{"id":12281,"date":"2026-06-17T09:00:10","date_gmt":"2026-06-17T09:00:10","guid":{"rendered":"https:\/\/www.europesays.com\/poland\/12281\/"},"modified":"2026-06-17T09:00:10","modified_gmt":"2026-06-17T09:00:10","slug":"contract-to-rebuild-warszawa-wschodnia-station","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/poland\/12281\/","title":{"rendered":"Contract to rebuild Warszawa Wschodnia station"},"content":{"rendered":"<p>\n                    Construction is due to begin in December 2026 and finish by the end of 2029.\n                <\/p>\n<p>\n                <a href=\"https:\/\/railmarket.com\/eu\/profile\/pkp-polskie-linie-kolejowe-s-a\" rel=\"nofollow noopener\" target=\"_blank\">PKP Polskie Linie Kolejowe<\/a> has awarded<br \/>\n<a href=\"https:\/\/railmarket.com\/eu\/profile\/torpol-s-a\" rel=\"nofollow noopener\" target=\"_blank\">Torpol<\/a> a nearly EUR 706m contract to rebuild Warszawa Wschodnia and Warszawa<br \/>\nStadion.\n            <\/p>\n<p>\n                The project covers the eastern rail gateway<br \/>\nto central Warsaw and prepares the network for the later reconstruction of the<br \/>\ncross-city line. Warszawa Wschodnia handles almost 1,000 trains a day, making<br \/>\nthe staging of works as important as the civil engineering scope.\n            <\/p>\n<p>                <img decoding=\"async\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/06\/D7472C14125D4175.jpg\" alt=\"\u00a9 PKP PLK\" loading=\"lazy\" class=\"figure-img img-fluid rounded\"\/><br \/>\n                \u00a9 PKP PLK<\/p>\n<p>\n                Traffic will be maintained during<br \/>\nconstruction. Some long-distance services will be diverted to Warszawa Gda\u0144ska<br \/>\nand Warszawa G\u0142\u00f3wna, while suburban services will later use a bypass through<br \/>\nWarszawa Stadion, Warszawa Powi\u015ble and Warszawa \u015ar\u00f3dmie\u015bcie.\n            <\/p>\n<p>\n                The works include the reconstruction of<br \/>\nseven platforms at Warszawa Wschodnia, new roofs, standardised platform<br \/>\nheights, passenger information systems, lifts and escalators. Three existing<br \/>\nunderpasses will be rebuilt, and a new tunnel connection will improve access<br \/>\nwithin the station area and towards Tysi\u0105clecia Street.\n            <\/p>\n<p>\n                Warszawa Stadion will also be rebuilt,<br \/>\nincluding platform works and a new pedestrian link to Stadion Narodowy metro<br \/>\nstation. The connection is intended to make transfers possible inside the<br \/>\ntransport node rather than through the surrounding street network.\n            <\/p>\n<p>                <img decoding=\"async\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/06\/443D435662FE690F.jpg\" alt=\"\u00a9 PKP PLK\" loading=\"lazy\" class=\"figure-img img-fluid rounded\"\/><br \/>\n                \u00a9 PKP PLK<\/p>\n<p>\n                The infrastructure package includes more<br \/>\nthan 46 km of rebuilt track, 57 km of new overhead contact line, 170 turnouts<br \/>\nand seven rebuilt railway viaducts. A new 1,600 m, 29-span viaduct will connect<br \/>\nWarszawa Wschodnia with line 9, used by services towards Gda\u0144sk, Olsztyn and<br \/>\nLegionowo.\n            <\/p>\n<p>\n                The project is co-financed from the EU\u2019s<br \/>\nFEnIKS programme for infrastructure, climate and environment.\n            <\/p>\n<p>\n          Join Our Circle of Insiders: Receive the Weekly Digest That Keeps You Ahead!\n      <\/p>\n","protected":false},"excerpt":{"rendered":"Construction is due to begin in December 2026 and finish by the end of 2029. PKP Polskie Linie&hellip;\n","protected":false},"author":2,"featured_media":12282,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[2764,8968,1012,8967,69,9,8969,8966,8772,45],"class_list":["post-12281","post","type-post","status-publish","format-standard","has-post-thumbnail","category-warsaw","tag-construction","tag-eu-funding","tag-infrastructure","tag-infrastructure-project","tag-pkp-plk","tag-poland","tag-railway-construction","tag-station-upgrade","tag-torpol","tag-warsaw"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/12281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/comments?post=12281"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/12281\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media\/12282"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media?parent=12281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/categories?post=12281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/tags?post=12281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}