{"id":230311,"date":"2026-07-16T14:41:11","date_gmt":"2026-07-16T14:41:11","guid":{"rendered":"https:\/\/www.europesays.com\/lt\/230311\/"},"modified":"2026-07-16T14:41:11","modified_gmt":"2026-07-16T14:41:11","slug":"litgrid-prie-tinklo-prijungtas-40-mw-saules-elektriniu-parkas-kaisiadoriu-rajone","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lt\/230311\/","title":{"rendered":"\u201eLitgrid\u201c: prie tinklo prijungtas 40 MW saul\u0117s elektrini\u0173 parkas Kai\u0161iadori\u0173 rajone"},"content":{"rendered":"<p>Kaip ketvirtadien\u012f prane\u0161\u0117 bendrov\u0117, parko leistina generuoti galia siekia 40 megavat\u0173 (MW), o instaliuota galia \u2013 50 MW.<\/p>\n<p>\u201eSaul\u0117s elektrini\u0173 parko transformatori\u0173 pastot\u0117 jau prijungta prie elektros perdavimo tinklo \u2013 parkas prad\u0117jo generuoti pirm\u0105j\u0105 elektros energij\u0105. Kartu tai rodo, kad nepaisant didel\u0117s atsinaujinan\u010di\u0173 i\u0161tekli\u0173 pl\u0117tros, su vystytojais ir toliau esame pasireng\u0119 integruoti naujus atsinaujinan\u010dios energijos gamybos paj\u0117gumus\u201c, \u2013 prane\u0161ime teigia \u201eLitgrid\u201c Atsinaujinan\u010di\u0173 i\u0161tekli\u0173 centro laikinasis vadovas Ignas Mickevi\u010dius.<\/p>\n<p>Anot bendrov\u0117s, saul\u0117s elektrini\u0173 parkas jau gamina elektros energij\u0105 bandomuoju re\u017eimu ir tiekia j\u0105 \u012f perdavimo tinkl\u0105.<\/p>\n<p>I\u0161 viso Lietuvoje \u0161iuo metu instaliuota vir\u0161 3,5 t\u016bkst. MW galios saul\u0117s elektrini\u0173. <\/p>\n<p>Per \u0161i\u0173 met\u0173 pirm\u0105j\u012f pusmet\u012f \u0161alyje veikian\u010di\u0173 atsinaujinan\u010di\u0173 i\u0161tekli\u0173 elektrini\u0173 gamyba sudar\u0117 68 proc. visos Lietuvoje pagamintos elektros energijos ir u\u017etikrino 50 proc. \u0161alies elektros poreikio.<\/p>\n","protected":false},"excerpt":{"rendered":"Kaip ketvirtadien\u012f prane\u0161\u0117 bendrov\u0117, parko leistina generuoti galia siekia 40 megavat\u0173 (MW), o instaliuota galia \u2013 50 MW.&hellip;\n","protected":false},"author":2,"featured_media":230312,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[17],"tags":[3827,81,10020,37,39,3251,36,38,40,11525,46],"class_list":["post-230311","post","type-post","status-publish","format-standard","has-post-thumbnail","category-verslas","tag-atsinaujinanti-energetika","tag-business","tag-kaisiadoriu-rajonas","tag-lietuva","tag-lietuviu","tag-litgrid","tag-lithuania","tag-lithuanian","tag-lt","tag-saules-elektrine","tag-verslas"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lt\/116930182180671927","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/posts\/230311","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/comments?post=230311"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/posts\/230311\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/media\/230312"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/media?parent=230311"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/categories?post=230311"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lt\/wp-json\/wp\/v2\/tags?post=230311"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}