{"id":15735,"date":"2026-07-06T07:47:09","date_gmt":"2026-07-06T07:47:09","guid":{"rendered":"https:\/\/www.europesays.com\/poland\/15735\/"},"modified":"2026-07-06T07:47:09","modified_gmt":"2026-07-06T07:47:09","slug":"tender-launched-for-the-final-section-of-the-line-in-the-krakow-area","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/poland\/15735\/","title":{"rendered":"Tender launched for the final section of the line in the Krak\u00f3w area"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-mh-magazine-content wp-image-139854\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/PKP-scaled-1-678x381.jpg\" alt=\"\" width=\"678\" height=\"381\"  \/>Photo: PLK\/Krzysztof_Dzidek<\/p>\n<p>Poland\u2019s railway infrastructure manager, PKP Polskie Linie Kolejowe (PLK), has launched a tender for the final section of a new railway line in the Krak\u00f3w area leading to the mountainous south of Poland.<\/p>\n<p>The tender involves construction work on a new line between Gd\u00f3w, 30 km southeast of Krak\u00f3w, and Szczyrzyc, 50 km south of Krak\u00f3w\u2014both cities located in the Lesser Poland (Ma\u0142opolskie) Voivodeship.<\/p>\n<p>The project is part of the Pod\u0142\u0119\u017ce\u2013Piekie\u0142ko program, and this tender will mark the completion of one of the country\u2019s largest railway investments.<\/p>\n<p>The work is estimated to take approximately 38 months, with a total cost of EUR 575 million (PLN 2.5 billion).<\/p>\n<p>The town of Szczyrzyc marks the completion of the project<\/p>\n<p>This is the final\u2014and, at the same time, one of the most technically challenging\u2014sections of the largest ongoing railway investment.<\/p>\n<p>The Gd\u00f3w\u2013Szczyrzyc section of the line in the Krak\u00f3w area will be 16 km long and will include both underground sections and complex above-ground structures. The project involves the construction of two <a href=\"https:\/\/www.railwaypro.com\/wp\/a-3-7-kilometer-railway-tunnel-in-southern-poland-has-been-completed\/\" rel=\"nofollow noopener\" target=\"_blank\">tunnels<\/a> with a total length of 2.4 km, as well as numerous viaducts, bridges, and trestles. The tallest structure will allow trains to travel 27 meters above ground, and the longest will exceed 850 meters. Trains will travel at speeds of up to 160 km\/h.<\/p>\n<p>\t\t\t\t<a href=\"https:\/\/www.railwaypro.com\/wp\/wp-content\/uploads\/2026\/07\/PKP2-scaled-1.jpg\" title=\"\" data-rl_title=\"\" class=\"rl-gallery-link\" data-rl_caption=\"\" data-rel=\"lightbox-gallery-1\" data-rl_ rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/PKP2-scaled-1-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-139857\"  \/><\/a><\/p>\n<p>\t\t\t\tPhoto: PLK\/Krzysztof_Dzidek<\/p>\n<p>\t\t\t\t<a href=\"https:\/\/www.railwaypro.com\/wp\/wp-content\/uploads\/2026\/07\/PKP-MAP.png\" title=\"\" data-rl_title=\"\" class=\"rl-gallery-link\" data-rl_caption=\"\" data-rel=\"lightbox-gallery-1\" data-rl_ rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/PKP-MAP-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-139856\"  \/><\/a><\/p>\n<p>\t\t\t\tPhoto: PLK<\/p>\n<p>\t\t\t\t<a href=\"https:\/\/www.railwaypro.com\/wp\/wp-content\/uploads\/2026\/07\/PKP_fot._Piotr_Hamarnik-scaled-1.jpg\" title=\"\" data-rl_title=\"\" class=\"rl-gallery-link\" data-rl_caption=\"\" data-rel=\"lightbox-gallery-1\" data-rl_ rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/PKP_fot._Piotr_Hamarnik-scaled-1-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-139855\"  \/><\/a><\/p>\n<p>\t\t\t\tPhoto: PLK\/Piotr Hamarnik<\/p>\n<p>On this section of the line in the Krak\u00f3w area, a station will be built in Szczyrzyc and two stops in Zr\u0119czyce and Grusz\u00f3w. All platforms will be accessible to people with limited mobility. In addition, underground passages equipped with elevators will be built to facilitate access to trains, and the road infrastructure in the area will be modernized with grade-separated crossings and new intersections designed to improve local traffic flow.<\/p>\n<p>The completion of this section will enable the opening of a new high-speed rail connection in southern Poland, between Krak\u00f3w, Nowy S\u0105cz, and Zakopane. This will significantly reduce travel times, contributing to the region\u2019s economic, tourism, and social development.<\/p>\n<p>The project for the line in the Krak\u00f3w area includes the modernization and electrification of 75 km of track on the Chab\u00f3wka\u2013Nowy S\u0105cz route, as well as the construction of 58 km of new track between Pod\u0142\u0119\u017ce, Tymbark, and Mszana Dolna.