{"id":173507,"date":"2026-04-07T20:01:07","date_gmt":"2026-04-07T20:01:07","guid":{"rendered":"https:\/\/www.europesays.com\/lv\/173507\/"},"modified":"2026-04-07T20:01:07","modified_gmt":"2026-04-07T20:01:07","slug":"elektribas-cena-latvija-nedelas-laika-pieaug-par-41","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lv\/173507\/","title":{"rendered":"Elektr\u012bbas cena Latvij\u0101 ned\u0113\u013cas laik\u0101 pieaug par 41%"},"content":{"rendered":"<p>Savuk\u0101rt Igaunij\u0101 elektroener\u0123ijas vid\u0113j\u0101 cena pag\u0101ju\u0161aj\u0101 ned\u0113\u013c\u0101 palielin\u0101j\u0101s par 49% un bija 64,28 eiro par MWh, bet Lietuv\u0101 t\u0101 palielin\u0101j\u0101s par 13% &#8211; l\u012bdz 72,88 eiro par MWh.<\/p>\n<p>&#8220;Latvenergo&#8221; nor\u0101da, ka aizvad\u012btaj\u0101 ned\u0113\u013c\u0101 elektroener\u0123ijas vairumtirdzniec\u012bbas cenas pieauga da\u013c\u0101 Zieme\u013cvalstu tirdzniec\u012bbas zonu, k\u0101 ar\u012b Baltijas valst\u012bs.<\/p>\n<p>Cenu k\u0101pumu galvenok\u0101rt noteica zem\u0101ka v\u0113ja elektrostaciju izstr\u0101de un starpsavienojuma jaudas ierobe\u017eojumi ar Zviedrijas ceturto tirdzniec\u012bbas zonu (SE4), kas samazin\u0101ja iesp\u0113jas import\u0113t l\u0113t\u0101ku elektroener\u0123iju periodos ar zem\u0101ku atjaunojamo resursu izstr\u0101di Baltij\u0101.<\/p>\n<p>&#8220;Nord Pool&#8221; sist\u0113mas cena palielin\u0101j\u0101s l\u012bdz 61,97 eiro par MWh, kas ir par 37% vair\u0101k nek\u0101 iepriek\u0161\u0113j\u0101 ned\u0113\u013c\u0101.<\/p>\n<p>Elektroener\u0123ijas cenu at\u0161\u0137ir\u012bbas starp Baltijas valst\u012bm turpin\u0101ja ietekm\u0113t nepietiekam\u0101 starpsavienojumu jauda un papildu p\u0101rvades jaudu ierobe\u017eojumi. Tostarp starpsavienojuma remontdarbi starp Igauniju un Latviju tika pagarin\u0101ti l\u012bdz 8. apr\u012blim, saglab\u0101jot 72 MW jaudas ierobe\u017eojumu.<\/p>\n<p>Elektroener\u0123ijas cenu k\u0101pumu Baltijas valst\u012bs veicin\u0101ja piln\u012bga Lietuvas-Zviedrijas starpsavienojuma (&#8220;NordBalt&#8221;) darb\u012bbas aptur\u0113\u0161ana no 28. marta l\u012bdz 1. apr\u012blim, kad pl\u0101noto remontdarbu d\u0113\u013c pieejam\u0101 p\u0101rvades jauda samazin\u0101j\u0101s no 700 megavatiem (MW) l\u012bdz 0 MW.<\/p>\n","protected":false},"excerpt":{"rendered":"Savuk\u0101rt Igaunij\u0101 elektroener\u0123ijas vid\u0113j\u0101 cena pag\u0101ju\u0161aj\u0101 ned\u0113\u013c\u0101 palielin\u0101j\u0101s par 49% un bija 64,28 eiro par MWh, bet Lietuv\u0101&hellip;\n","protected":false},"author":2,"featured_media":88150,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[23,28,29,3392,3681,32,33,22,30,31,35,39,38,36,37,34,40,20,26,27,24,25,21],"class_list":{"0":"post-173507","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aktualitates","8":"tag-aktualitates","9":"tag-breaking-news","10":"tag-breakingnews","11":"tag-elektriba","12":"tag-elektroenergija","13":"tag-featured-news","14":"tag-featurednews","15":"tag-headlines","16":"tag-latest-news","17":"tag-latestnews","18":"tag-latvia","19":"tag-latvian","20":"tag-latviesu","21":"tag-latviesu-valoda","22":"tag-latviesuvaloda","23":"tag-latvija","24":"tag-lv","25":"tag-news","26":"tag-popularakas-zinas","27":"tag-popularakaszinas","28":"tag-top-stories","29":"tag-topstories","30":"tag-zinas"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lv\/116365209297912753","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/173507","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/comments?post=173507"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/173507\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media\/88150"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media?parent=173507"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/categories?post=173507"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/tags?post=173507"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}