after POSCO reaffirmed its US$40m equity subscription and Black Rock lined up a non-binding US$70m investment.<\/p>\n<p>Together with a construction loan and POSCO prepayment facility, the POSCO equity subscription and non-binding project-level investment from African Critical Minerals (ACM) could provide US$258m of Mahenge\u2019s estimated US$298m Module 1 funding requirement.<\/p>\n<p><a class=\"body-link\" href=\"https:\/\/stockhead.com.au\/company\/black-rock-mining-bkt\/\" rel=\"nofollow noopener\" target=\"_blank\">Black Rock Mining (ASX:BKT)<\/a> has amended and restated its binding subscription agreement with POSCO International, lifting the strategic partner\u2019s voting-power cap and aligning the subscription with the proposed ACM investment.<\/p>\n<p>POSCO will subscribe in two tranches.<\/p>\n<p>The first is A$9m through 155.3 million shares at 5.8c each, unchanged from the 2024 agreement.<\/p>\n<p>The second will take POSCO\u2019s investment to US$40m, with the balance issued at the price of the equity raise needed to complete Module 1 funding.<\/p>\n<p>POSCO\u2019s voting power is estimated to rise from about 5.87% to 37.6%, depending on the final issue price and raise size, subject to a 49.99% cap.<\/p>\n<p>Project financing<\/p>\n<p>ACM has signed a non-binding term sheet to invest US$70m for a 36.7% fully diluted interest in Imara Resources, a proposed Tanzanian holding company above Mahenge\u2019s project operator.<\/p>\n<p>The investment is backed by South Africa\u2019s Public Investment Corporation and Lionhead Capital Advisors.<\/p>\n<p>BKT would retain management and majority ownership of Imara, including a 10% performance reward trust.<\/p>\n<p>If the trust\u2019s shares vest, BKT\u2019s effective interest in Mahenge would be about 53.2%, while Tanzania would retain its 16% free-carried stake.<\/p>\n<p>The funding plan comprises a US$138m construction loan, POSCO\u2019s US$10m prepayment facility, the US$40m POSCO subscription and the proposed US$70m ACM investment.<\/p>\n<p>Together, these would provide US$258m of the roughly US$298m requirement, leaving about US$40m of equity to be secured.<\/p>\n<p>BKT must secure that remaining equity and meet other conditions before either investment can complete.<\/p>\n<p>ACM\u2019s proposal remains non-binding and is subject to due diligence, approvals and definitive documents.<\/p>\n<p>POSCO\u2019s binding subscription is also conditional, including on shareholder approval and the ACM investment completing at the same time.<\/p>\n<p>BKT is targeting financial close by December 31, 2026.<\/p>\n<p>The current deadline for the US$204m facilities package is November 30, with an extension to January 31, 2027, being sought.<\/p>\n<p>Shareholder approval and an independent expert\u2019s report are also required before POSCO\u2019s shares can be issued.<\/p>\n<p>\u201cWith due diligence well advanced, our timetable is aligned to financial close and targeting satisfaction of conditions precedent by 31 December 2026,\u201d managing director John de Vries said.<\/p>\n<p>Battery demand meets concentrated supply<\/p>\n<p>Global battery demand grew by more than 35% in 2025 to top 1.5 terawatt-hours, while almost all refined graphite supply growth over 2023-25 came from China, the International Energy Agency reported.<\/p>\n<p>On 13 November, Shanghai Metals Market assessed China\u2019s -195 flake graphite at US$360 a tonne before VAT, a domestic delivered price that differs from Mahenge\u2019s FOB Dar es Salaam outlook.<\/p>\n<p>That outlook uses expert-consensus prices, with premiums of 10% for 96% total graphitic carbon (TGC) -100 mesh concentrate and 25% for other products at 97.5% TGC.<\/p>\n<p>Mahenge\u2019s product mix is designed to serve battery and industrial markets, with +80 mesh flake representing 60% of the distribution and +100 mesh lifting that share to 70%, according to the announcement.<\/p>\n<p>POSCO has an offtake agreement for all planned Module 1 fines concentrate, while the project\u2019s pricing case also depends on selling higher-grade products into markets where supply remains concentrated.<\/p>\n<p>This article was developed in collaboration with Black Rock Mining, a Stockhead advertiser at the time of publishing. <\/p>\n<p>This article does not constitute financial product advice. You should consider obtaining independent advice before making any financial decisions.