{"id":244690,"date":"2026-07-09T07:34:10","date_gmt":"2026-07-09T07:34:10","guid":{"rendered":"https:\/\/www.europesays.com\/lv\/244690\/"},"modified":"2026-07-09T07:34:10","modified_gmt":"2026-07-09T07:34:10","slug":"igaunija-darbu-sak-100-mw-akumulatoru-parks-viens-no-jaudigakajiem-eiropa-uzladets","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lv\/244690\/","title":{"rendered":"Igaunij\u0101 darbu s\u0101k 100 MW akumulatoru parks \u2013 viens no jaud\u012bg\u0101kajiem Eirop\u0101 \u2013 Uzl\u0101d\u0113ts"},"content":{"rendered":"<p class=\"wp-block-paragraph\">7. j\u016blij\u0101 Igaunij\u0101, Harju apri\u0146\u0137a Arukil\u0101, ofici\u0101li atkl\u0101ta akumulatoru ener\u0123ijas uzkr\u0101\u0161anas sist\u0113ma Hertz 2 ar 100 MW jaudu un 200 MWh ietilp\u012bbu. Kop\u0101 ar febru\u0101r\u012b K\u012bs\u0101 atkl\u0101to Hertz 1 t\u0101s veido vienu no jaud\u012bg\u0101kajiem \u0161\u0101da veida kompleksiem kontinent\u0101laj\u0101 Eirop\u0101 un pal\u012bdz nodro\u0161in\u0101t Baltijas valstu elektrosist\u0113mas stabilit\u0101ti.<\/p>\n<p class=\"wp-block-paragraph\">Tas ir jau otrais lielais Baltic Storage Platform projekts Igaunij\u0101. To p\u0101rvalda re\u0123iona vado\u0161ais atjaun\u012bg\u0101s ener\u0123ijas att\u012bst\u012bt\u0101js Evecon, Francijas elektroener\u0123ijas ra\u017eot\u0101js Corsica Sole un starptautiskais invest\u012bciju fonds Mirova.<\/p>\n<p class=\"wp-block-paragraph\">P\u0113c Hertz 2 pabeig\u0161anas abu akumulatoru parku kop\u0113j\u0101 jauda sasniedz 200 megavatus, bet ietilp\u012bba \u2013 400 megavatstundas, un tas nodro\u0161ina iev\u0113rojamu da\u013cu valsts vajadz\u012bbu p\u0113c akumulatoru ener\u0123ijas uzkr\u0101\u0161anas jaud\u0101m. Arukilas akumulatoru parks ir piesl\u0113gts Elering p\u0101rvald\u012btajam p\u0101rvades t\u012bklam un sniegs pakalpojumus vair\u0101kos elektroener\u0123ijas tirgos.<\/p>\n<p class=\"wp-block-paragraph\">T\u0101 galvenais uzdevums ir nodro\u0161in\u0101t \u0101tru elektrot\u012bkla frekvences regul\u0113\u0161anu. Tas ir \u012bpa\u0161i svar\u012bgi Baltijas elektrosist\u0113mas stabilit\u0101tei kop\u0161 re\u0123iona elektrot\u012bkla sinhroniz\u0101cijas ar kontinent\u0101l\u0101s Eiropas frekvences zonu 2025. gada febru\u0101r\u012b. Sist\u0113ma tiks izmantota ar\u012b n\u0101kam\u0101s dienas un teko\u0161\u0101s dienas elektroener\u0123ijas tirgos.<\/p>\n<p>Liel\u0101kais priv\u0101tais ieguld\u012bjums Igaunijas ener\u0123\u0113tik\u0101<\/p>\n<p class=\"wp-block-paragraph\">Igaunijas ener\u0123\u0113tikas un vides ministrs Andress Suts (Andres Sutt) uzsv\u0113ra, ka Hertz 1 un Hertz 2 projekti ir apliecin\u0101ju\u0161i Igaunijas ener\u0123\u0113tikas nozares pievilc\u012bbu starptautiskajiem investoriem.<\/p>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">\u0100rvalstu invest\u012bcijas ir nenov\u0113rt\u0113jami svar\u012bgas m\u016bsu ekonomikas att\u012bst\u012bbai, t\u0101p\u0113c mums t\u0101s j\u0101sarg\u0101, lai jaunas invest\u012bcijas no draudz\u012bg\u0101m \u0101rvalst\u012bm pie mums non\u0101ktu ar\u012b turpm\u0101k. Vienlaikus Hertz 1 un Hertz 2 projekti ir noz\u012bm\u012bgi visas elektrosist\u0113mas balans\u0113\u0161anai un liel\u0101ka atjaun\u012bg\u0101s elektroener\u0123ijas apjoma non\u0101k\u0161anai tirg\u016b \u2013 tie\u0161i \u0161\u0101das elast\u012bgas jaudas Igaunijai vajadz\u012bgas arvien vair\u0101k laik\u0101, kad Baltijas valstis pa\u0161as uztur savu frekvenci.