{"id":217030,"date":"2026-06-30T12:48:13","date_gmt":"2026-06-30T12:48:13","guid":{"rendered":"https:\/\/www.europesays.com\/lt\/217030\/"},"modified":"2026-06-30T12:48:13","modified_gmt":"2026-06-30T12:48:13","slug":"atvira-klaipeda-priimtas-teigiamas-sprendimas-del-jurinio-vejo-parko-poveikio-aplinkai","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lt\/217030\/","title":{"rendered":"Atvira Klaip\u0117da | Priimtas teigiamas sprendimas d\u0117l j\u016brinio v\u0117jo parko poveikio aplinkai"},"content":{"rendered":"<tr>\n<td><img loading=\"lazy\" alt=\"Avatar photo\" src=\"https:\/\/www.europesays.com\/lt\/wp-content\/uploads\/2026\/06\/1782718928_561_cropped-cropped-atviraklaipeda.lt_vertical-1-e1507878117309-100x100.png\"  class=\"avatar avatar-100 photo\" height=\"100\" width=\"100\" decoding=\"async\"\/><\/td>\n<td><a href=\"https:\/\/www.atviraklaipeda.lt\/author\/andrej\/\" rel=\"nofollow noopener\" target=\"_blank\">Atvira Klaip\u0117da<br \/>2026-06-30<\/td>\n<\/tr>\n<p>Tarptautin\u0117 \u017ealiosios energetikos bendrov\u0117 \u201eIgnitis renewables\u201c pasiek\u0117 dar vien\u0105 svarb\u0173 etap\u0105 vystant j\u016brinio v\u0117jo park\u0105 \u201eCuronian Nord\u201c. Aplinkos apsaugos agent\u016bra pri\u0117m\u0117 teigiam\u0105 sprendim\u0105 d\u0117l projekto poveikio aplinkai, patvirtindama, kad projektas gali b\u016bti \u012fgyvendinamas laikantis sprendime nustatyt\u0173 numatomo poveikio ma\u017einimo priemoni\u0173.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" width=\"960\" height=\"640\" src=\"https:\/\/www.europesays.com\/lt\/wp-content\/uploads\/2026\/06\/700-MW-galios-elektriniu-parkas-uztikrintu-iki-ketvirtadalio-Lietuvos-elektros-energijos-poreikio_Sh.jpeg\" alt=\"V\u0117jo j\u0117gain\u0117\" class=\"wp-image-275293\"  \/>Asociatyvi Shutterstock.com nuotr.<\/p>\n<p>Poveikio aplinkai vertinimo (PAV) ataskaita buvo parengta laikantis Lietuvos Respublikos teis\u0117s akt\u0173 ir tarptautini\u0173 standart\u0173. Jos tikslas \u2013 \u012fvertinti galim\u0105 poveik\u012f j\u016bros ekosistemai, biologinei \u012fvairovei, kra\u0161tovaizd\u017eiui, \u017evejybai, visuomen\u0117s sveikatai ir kitiems gamtiniams ir socialiniams faktoriams.<\/p>\n<p>\u201eTeigiamas sprendimas yra svarbus \u201eCuronian Nord\u201c projekto etapas. Jis patvirtina, kad po i\u0161sami\u0173 aplinkosaugini\u0173 tyrim\u0173, aktyvaus dialogo su suinteresuotosiomis \u0161alimis ir glaudaus bendradarbiavimo su atsakingomis institucijomis projektas gali b\u016bti toliau vystomas u\u017etikrinant auk\u0161tus aplinkosaugos standartus. Vertiname vis\u0173, prisid\u0117jusi\u0173 prie \u0161io proceso, ind\u0117l\u012f\u201c, \u2013 sako \u201eCuronian Nord\u201c projekto vadov\u0117 Anne Marie Roikj\u00e6r.<\/p>\n<p>PAV proceso metu buvo atlikti i\u0161sam\u016bs aplinkosauginiai tyrimai, aktyviai bendradarbiauta su vietos bendruomen\u0117mis ir kitomis suinteresuotosiomis \u0161alimis bei glaud\u017eiai dirbta su atsakingomis institucijomis, siekiant u\u017etikrinti, kad projektas atitikt\u0173 nacionalinius ir tarptautinius reikalavimus.<\/p>\n<p>Sprendime numatytas i\u0161samus poveikio ma\u017einimo priemoni\u0173 ir s\u0105lyg\u0173 rinkinys, paremtas PAV proceso metu \u012fvertintomis ir suplanuotomis poveikio ma\u017einimo priemon\u0117mis. Jos pad\u0117s ma\u017einti galim\u0105 poveik\u012f biologinei \u012fvairovei ir j\u016bros ekosistemoms tiek v\u0117jo parko statyb\u0173, tiek eksploatacijos metu, u\u017etikrinant ilgalaik\u0119 aplinkos steb\u0117sen\u0105 ir taikant adaptyvaus valdymo principus.