{"id":30734,"date":"2025-10-25T12:02:06","date_gmt":"2025-10-25T12:02:06","guid":{"rendered":"https:\/\/www.europesays.com\/lv\/30734\/"},"modified":"2025-10-25T12:02:06","modified_gmt":"2025-10-25T12:02:06","slug":"ziemelkurzemes-regionala-slimnica-isteno-saules-elektrostaciju-projektus-ventspili-un-talsos","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lv\/30734\/","title":{"rendered":"Zieme\u013ckurzemes re\u0123ion\u0101l\u0101 slimn\u012bca \u012bsteno saules elektrostaciju projektus Ventspil\u012b un Talsos"},"content":{"rendered":"<p>\u0160ie projekti tiek finans\u0113ti ar kapit\u0101la atlaidi no Atvese\u013co\u0161anas un notur\u012bbas meh\u0101nisma (ANM) pl\u0101na, t\u0101d\u0113j\u0101di veicinot za\u013c\u0101s ener\u0123ijas izmanto\u0161anu un samazinot <a href=\"https:\/\/www.tvnet.lv\/term\/653898\/slimnicas\" class=\"topicLink\" target=\"_blank\" rel=\"nofollow noopener\">slimn\u012bcas<\/a> ekspluat\u0101cijas izdevumus.<\/p>\n<p>M\u0113r\u0137is: za\u013ca n\u0101kotne un ekonomija<\/p>\n<p>Abu projektu galvenais m\u0113r\u0137is ir p\u0101reja uz videi draudz\u012bgu, atjaunojamu ener\u0123iju un b\u016btisks izdevumu samazin\u0101jums par pat\u0113r\u0113to elektroener\u0123iju.<\/p>\n<ul>\n<li>Ventspils slimn\u012bc\u0101 saules elektrostacija tiks izveidota ar pl\u0101noto jaudu, kas sp\u0113s sara\u017eot vismaz 150 MWh elektroener\u0123ijas gad\u0101.<\/li>\n<li>Talsu fili\u0101l\u0113 tiek pl\u0101nota maz\u0101ka elektrostacija ar jaudu, kas nodro\u0161in\u0101s vismaz 50 MWh elektroener\u0123ijas gad\u0101.<\/li>\n<\/ul>\n<p>Visa sara\u017eot\u0101 elektroener\u0123ija tiks izmantota pa\u0161pat\u0113ri\u0146am, maksim\u0101li atvieglojot slimn\u012bcas bud\u017eetu un mazinot ietekmi uz vidi.<\/p>\n<p>Saules elektrostaciju uzst\u0101d\u012b\u0161anu veic uz\u0146\u0113mums SIA \u201cUEC sist\u0113mas\u201d. B\u016bvdarbus abos objektos pl\u0101nots pabeigt un stacijas nodot ekspluat\u0101cij\u0101 l\u012bdz 2025. gada beig\u0101m.<\/p>\n<p>Projekta \u201cSaules elektrostacijas izveide In\u017eenieru iel\u0101 60, Ventspil\u012b\u201d kop\u0113j\u0101s projekta attiecin\u0101m\u0101s izmaksas ir 73 430,74 eiro, t. sk. Atvese\u013co\u0161anas un notur\u012bbas meh\u0101nisma pl\u0101na kapit\u0101latlaide (30%) \u2013 22 029,22 eiro. Kop\u0113j\u0101s projekta izmaksas: 91 331,70 eiro.<\/p>\n<p>Projekta \u201cSaules elektrostacijas izveide Stendes iel\u0101 1, Talsos\u201d kop\u0113j\u0101s projekta attiecin\u0101m\u0101s izmaksas ir 26 485,44 eiro, t. sk. Atvese\u013co\u0161anas un notur\u012bbas meh\u0101nisma pl\u0101na kapit\u0101latlaide (30%) \u2013 7 945,63 eiro. Kop\u0113j\u0101s projekta izmaksas: 34 527,88 eiro.<\/p>\n","protected":false},"excerpt":{"rendered":"\u0160ie projekti tiek finans\u0113ti ar kapit\u0101la atlaidi no Atvese\u013co\u0161anas un notur\u012bbas meh\u0101nisma (ANM) pl\u0101na, t\u0101d\u0113j\u0101di veicinot za\u013c\u0101s ener\u0123ijas&hellip;\n","protected":false},"author":2,"featured_media":30735,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[7004,77,76,35,39,38,36,37,34,40,1288,9280,2988],"class_list":{"0":"post-30734","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-bizness","8":"tag-altum","9":"tag-bizness","10":"tag-business","11":"tag-latvia","12":"tag-latvian","13":"tag-latviesu","14":"tag-latviesu-valoda","15":"tag-latviesuvaloda","16":"tag-latvija","17":"tag-lv","18":"tag-slimnicas","19":"tag-talsi","20":"tag-ventspils"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lv\/115434706830789290","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/30734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/comments?post=30734"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/30734\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media\/30735"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media?parent=30734"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/categories?post=30734"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/tags?post=30734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}