{"id":133312,"date":"2026-02-17T14:37:10","date_gmt":"2026-02-17T14:37:10","guid":{"rendered":"https:\/\/www.europesays.com\/lv\/133312\/"},"modified":"2026-02-17T14:37:10","modified_gmt":"2026-02-17T14:37:10","slug":"igaunija-sakas-lielaka-saules-energijas-hibridprojekta-izveide-uzladets","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lv\/133312\/","title":{"rendered":"Igaunij\u0101 s\u0101kas liel\u0101k\u0101 saules ener\u0123ijas hibr\u012bdprojekta izveide \u2013 Uzl\u0101d\u0113ts"},"content":{"rendered":"<p>\u201cNatixis Investment Managers\u201d meitasuz\u0146\u0113mums \u201cMirova\u201d, kas specializ\u0113jas ilgtsp\u0113j\u012bg\u0101s invest\u012bcij\u0101s, un \u201cEvecon\u201d pazi\u0146oju\u0161i par virkni noz\u012bm\u012bgu sasniegumu, kas veicin\u0101s Igaunijas ener\u0123\u0113tikas sist\u0113mas transform\u0101ciju, izmantojot vi\u0146iem piedero\u0161o \u201cBaltic Renewable Energy Platform O\u00dc\u201d (\u201cBREP\u201d). Jaun\u0101kie sasniegumi demonstr\u0113, k\u0101 atjaunojam\u0101s elektroener\u0123ijas ra\u017eo\u0161anas apvieno\u0161ana ar ener\u0123ijas uzkr\u0101\u0161anas sist\u0113m\u0101m un ilgtermi\u0146a optimiz\u0101cijas r\u012bkiem var palielin\u0101t Baltijas ener\u0123\u0113tikas tirgus pievilc\u012bbu un ilgtermi\u0146\u0101 veicin\u0101t Igaunijas ener\u0123\u0113tisko neatkar\u012bbu.<\/p>\n<p>Kirikm\u0113 saules elektrostacijas hibridiz\u0101cija ar bateriju sist\u0113mu<\/p>\n<p>2024. gada oktobr\u012b ekspluat\u0101cij\u0101 nodot\u0101 Kirikm\u0113 saules elektrostacija tiks papildin\u0101ta ar 55 MW \/ 250 MWh BESS (bateriju ener\u0123ijas uzkr\u0101\u0161anas sist\u0113mu), kuras izb\u016bve s\u0101k\u0101s 2026. gada janv\u0101r\u012b. \u201cWiSo Engineering\u201d ir EPC apak\u0161uz\u0146\u0113m\u0113js, kas atbild par visas infrastrukt\u016bras un sist\u0113mu integr\u0101ciju. Baterijas, jaudas p\u0101rveido\u0161anas iek\u0101rtas un vid\u0113j\u0101 sprieguma komponentes pieg\u0101d\u0101 \u201cHuawei\u201d.<\/p>\n<p>Hibr\u012bd\u200crisin\u0101jumam s\u0101kot darboties (provizoriski 2026. gada 3.\u20134. ceturksn\u012b), tas \u013caus BREP uzkr\u0101t sara\u017eoto saules ener\u0123iju un nodro\u0161in\u0101t t\u012bkla stabilit\u0101tes pakalpojumus, tostarp frekvences notur\u0113\u0161anas rezervi (FCR), autom\u0101tisko frekvences atjauno\u0161anas rezervi (aFRR) un manu\u0101lo frekvences atjauno\u0161anas rezervi (mFRR).<\/p>\n<p><a href=\"https:\/\/uzladets.lv\/lidlitis260216\" target=\"_blank\" rel=\"nofollow noopener\"><img decoding=\"async\" src=\"https:\/\/www.europesays.com\/lv\/wp-content\/uploads\/2026\/02\/932x300_uzladets.png\"\/><\/a><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.europesays.com\/lv\/wp-content\/uploads\/2026\/02\/1771339030_476_.gif\" border=\"0\" width=\"1\" height=\"1\"\/><\/p>\n<p>\u0160\u0101di pakalpojumi ir \u0101rk\u0101rt\u012bgi svar\u012bgi Baltijas valst\u012bm, p\u0101rejot uz autonom\u0101ku un uz atjaunojamiem resursiem vair\u0101k balst\u012btu elektroener\u0123ijas sist\u0113mu p\u0113c atsl\u0113g\u0161an\u0101s no BRELL (Baltkrievija\u2013Krievija\u2013Igaunija\u2013Latvija\u2013Lietuva) t\u012bkla.