{"id":89088,"date":"2025-12-29T17:06:07","date_gmt":"2025-12-29T17:06:07","guid":{"rendered":"https:\/\/www.europesays.com\/lv\/89088\/"},"modified":"2025-12-29T17:06:07","modified_gmt":"2025-12-29T17:06:07","slug":"lietuvas-amber-grid-un-gazprom-paraksta-piecu-gadu-vienosanos-par-gazes-tranzitu-uz-kaliningradu-lente-lv","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/lv\/89088\/","title":{"rendered":"Lietuvas &#8220;Amber Grid&#8221; un &#8220;Gazprom&#8221; paraksta piecu gadu vieno\u0161anos par g\u0101zes tranz\u012btu uz Ka\u013ci\u0146ingradu\u00a0\u2014\u00a0Lente.lv"},"content":{"rendered":"<p>Jauns l\u012bgums par g\u0101zes tranz\u012btu<\/p>\n<p>Lietuvas g\u0101zes p\u0101rvades sist\u0113mas operators &#8220;Amber Grid&#8221; un Krievijas dabasg\u0101zes koncerns &#8220;Gazprom&#8221; ir nosl\u0113gu\u0161i jaunu piecu gadu vieno\u0161anos par Krievijas dabasg\u0101zes tranz\u012btu uz Ka\u013ci\u0146ingradas ekskl\u0101vu. K\u0101 inform\u0113 port\u0101ls jauns.lv, l\u012bgums st\u0101sies sp\u0113k\u0101 l\u012bdz 2030. gada 31. decembrim.<\/p>\n<p>Vieno\u0161an\u0101s deta\u013cas un termi\u0146\u0161<\/p>\n<p>\u0160\u012b jaun\u0101 vieno\u0161an\u0101s, kas nosl\u0113gta uz pieciem gadiem, aizst\u0101j iepriek\u0161\u0113jo desmit gadu l\u012bgumu, kur\u0161 nosl\u0113dz\u0101s 2025. gada beig\u0101s. Lai gan s\u0101kotn\u0113ji tika prognoz\u0113ts, ka sarunas var\u0113tu novest pie \u012bs\u0101ka termi\u0146a l\u012bguma, jaun\u0101 vieno\u0161an\u0101s nodro\u0161in\u0101s g\u0101zes pieg\u0101des l\u012bdz 2030. gada beig\u0101m.<\/p>\n<p>Prec\u012bzi l\u012bguma nosac\u012bjumi un tarifa izmai\u0146as pagaid\u0101m netiek publiskoti, ta\u010du ir sagaid\u0101ms, ka jaunais l\u012bgums var\u0113tu nodro\u0161in\u0101t Lietuvai iev\u0113rojami liel\u0101kus ien\u0101kumus par tranz\u012bta pakalpojumiem, sal\u012bdzinot ar iepriek\u0161\u0113jo periodu. Agr\u0101k Lietuvas ien\u0101kumi no g\u0101zes tranz\u012bta uz Ka\u013ci\u0146ingradu bija aptuveni 10-11 miljoni eiro gad\u0101, savuk\u0101rt jaun\u0101kie apr\u0113\u0137ini liecina, ka tie var\u0113tu sasniegt pat 29 miljonus eiro gad\u0101. \u0160o izmaksu pieaugumu nosaka gan Lietuvas invest\u012bcijas g\u0101zes p\u0101rvades infrastrukt\u016br\u0101, gan tarifa noteik\u0161ana saska\u0146\u0101 ar vienoto Eiropas Savien\u012bbas metodolo\u0123iju.<\/p>\n<p>Konteksts un iepriek\u0161\u0113jie notikumi<\/p>\n<p>Lietuva piln\u012bb\u0101 p\u0101rtrauca Krievijas g\u0101zes importu 2022. gada apr\u012bl\u012b, ta\u010du tranz\u012bts uz Ka\u013ci\u0146ingradu tika saglab\u0101ts k\u0101 iz\u0146\u0113mums, \u0146emot v\u0113r\u0101 re\u0123iona specifisko \u0123eogr\u0101fisko st\u0101vokli un atkar\u012bbu no \u0161\u012b pieg\u0101des ce\u013ca. G\u0101ze uz Ka\u013ci\u0146ingradu tiek pieg\u0101d\u0101ta no Baltkrievijas caur Lietuvu. \u0160\u012b situ\u0101cija ir \u012bpa\u0161i svar\u012bga, \u0146emot v\u0113r\u0101 Baltijas valstu elektrot\u012bklu sinhroniz\u0101ciju ar Eiropas t\u012bkliem.