{"id":112695,"date":"2026-01-24T22:07:06","date_gmt":"2026-01-24T22:07:06","guid":{"rendered":"https:\/\/www.europesays.com\/lv\/112695\/"},"modified":"2026-01-24T22:07:06","modified_gmt":"2026-01-24T22:07:06","slug":"meta-klust-par-vesture-lielako-atomenergijas-pirceju-asv-lai-nodrosinatu-mi-datu-centru-energiju-lente-lv","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lv\/112695\/","title":{"rendered":"\u201cMeta\u201d k\u013c\u016bst par v\u0113stur\u0113 liel\u0101ko atomener\u0123ijas pirc\u0113ju ASV, lai nodro\u0161in\u0101tu MI datu centru ener\u0123iju\u00a0\u2014\u00a0Lente.lv"},"content":{"rendered":"<p>\u201cMeta\u201d nosl\u0113dz v\u0113rien\u012bgus atomener\u0123ijas l\u012bgumus ar \u201cTerraPower\u201d, \u201cOklo\u201d un \u201cVistra\u201d<\/p>\n<p>Tehnolo\u0123iju gigants \u201cMeta Platforms\u201d ir pan\u0101cis vieno\u0161anos par v\u0113sturiski liel\u0101ko korporat\u012bvo atomener\u0123ijas iepirkumu Amerikas Savotaj\u0101s Valst\u012bs, nosl\u0113dzot l\u012bgumus ar trim vado\u0161ajiem pieg\u0101d\u0101t\u0101jiem: \u201cTerraPower\u201d, \u201cOklo\u201d un \u201cVistra\u201d. \u0160ie dar\u012bjumi paredz l\u012bdz 6,6 gigavatiem (GW) jaunas un eso\u0161\u0101s ener\u0123ijas pieg\u0101di n\u0101kamo 20 gadu laik\u0101, galvenok\u0101rt atbalstot \u201cMeta\u201d ambiciozo m\u0101ksl\u012bg\u0101 intelekta (MI) vad\u012bto datu centru papla\u0161in\u0101\u0161anu. K\u0101 inform\u0113 port\u0101ls NRA, \u0161\u012b strat\u0113\u0123isk\u0101 invest\u012bcija ir da\u013ca no \u201cMeta\u201d pla\u0161\u0101kas pieejas da\u017e\u0101du t\u012bras ener\u0123ijas tehnolo\u0123iju atbalst\u012b\u0161anai, cen\u0161oties nodro\u0161in\u0101t stabilu un ilgtsp\u0113j\u012bgu ener\u0123ijas avotu sav\u0101m arvien pieaugo\u0161aj\u0101m ener\u0123ijas vajadz\u012bb\u0101m. \u0160ie l\u012bgumi ir noz\u012bm\u012bgs solis ne tikai \u201cMeta\u201d darb\u012bb\u0101, bet ar\u012b ASV atomener\u0123\u0113tikas nozar\u0113, veicinot gan eso\u0161o objektu moderniz\u0101ciju, gan jaunu, progres\u012bvu reaktoru projektu att\u012bst\u012bbu.<\/p>\n<p>Detaliz\u0113ta vieno\u0161an\u0101s un projekti<\/p>\n<p>Vieno\u0161an\u0101s ar \u201cTerraPower\u201d paredz finans\u0113jumu l\u012bdz pat asto\u0146u Natrium tipa moderno atomreaktoru izstr\u0101dei, kas sp\u0113tu nodro\u0161in\u0101t aptuveni 690 megavatus (MW) jaudas l\u012bdz 2032. gadam, ar iesp\u0113ju kop\u0113jo jaudu l\u012bdz 2035. gadam palielin\u0101t l\u012bdz aptuveni 2,8 GW. \u0160ie reaktori, ko izstr\u0101d\u0101jis Bils Geits atbalst\u012btais uz\u0146\u0113mums, ir apr\u012bkoti ar uzlabotu s\u0101ls\u016bdens ener\u0123ijas uzglab\u0101\u0161anas sist\u0113mu, kas var palielin\u0101t sist\u0113mas jaudu l\u012bdz 500 MW. Savuk\u0101rt sadarb\u012bb\u0101 ar \u201cOklo\u201d paredz\u0113ts izveidot jaunu atomener\u0123ijas objektu Painsvilas apgabal\u0101, Ohaio \u0161tat\u0101, kas l\u012bdz 2030. gadam var\u0113tu nodro\u0161in\u0101t l\u012bdz 1,2 GW jaudas. \u201cMeta\u201d ir ar\u012b nosl\u0113dzis 20 gadu l\u012bgumus ar \u201cVistra\u201d par vair\u0101k nek\u0101 2,1 GW elektroener\u0123ijas iepirk\u0161anu no eso\u0161ajiem atomreaktoriem Ohaio un Pensilv\u0101nijas \u0161tat\u0101, k\u0101 ar\u012b atbalsta eso\u0161o reaktoru moderniz\u0101ciju, kas pievienos v\u0113l 433 MW jaudas. \u0160ie l\u012bgumi kopum\u0101 veido l\u012bdz 6,6 GW jaudas, ko paredz\u0113ts nodro\u0161in\u0101t l\u012bdz 2035. gadam.