<\/p>\n<p>Igaunijas ener\u0123\u0113tikas un vides ministrs Andress Suts (Andres Sutt)<\/p><\/blockquote>\n<p class=\"wp-block-paragraph\">Evecon vad\u012bt\u0101js Karls Jonatans Kvells (Karl-Joonatan Kvell) nor\u0101d\u012bja, ka Hertz 1 un Hertz 2 kop\u0101 ir liel\u0101kais priv\u0101t\u0101 sektora ieguld\u012bjums Igaunijas ener\u0123\u0113tik\u0101 \u2013 kopum\u0101 170 miljoni eiro. \u201cTas bija drosm\u012bgs l\u0113mums, ko 2023. gada beig\u0101s pie\u0146\u0113m\u0101m kop\u0101 ar m\u016bsu Francijas partneriem: l\u0113mumu pie\u0146\u0113m\u0101m, nepa\u013caujoties uz subs\u012bdij\u0101m un piln\u012bb\u0101 uz\u0146emoties tirgus riskus,\u201d vi\u0146\u0161 sac\u012bja.<\/p>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">L\u012bdz ar Hertz 2 darb\u012bbas s\u0101kumu komplekss kop\u0101 ar K\u012bsas Hertz 1 str\u0101d\u0101 piln\u0101 apjom\u0101 un pal\u012bdz Baltijas elektrosist\u0113mai uztur\u0113t frekvenci un mazin\u0101t cenu k\u0101pumus.<\/p>\n<p>Evecon vad\u012bt\u0101js Karls Jonatans Kvells (Karl-Joonatan Kvell)<\/p><\/blockquote>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">P\u0113c Hertz 1 pabeig\u0161anas ar\u012b Hertz 2 tika \u012bstenots \u0101tri un raiti, balstoties uz to pa\u0161u tehnisko risin\u0101jumu, \u2013 par to esam pateic\u012bgi saviem partneriem. T\u0101 k\u0101 Baltijas frekvences tirgu apjoms ir ierobe\u017eots, ir svar\u012bgi, lai valsts nodro\u0161in\u0101tu vienl\u012bdz\u012bgus nosac\u012bjumus visiem tirgus dal\u012bbniekiem. Paredzams un god\u012bgs tirgus \u013cauj priv\u0101taj\u0101m invest\u012bcij\u0101m sniegt sist\u0113mai maksim\u0101lu labumu.<\/p>\n<p>Corsica Sole vad\u012bt\u0101js Mikaels Kudiz\u0113 (Michael Coudyser)<\/p><\/blockquote>\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Hertz 2 pabeig\u0161ana ir jauns noz\u012bm\u012bgs posms Mirova ap\u0146\u0113m\u012bb\u0101 finans\u0113t t\u012bro ener\u0123iju Igaunij\u0101. K\u0101 viens no galvenajiem \u0101rvalstu investoriem valst\u012b m\u0113s ticam, ka \u0161\u012b akumulatoru sist\u0113ma pal\u012bdz nodro\u0161in\u0101t energosist\u0113mas stabilit\u0101ti t\u0101s p\u0101rveides laik\u0101, vienlaikus apliecinot, ka Igaunijas ekosist\u0113ma ir gatava \u0161\u0101diem lieliem projektiem.<\/p>\n<p class=\"wp-block-paragraph\">Tagad, kad akumulatori jau darbojas, mums vissvar\u012bg\u0101k\u0101 ir tiesisk\u0101s vides stabilit\u0101te un caurskat\u0101mi darb\u012bbas nosac\u012bjumi, lai investori ar\u012b turpm\u0101k dro\u0161i finans\u0113tu jaunus uz\u0146\u0113mumus un infrastrukt\u016bru.<\/p>\n<p>Mirova priv\u0101to akt\u012bvu vad\u012bt\u0101js Rafaels Lanss (Rapha\u00ebl Lance)<\/p><\/blockquote>\n<p>Elektrot\u012bklu stabiliz\u0113 milisekund\u0113s<\/p>\n<p class=\"wp-block-paragraph\">P\u0113c Baltijas valstu atsl\u0113g\u0161an\u0101s no Krievijas elektrot\u012bkla 2025. gada febru\u0101r\u012b elektrosist\u0113mas frekvence t\u0101m j\u0101uztur pa\u0161\u0101m. \u0160aj\u0101 proces\u0101 noz\u012bm\u012bga loma ir ar\u012b Hertz 2 akumulatoru parkam \u2013 tas rea\u0123\u0113 uz frekvences sv\u0101rst\u012bb\u0101m un citiem neparedz\u0113tiem trauc\u0113jumiem milisekun\u017eu laik\u0101, pal\u012bdzot uztur\u0113t l\u012bdzsvaru starp elektroener\u0123ijas ra\u017eo\u0161anu un pat\u0113ri\u0146u.<\/p>\n<p class=\"wp-block-paragraph\">Liela m\u0113roga akumulatoru uzkr\u0101tuv\u0113m ir arvien noz\u012bm\u012bg\u0101ka loma atjaun\u012bg\u0101s ener\u0123ijas non\u0101k\u0161an\u0101 tirg\u016b un elektroener\u0123ijas cenu sv\u0101rst\u012bbu mazin\u0101\u0161an\u0101. Hertz 2 uzkr\u0101j elektroener\u0123iju tad, kad tirgus cenas ir zemas \u2013 parasti tas noz\u012bm\u0113, ka tobr\u012bd tiek sara\u017eots daudz atjaun\u012bg\u0101s elektroener\u0123ijas, \u2013 un uzkr\u0101to ener\u0123iju atdod t\u012bkl\u0101, kad cenas un piepras\u012bjums ir augsti.