<\/p>\n","protected":false},"excerpt":{"rendered":"POSCO\u2019s amended subscription is binding but remains conditional, including on the ACM investment ACM proposes US$70m for a&hellip;\n","protected":false},"author":2,"featured_media":230827,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[380],"tags":[108143,108135,108115,108130,108185,108117,108159,108086,108148,108183,108182,108146,108168,108125,108093,108110,108063,108165,108078,108087,108184,76272,1776,108118,57430,108113,108103,38035,3587,38265,108085,108100,108133,108149,108144,108186,108189,108166,108164,108059,108175,108161,108094,108145,108111,108179,108140,108099,108122,108126,108114,108072,108104,108187,108108,108152,108080,108124,108084,108172,108132,75681,108138,37011,108075,108127,108136,134,15601,108091,108180,108070,57425,108095,70213,108151,3470,108177,108167,108064,1314,108120,108157,108137,108107,108163,108176,108116,108150,108174,108169,108154,108060,108141,108071,451,5581,108156,108155,108090,108062,108076,95660,108058,108101,108074,108067,108073,442,465,108134,108102,108162,66168,108061,108106,108077,35995,14426,108188,4896,7968,108079,108147,108170,108190,108065,108121,108178,108089,108066,108082,108129,108158,108112,81076,108142,108173,108139,108092,108131,108088,108181,108083,108109,108057,108098,108119,108069,61864,108105,108097,108081,108068,108128,108153,108096,108171,108123,108160,108056,69835],"class_list":["post-230826","post","type-post","status-publish","format-standard","has-post-thumbnail","category-posco","tag-s-195-flake-graphite","tag-s-binding-subscription","tag-s-conditional-us40m-subscription","tag-s-effective-interest","tag-s-estimated-us298m","tag-s-fob-dar-es-salaam-outlook","tag-s-investment","tag-s-mahenge-graphite-project","tag-s-module-1-funding-requirement","tag-s-pricing-case","tag-s-product-mix","tag-s-project-operator","tag-s-proposal","tag-s-public-investment-corporation","tag-s-report","tag-s-shares","tag-s-us10m-prepayment-facility","tag-s-voting-power","tag-s-voting-power-cap","tag-100-mesh","tag-80-mesh-flake","tag-76272","tag-1776","tag-100-mesh-concentrate","tag-57430","tag-155-3-million-shares","tag-2023-25","tag-38035","tag-3587","tag-38265","tag-108085","tag-108100","tag-5-8c","tag-108149","tag-108144","tag-97-5-tgc","tag-a-10-performance-reward-trust","tag-a-36-7-fully-diluted-interest","tag-a-49-99-cap","tag-a-construction-loan","tag-a-domestic-delivered-price","tag-a-non-binding-term-sheet","tag-a-non-binding-us70m-investment","tag-a-proposed-tanzanian-holding-company","tag-a-proposed-us70m-acm-investment","tag-a-stockhead-advertiser","tag-a-tonne","tag-a-us138m-construction-loan","tag-a9m","tag-about-5-87-to-37-6","tag-about-53-2","tag-about-us40m","tag-acm","tag-african-critical-minerals","tag-all-planned","tag-almost-all-refined-graphite-supply-growth","tag-an-extension","tag-an-independent-expert","tag-an-offtake-agreement","tag-any-financial-decisions","tag-approvals","tag-asx","tag-battery-and-industrial-markets","tag-battery-demand","tag-bkt","tag-black-rock","tag-black-rock-mining","tag-china","tag-collaboration","tag-concentrated-supply-global-battery-demand","tag-conditions-precedent","tag-december-2026","tag-december-31","tag-definitive-documents","tag-due-diligence","tag-either-investment","tag-equity","tag-expert-consensus-prices","tag-financial-close","tag-financial-product-advice","tag-financing","tag-higher-grade-products","tag-imara","tag-imara-resources","tag-independent-advice","tag-its-16-free-carried-stake","tag-its-binding-subscription-agreement","tag-its-us40m-equity-subscription","tag-january-31","tag-lionhead-capital-advisors","tag-mahenge","tag-mahenge-funding","tag-mahenge-funding-plan","tag-management-and-majority-ownership","tag-managing-director-john-de-vries","tag-markets","tag-mining","tag-module-1-fines","tag-module-1-funding","tag-module-1-funding-requirement","tag-more-than-35","tag-non-binding-project-level-investment","tag-november","tag-november-30","tag-other-conditions","tag-other-products","tag-our-timetable","tag-pace","tag-posco","tag-posco-international","tag-posco-prepayment-facility","tag-premiums","tag-project-financing-acm","tag-publishing","tag-raise-size","tag-satisfaction","tag-shanghai-metals-market","tag-shareholder-approval","tag-south-africa","tag-special-report","tag-supply","tag-tanzania","tag-tgc","tag-that-outlook","tag-that-remaining-equity","tag-that-share","tag-the-2024-agreement","tag-the-acm-investment","tag-the-announcement","tag-the-balance","tag-the-current-deadline","tag-the-distribution","tag-the-equity-raise","tag-the-final-issue-price","tag-the-finish-line","tag-the-first","tag-the-funding-plan","tag-the-international-energy-agency","tag-the-investment","tag-the-posco-equity-subscription","tag-the-price","tag-the-project","tag-the-proposed-acm-investment","tag-the-proposed-us70m-acm-investment","tag-the-roughly-us298m-requirement","tag-the-same-time","tag-the-second","tag-the-strategic-partner","tag-the-subscription","tag-the-time","tag-the-trust","tag-the-us204m-facilities-package","tag-the-us40m-posco-subscription","tag-this-article","tag-top-1-5-terawatt-hours","tag-total-graphitic-carbon","tag-two-tranches","tag-us258m","tag-us360","tag-us40m","tag-us70m","tag-vat"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/230826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/comments?post=230826"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/posts\/230826\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media\/230827"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/media?parent=230826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/categories?post=230826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/korea\/wp-json\/wp\/v2\/tags?post=230826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}