<\/p>\n<p>MI att\u012bst\u012bbas ener\u0123ijas pras\u012bbas<\/p>\n<p>Strauj\u0101 m\u0101ksl\u012bg\u0101 intelekta tehnolo\u0123iju att\u012bst\u012bba rada nepieredz\u0113tu piepras\u012bjumu p\u0113c elektroener\u0123ijas. Lai gan viena ChatGPT vaic\u0101juma ener\u0123ijas pat\u0113ri\u0146\u0161 ir iev\u0113rojami liel\u0101ks nek\u0101 tradicion\u0101lie interneta mekl\u0113jumi, glob\u0101lais datu centru elektroener\u0123ijas piepras\u012bjums l\u012bdz 2030. gadam tiek prognoz\u0113ts pieaugs par 160%. \u0160\u012bs tendences liecina par nopietn\u0101m ba\u017e\u0101m par energoapg\u0101des dro\u0161\u012bbu un infrastrukt\u016bras att\u012bst\u012bbu. Gartner prognoz\u0113, ka l\u012bdz 2027. gadam 40% eso\u0161o MI datu centru var saskarties ar darb\u012bbas gr\u016bt\u012bb\u0101m nepietiekamas baro\u0161anas d\u0113\u013c. Tie\u0161i \u0161\u012b iemesla d\u0113\u013c t\u0101di tehnolo\u0123iju giganti k\u0101 \u201cGoogle\u201d, \u201cMicrosoft\u201d, \u201cAmazon\u201d un \u201cMeta\u201d akt\u012bvi invest\u0113 kodolener\u0123ijas objektos, cen\u0161oties nodro\u0161in\u0101t savu datu centru nep\u0101rtrauktu darb\u012bbu un att\u012bst\u012bbu.<\/p>\n<p>Atomener\u0123ijas noz\u012bme un n\u0101kotnes perspekt\u012bvas<\/p>\n<p>\u201cMeta\u201d strat\u0113\u0123isk\u0101 pieeja ener\u0123ijas nodro\u0161in\u0101\u0161an\u0101, iesaistoties atomener\u0123ijas projektos, uzsver \u0161\u012bs t\u012br\u0101s ener\u0123ijas avota noz\u012bmi m\u016bsdienu tehnolo\u0123iju laikmet\u0101. Atomener\u0123ija pied\u0101v\u0101 stabilu, zemu oglek\u013ca izme\u0161u ener\u0123ijas avotu, kas sp\u0113j apmierin\u0101t lielo datu centru un MI apr\u0113\u0137inu nep\u0101rtraukto vajadz\u012bbu. K\u0101 nor\u0101d\u012bjis \u201cMeta\u201d galvenais glob\u0101lo lietu speci\u0101lists D\u017eoels Kaplans, \u0161ie l\u012bgumi pal\u012bdz\u0113s ASV \u201cuzvar\u0113t\u201d MI sac\u012bkst\u0113s pret \u0136\u012bnu, vienlaikus nodro\u0161inot darba vietas un veicinot ekonomisko izaugsmi. \u0160is solis ne tikai stiprina \u201cMeta\u201d poz\u012bcijas tehnolo\u0123iju tirg\u016b, bet ar\u012b sniedz ieguld\u012bjumu valsts ener\u0123\u0113tiskaj\u0101 neatkar\u012bb\u0101 un dro\u0161\u012bb\u0101, vienlaikus veicinot modernu atomreaktoru tehnolo\u0123iju izstr\u0101di.<\/p>\n","protected":false},"excerpt":{"rendered":"\u201cMeta\u201d nosl\u0113dz v\u0113rien\u012bgus atomener\u0123ijas l\u012bgumus ar \u201cTerraPower\u201d, \u201cOklo\u201d un \u201cVistra\u201d Tehnolo\u0123iju gigants \u201cMeta Platforms\u201d ir pan\u0101cis vieno\u0161anos par&hellip;\n","protected":false},"author":2,"featured_media":112696,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[26377,77,76,769,35,39,38,36,37,34,40,87,26376,26378],"class_list":{"0":"post-112695","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bizness","8":"tag-atomenergija","9":"tag-bizness","10":"tag-business","11":"tag-datu-centri","12":"tag-latvia","13":"tag-latvian","14":"tag-latviesu","15":"tag-latviesu-valoda","16":"tag-latviesuvaloda","17":"tag-latvija","18":"tag-lv","19":"tag-maksligais-intelekts","20":"tag-meta-platforms","21":"tag-terrapower"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lv\/115952356094772934","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/112695","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/comments?post=112695"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/112695\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media\/112696"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media?parent=112695"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/categories?post=112695"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/tags?post=112695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}