<\/p>\n<p class=\"wp-block-paragraph\">T\u0101d\u0113j\u0101di uzkr\u0101tuve gan izmanto atjaun\u012bg\u0101s ener\u0123ijas p\u0101rpalikumu, kas cit\u0101di paliktu neizmantots, gan mazina ekstrem\u0101los cenu k\u0101pumus, ko pat\u0113r\u0113t\u0101ji pieredz\u0113ju\u0161i p\u0113d\u0113jos gados.<\/p>\n<p class=\"wp-block-paragraph\">Net\u0101lu no Tallinas, Arukil\u0101, eso\u0161\u0101 Hertz 2 tehniski ir Hertz 1 kopija. Parks veidots p\u0113c konteineru principa: 54 konteineros uzst\u0101d\u012bti pavisam 2328 akumulatoru modu\u013ci. Katr\u0101 konteiner\u0101 izvietoti akumulatoru stat\u012bvi, dzes\u0113\u0161anas, ugunsdro\u0161\u012bbas un uzraudz\u012bbas sist\u0113mas, t\u0101d\u0113\u013c katrs konteiners darbojas k\u0101 autonoms un dro\u0161s modulis.<\/p>\n<p class=\"wp-block-paragraph\">Projekts \u012bstenots cie\u0161\u0101 sadarb\u012bb\u0101 ar p\u0101rvades sist\u0113mas operatoru Elering un tehnolo\u0123iju un in\u017eenierijas partneriem, tostarp Yuso, Connecto un Energel. Park\u0101 izmantot\u0101s elektroener\u0123ijas uzkr\u0101\u0161anas sist\u0113mas pieg\u0101d\u0101ja Nidec Conversion, kura apak\u0161uz\u0146\u0113m\u0113js Igaunij\u0101 abu Hertz parku b\u016bvniec\u012bbas un elektromont\u0101\u017eas darbos bija WiSo Engineering.<\/p>\n<p class=\"wp-block-paragraph\">Hertz 1 un Hertz 2 b\u016bvniec\u012bba finans\u0113ta ar 85,6 miljonu eiro aizdevumu, ko pie\u0161\u0137\u012bra Eiropas Rekonstrukcijas un att\u012bst\u012bbas banka (ERAB), Zieme\u013cu Invest\u012bciju banka (NIB) un Edmond de Rothschild Asset Management. Juridiskajos jaut\u0101jumos dar\u012bjumu konsult\u0113ja advok\u0101tu biroji Rask un Cobalt.<\/p>\n<p><a href=\"https:\/\/mistape.com\" target=\"_blank\" rel=\"nofollow noopener\" class=\"mistape-link mistape-logo\"><\/a><\/p>\n<p>Ja rakst\u0101 paman\u012bji k\u013c\u016bdu, padod mums par to zi\u0146u, iez\u012bm\u0113jot a\u010dg\u0101rno tekstu un nospie\u017eot Ctrl+Enter. Paldies!<\/p>\n<p>&#13;<br \/>\n                    0&#13;<br \/>\n                    0&#13;<br \/>\n                    balsojumi<\/p>\n<p>Raksta nov\u0113rt\u0113jums<\/p>\n<p>\t\tPost navigation<\/p>\n","protected":false},"excerpt":{"rendered":"7. j\u016blij\u0101 Igaunij\u0101, Harju apri\u0146\u0137a Arukil\u0101, ofici\u0101li atkl\u0101ta akumulatoru ener\u0123ijas uzkr\u0101\u0161anas sist\u0113ma Hertz 2 ar 100 MW jaudu&hellip;\n","protected":false},"author":2,"featured_media":244691,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[16],"tags":[8584,2873,8585,77,76,40531,29580,40532,73,35,39,38,36,37,34,40,29582],"class_list":["post-244690","post","type-post","status-publish","format-standard","has-post-thumbnail","category-bizness","tag-aer","tag-baterijas","tag-bess","tag-bizness","tag-business","tag-corsica-sole","tag-evecon","tag-harju","tag-igaunija","tag-latvia","tag-latvian","tag-latviesu","tag-latviesu-valoda","tag-latviesuvaloda","tag-latvija","tag-lv","tag-mirova"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lv\/116888866961234217","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/244690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/comments?post=244690"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/244690\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media\/244691"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media?parent=244690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/categories?post=244690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/tags?post=244690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}