<\/p>\n<p>Iepriek\u0161\u0113jais desmit gadu l\u012bgums tika parakst\u012bts 2015. gada decembr\u012b un st\u0101j\u0101s sp\u0113k\u0101 2016. gada janv\u0101r\u012b. Toreiz tika prognoz\u0113ts, ka tas nodro\u0161in\u0101s ikgad\u0113ju ie\u0146\u0113mumu l\u012bmeni, kas sal\u012bdzin\u0101ms ar iepriek\u0161\u0113jo periodu. Tika rezerv\u0113tas ikdienas tranz\u012bta jaudas 10,5 miljonu kubikmetru apm\u0113r\u0101 un paredz\u0113ta ikgad\u0113ja 2,5 miljardu kubikmetru dabasg\u0101zes transport\u0113\u0161ana.<\/p>\n<p>Noz\u012bme re\u0123ionam un Eiropai<\/p>\n<p>\u0160is l\u012bgums ir b\u016btisks gan Lietuvai, gan Ka\u013ci\u0146ingradai. Lietuva turpina g\u016bt ien\u0101kumus no tranz\u012bta pakalpojumiem, savuk\u0101rt Ka\u013ci\u0146ingrada nodro\u0161ina savu apg\u0101di ar dabasg\u0101zi, kas nepiecie\u0161ama gan apkurei, gan elektroener\u0123ijas ra\u017eo\u0161anai. Lai gan Ka\u013ci\u0146ingrada var\u0113tu sa\u0146emt g\u0101zi ar\u012b caur sa\u0161\u0137idrin\u0101t\u0101s dabasg\u0101zes (LNG) termin\u0101li, \u0161is variants ir iev\u0113rojami d\u0101rg\u0101ks.<\/p>\n<p>L\u0113mumi par g\u0101zes tranz\u012btu uz atsevi\u0161\u0137iem Krievijas re\u0123ioniem, kas nav savienoti ar galveno teritoriju, tiek pie\u0146emti Eiropas Savien\u012bbas l\u012bmen\u012b, un ar\u012b \u0161\u012bs sarunas tika aizvad\u012btas cie\u0161\u0101 sadarb\u012bb\u0101 ar Eiropas Komisiju, nodro\u0161inot, ka l\u012bguma nosac\u012bjumi atbilst Eiropas Savien\u012bbas ties\u012bbu aktiem un politik\u0101m.<\/p>\n","protected":false},"excerpt":{"rendered":"Jauns l\u012bgums par g\u0101zes tranz\u012btu Lietuvas g\u0101zes p\u0101rvades sist\u0113mas operators &#8220;Amber Grid&#8221; un Krievijas dabasg\u0101zes koncerns &#8220;Gazprom&#8221; ir&hellip;\n","protected":false},"author":2,"featured_media":89089,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[23,22599,28,29,32,33,22600,1968,22,20901,30,31,35,39,38,36,37,34,1464,40,20,26,27,24,25,21],"class_list":{"0":"post-89088","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aktualitates","8":"tag-aktualitates","9":"tag-amber-grid","10":"tag-breaking-news","11":"tag-breakingnews","12":"tag-featured-news","13":"tag-featurednews","14":"tag-gazes-tranzits","15":"tag-gazprom","16":"tag-headlines","17":"tag-kaliningrada","18":"tag-latest-news","19":"tag-latestnews","20":"tag-latvia","21":"tag-latvian","22":"tag-latviesu","23":"tag-latviesu-valoda","24":"tag-latviesuvaloda","25":"tag-latvija","26":"tag-lietuva","27":"tag-lv","28":"tag-news","29":"tag-popularakas-zinas","30":"tag-popularakaszinas","31":"tag-top-stories","32":"tag-topstories","33":"tag-zinas"},"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@lv\/115803952444660526","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/89088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/comments?post=89088"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/posts\/89088\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media\/89089"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/media?parent=89088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/categories?post=89088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/lv\/wp-json\/wp\/v2\/tags?post=89088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}