<\/p>\n<p>Planuojama, kad \u201eCuronian Nord\u201c v\u0117jo parkas u\u017eims apie 120 kvadratini\u0173 kilometr\u0173 teritorijos Baltijos j\u016broje ir bus nutol\u0119s bent 37 km nuo Lietuvos pakrant\u0117s. Skai\u010diuojama, kad 700 megavat\u0173 (MW) galios v\u0117jo parkas gal\u0117t\u0173 per metus pagaminti apie 3 teravatvalandes (TWh) \u017ealiosios elektros energijos.<\/p>\n<p>Teigiamas projekto poveikio aplinkai vertinimo sprendimas suteikia b\u016btin\u0105 aplinkosaugin\u012f pagrind\u0105 tolesniems projekto vystymo ir leidim\u0173 gavimo procesams bei priartina did\u017eiausi\u0105 Lietuvoje v\u0117jo projekt\u0105 prie \u012fgyvendinimo. Gavus \u0161\u012f sprendim\u0105 ir vadovaujantis leidimo pl\u0117trai nustatytais reikalavimais, projektas bus t\u0119siamas atliekant likusius pl\u0117tros darbus ir leidim\u0173 gavimo procesus, b\u016btinus siekiant gauti statybos leidim\u0105, kurio tikimasi 2027 metais.<\/p>\n<p>Parengta pagal prane\u0161im\u0105 spaudai<\/p>\n<p>\u017dymos: <a href=\"https:\/\/www.atviraklaipeda.lt\/zyma\/curonian-nord-2\/\" rel=\"tag nofollow noopener\" target=\"_blank\">\u201eCuronian Nord\u201c<\/a> | <a href=\"https:\/\/www.atviraklaipeda.lt\/zyma\/ignitis-renewables-2\/\" rel=\"tag nofollow noopener\" target=\"_blank\">\u201eIgnitis renewables\u201c<\/a> | <a href=\"https:\/\/www.atviraklaipeda.lt\/zyma\/anne-marie-roikjaer-2\/\" rel=\"tag nofollow noopener\" target=\"_blank\">Anne Marie Roikj\u00e6r<\/a> | <a href=\"https:\/\/www.atviraklaipeda.lt\/zyma\/jurinio-vejo-parkas\/\" rel=\"tag nofollow noopener\" target=\"_blank\">J\u016brinio v\u0117jo parkas<\/a> | <a href=\"https:\/\/www.atviraklaipeda.lt\/zyma\/pav\/\" rel=\"tag nofollow noopener\" target=\"_blank\">PAV<\/a><\/p>\n<p>\tPrane\u0161ti apie klaid\u0105  <br \/>PANA\u0160\u016aS STRAIPSNIAI<\/p>\n","protected":false},"excerpt":{"rendered":"Atvira Klaip\u0117da2026-06-30 Tarptautin\u0117 \u017ealiosios energetikos bendrov\u0117 \u201eIgnitis renewables\u201c pasiek\u0117 dar vien\u0105 svarb\u0173 etap\u0105 vystant j\u016brinio v\u0117jo park\u0105 \u201eCuronian&hellip;\n","protected":false},"author":2,"featured_media":217031,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[17],"tags":[32844,32845,81,7236,32846,37,39,36,38,40,29566,46],"class_list":["post-217030","post","type-post","status-publish","format-standard","has-post-thumbnail","category-verslas","tag-curonian-nord","tag-anne-marie-roikjaer","tag-business","tag-ignitis-renewables","tag-jurinio-vejo-parkas","tag-lietuva","tag-lietuviu","tag-lithuania","tag-lithuanian","tag-lt","tag-pav","tag-verslas"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lt\/116839141363032730","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/posts\/217030","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/comments?post=217030"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/posts\/217030\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/media\/217031"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/media?parent=217030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/categories?post=217030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/tags?post=217030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}