<\/p>\n<p>Pirmais elast\u012bbas un elektroener\u0123ijas pirkuma l\u012bgums Baltijas valst\u012bs<\/p>\n<p>BREP 2026. gada janv\u0101r\u012b nosl\u0113dza 10 gadu elast\u012bbas un elektroener\u0123ijas pirkuma l\u012bgumu (FPPA), kas atjaunojam\u0101s elektroener\u0123ijas p\u0101rdo\u0161anu un elast\u012bbas optimiz\u0101ciju ingegr\u0113 ar \u201cPure Energy\u201d. Saska\u0146\u0101 ar l\u012bgumu \u201cPure Energy\u201d ieg\u0101d\u0101sies un optimiz\u0113s BREP Igaunijas saules ener\u0123ijas ieguves un uzkr\u0101\u0161anas (solar + storage) portfe\u013ca kop\u0113jo atjaunojam\u0101s ra\u017eo\u0161anas un elast\u012bbas jaudu.<\/p>\n<p>L\u012bgums aptver visu BREP portfeli: Kirikm\u0113 hibr\u012bdparku (ar 77,5 MWp saules PV + 55 MW \/ 250 MWh BESS), Imaveres saules sp\u0113kstaciju (15,5 MWp saules PV) un Lohumetsas sp\u0113kstaciju (12,8 MWp saules PV).<\/p>\n<p>\u0160\u012b strukt\u016bra, ko nodro\u0161ina invest\u012bciju l\u012bme\u0146a garantijas, ievie\u0161 jaunu komerci\u0101lo modeli hibr\u012bdprojektiem, kuros apvienota atjaunojam\u0101s ener\u0123ijas ieguve un elektroener\u0123ijas uzkr\u0101\u0161ana Baltijas un Zieme\u013cvalst\u012bs, vienlaikus veicinot main\u012bg\u0101s atjaunojam\u0101s ener\u0123ijas ilgtermi\u0146a integr\u0101ciju elektroener\u0123ijas t\u012bkl\u0101.<\/p>\n<p>Jauns ilgtermi\u0146a finans\u0113\u0161anas instruments<\/p>\n<p>\u201cSwedbank\u201d, kas BREP atbalsta jau kop\u0161 2023. gada, ir pie\u0161\u0137\u012brusi jaunu 85 miljonu eiro ilgtermi\u0146a finans\u0113jumu. Finans\u0113juma pakete paredz eso\u0161\u0101 saules elektrostaciju portfe\u013ca refinans\u0113\u0161anu, Kirikm\u0113 ener\u0123ijas uzkr\u0101\u0161anas sist\u0113mas (BESS) izb\u016bvi, k\u0101 ar\u012b vair\u0101kas papildu kred\u012btl\u012bnijas, tostarp PVN finans\u0113\u0161anas instrumentu, akredit\u012bvu (Letter of Credit) un par\u0101da apkalpo\u0161anas rezerves kontu (DSRA).<\/p>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>55 MW BESS izb\u016bve, kas pal\u012bdz\u0113s izveidot liel\u0101ko hibr\u012bdstaciju Baltij\u0101, k\u0101 ar\u012b pirm\u0101 ilgtermi\u0146a FPPA l\u012bguma nosl\u0113g\u0161ana spilgti par\u0101da, k\u0101 inov\u0101cijas var pa\u0101trin\u0101t atjaunojam\u0101s ener\u0123ijas un uzkr\u0101\u0161anas risin\u0101jumu integr\u0101ciju Eiropas elektroener\u0123ijas sist\u0113m\u0101s. Atbalstot inovat\u012bvu hibr\u012bdinfrastrukt\u016bru att\u012bst\u012bbu, \u201cMirova\u201d pal\u012bdz main\u012bt veidu, k\u0101 tiek ra\u017eota, uzkr\u0101ta un nov\u0113rt\u0113ta t\u012br\u0101 ener\u0123ija. Laik\u0101, kad Eiropas ener\u0123\u0113tisk\u0101 suverenit\u0101te ir k\u013cuvusi par strat\u0113\u0123isku priorit\u0101ti, ieguld\u012bjumi akt\u012bvos, kas viet\u0113j\u0101 m\u0113rog\u0101 stiprina sp\u0113ju p\u0101rvar\u0113t izaicin\u0101jumus, ir gan vides dikt\u0113ta nepiecie\u0161am\u012bba, gan ekonomiska vajadz\u012bba. M\u0113s lepojamies, ka \u0161o redz\u0113jumu \u012bstenojam kop\u0101 ar \u201cEvecon\u201d un m\u016bsu partneriem Baltij\u0101.<\/p>\n<p>Rafaels Lenss, \u201cMirova\u201d priv\u0101to akt\u012bvu glob\u0101lais vad\u012bt\u0101js<\/p><\/blockquote>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Kirikm\u0113 saules PV hibridiz\u0101cija un FPPA ievie\u0161ana demonstr\u0113, k\u0101 inovat\u012bvas strukt\u016bras, sp\u0113c\u012bgas partner\u012bbas un augsti tehniskie standarti var veidot Igaunijas elektroener\u0123ijas sist\u0113mas n\u0101kotni. \u201cEvecon\u201d ir saj\u016bsm\u0101, ka partner\u012bba, kas uzs\u0101kta ar MET5 caur BREP, nes aug\u013cus un stiprina Igaunijas elektroener\u0123ijas tirgu gan ar saules ener\u0123ijas ra\u017eo\u0161anu, gan elast\u012bbu.