<\/p>\n<p>Once the work is completed, trains will travel between Krak\u00f3w and Nowy S\u0105cz in approximately 60 minutes, and to Zakopane in about 90 minutes.<\/p>\n<p>The total cost of the Pod\u0142\u0119\u017ce\u2013Piekie\u0142ko project is estimated at EUR 2.7 billion (PLN 12 billion); it represents one of the most significant developments in Poland\u2019s railway infrastructure and is co-financed by European funds through the National Recovery and Resilience Plan.<\/p>\n<p>Share on: <br \/><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-facebook nolightbox\" data-provider=\"facebook\" target=\"_blank\" rel=\"nofollow noopener\" title=\"Share on Facebook\" href=\"https:\/\/www.facebook.com\/sharer.php?u=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139853&amp;t=Tender%20launched%20for%20the%20final%20section%20of%20the%20line%20in%20the%20Krak%C3%B3w%20area&amp;s=100&amp;p[url]=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139853&amp;p[images][0]=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2Fwp-content%2Fuploads%2F2026%2F07%2FPKP-scaled-1.jpg&amp;pTender launched for the final section of the line in the Krak\u00f3w area=Tender%20launched%20for%20the%20final%20section%20of%20the%20line%20in%20the%20Krak%C3%B3w%20area\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px;margin-right:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"Facebook\" title=\"Share on Facebook\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/1783324028_138_facebook.png\"\/><\/a><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-twitter nolightbox\" data-provider=\"twitter\" target=\"_blank\" rel=\"nofollow noopener\" title=\"Share on Twitter\" href=\"http:\/\/twitter.com\/share?url=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139853&amp;text=Tender%20launched%20for%20the%20final%20section%20of%20the%20line%20in%20the%20Krak%C3%B3w%20area\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px;margin-right:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"twitter\" title=\"Share on Twitter\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/1783324028_210_twitter.png\"\/><\/a><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-linkedin nolightbox\" data-provider=\"linkedin\" target=\"_blank\" rel=\"nofollow noopener\" title=\"Share on Linkedin\" href=\"https:\/\/www.linkedin.com\/shareArticle?mini=true&amp;url=https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139853&amp;title=Tender%20launched%20for%20the%20final%20section%20of%20the%20line%20in%20the%20Krak%C3%B3w%20area\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px;margin-right:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"linkedin\" title=\"Share on Linkedin\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/1783324029_401_linkedin.png\"\/><\/a><a class=\"synved-social-button synved-social-button-share synved-social-size-32 synved-social-resolution-single synved-social-provider-mail nolightbox\" data-provider=\"mail\" rel=\"nofollow\" title=\"Share by email\" href=\"mailto:?subject=Tender%20launched%20for%20the%20final%20section%20of%20the%20line%20in%20the%20Krak%C3%B3w%20area&amp;body=Hey%20check%20this%20out:%20https%3A%2F%2Fwww.railwaypro.com%2Fwp%2F%3Fp%3D139853\" style=\"font-size: 0px;width:32px;height:32px;margin:0;margin-bottom:5px\"><img loading=\"lazy\" decoding=\"async\" alt=\"mail\" title=\"Share by email\" class=\"synved-share-image synved-social-image synved-social-image-share\" width=\"32\" height=\"32\" style=\"display: inline;width:32px;height:32px;margin: 0;padding: 0;border: none;box-shadow: none\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/07\/1783324029_396_mail.png\"\/><\/a>\t<script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"Photo: PLK\/Krzysztof_Dzidek Poland\u2019s railway infrastructure manager, PKP Polskie Linie Kolejowe (PLK), has launched a tender for the final&hellip;\n","protected":false},"author":2,"featured_media":15736,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[56,69,10669,1428],"class_list":["post-15735","post","type-post","status-publish","format-standard","has-post-thumbnail","category-krakow","tag-krakow","tag-pkp-plk","tag-podleze-piekielko-program","tag-tender"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/15735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/comments?post=15735"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/15735\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media\/15736"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media?parent=15735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/categories?post=15735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/tags?post=15735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}