<\/p>\n<p>Karls J\u016bnatans Kvells, \u201cEvecon\u201d izpilddirektors<\/p><\/blockquote>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>Pirm\u0101 \u0161\u0101da veida FPPA parakst\u012b\u0161ana Baltijas valst\u012bs iez\u012bm\u0113 ilgtermi\u0146a partner\u012bbas s\u0101kumu ar BREP, MET5 un \u201cEvecon\u201d. Tas atspogu\u013co \u201cPure Energy\u201d darba pamat\u012bgumu un p\u0101rvald\u012bbas prasmes, kas nepiecie\u0161amas \u0161\u0101d\u0101m ilgtermi\u0146a strukt\u016br\u0101m. M\u0113s lepojamies, ka varam veicin\u0101t ener\u0123\u0113tisko p\u0101reju, kas stiprin\u0101s gan atjaunojam\u0101s ener\u0123ijas ra\u017eo\u0161anu, gan elast\u012bbu Baltijas valst\u012bs.<\/p>\n<p>Servets Akg\u016bns, \u201cPure Energy GmbH\u201d dibin\u0101t\u0101js<\/p><\/blockquote>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>\u201cSwedbank\u201d ir gandar\u012bta turpin\u0101t partner\u012bbu ar MET5 un \u201cEvecon\u201d n\u0101kamaj\u0101 BREP att\u012bst\u012bbas f\u0101z\u0113. FPPA l\u012bguma struktur\u0113to pieeju un BREP iesaist\u012bto pu\u0161u augstos standartus v\u0113rt\u0113jam \u013coti augstu un lepojamies, ka varam sniegt ieguld\u012bjumu kvalitat\u012bvu atjaunojam\u0101s ener\u0123ijas un sist\u0113mas elast\u012bbas akt\u012bvu izveid\u0113 Baltijas valst\u012bs.<\/p>\n<p>Mihkels Uts, \u201cSwedbank Estonia\u201d lielo korporat\u012bvo klientu vad\u012bt\u0101js<\/p><\/blockquote>\n<p><a href=\"https:\/\/mistape.com\" target=\"_blank\" rel=\"nofollow noopener\" class=\"mistape-link mistape-logo\"><\/a><\/p>\n<p>Ja rakst\u0101 paman\u012bji k\u013c\u016bdu, padod mums par to zi\u0146u, iez\u012bm\u0113jot a\u010dg\u0101rno tekstu un nospie\u017eot Ctrl+Enter. Paldies!<\/p>\n<p>&#13;<br \/>\n                    0&#13;<br \/>\n                    0&#13;<br \/>\n                    balsojumi<\/p>\n<p>Raksta nov\u0113rt\u0113jums<\/p>\n<p>\t\tPost navigation<\/p>\n","protected":false},"excerpt":{"rendered":"\u201cNatixis Investment Managers\u201d meitasuz\u0146\u0113mums \u201cMirova\u201d, kas specializ\u0113jas ilgtsp\u0113j\u012bg\u0101s invest\u012bcij\u0101s, un \u201cEvecon\u201d pazi\u0146oju\u0161i par virkni noz\u012bm\u012bgu sasniegumu, kas veicin\u0101s&hellip;\n","protected":false},"author":2,"featured_media":133313,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[16],"tags":[8584,8585,77,29579,76,29580,73,29581,35,39,38,36,37,34,40,29582,8586,6056],"class_list":["post-133312","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bizness","tag-aer","tag-bess","tag-bizness","tag-brep","tag-business","tag-evecon","tag-igaunija","tag-kirikme","tag-latvia","tag-latvian","tag-latviesu","tag-latviesu-valoda","tag-latviesuvaloda","tag-latvija","tag-lv","tag-mirova","tag-saules-paneli","tag-swedbank"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lv\/116086482055479583","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/133312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/comments?post=133312"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/133312\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media\/133313"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media?parent=133312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/categories?post=133312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/tags?post=133312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}