{"id":22883,"date":"2026-08-27T19:03:59","date_gmt":"2026-08-27T19:03:59","guid":{"rendered":"https:\/\/www.europesays.com\/poland\/22883\/"},"modified":"2026-08-27T19:03:59","modified_gmt":"2026-08-27T19:03:59","slug":"greenvolt-elesela-enlight-european-energy-and-gen-i-progress-bess","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/poland\/22883\/","title":{"rendered":"Greenvolt, Elesela, Enlight, European Energy and GEN-I progress BESS"},"content":{"rendered":"<p class=\"wp-block-paragraph\">They are part of a 1.2GW portfolio of projects that Greenvolt won<a href=\"https:\/\/www.energy-storage.news\/greenvolt-wins-1-2gw-of-bess-contracts-in-poland-capacity-market-auction-claiming-70-of-total\/\" rel=\"nofollow noopener\" target=\"_blank\"> capacity market (CM) contracts for in 2023<\/a>, with obligations starting in 2028. The CM is the bedrock of the business case for most large-scale BESS in Poland.<\/p>\n<p class=\"wp-block-paragraph\">Greenvolt is also one of the main players in large-scale BESS in Hungary, <a href=\"https:\/\/www.energy-storage.news\/greenvolt-inaugurates-hungarys-largest-bess-pipelines-progressed-and-financed-elsewhere-in-eu\/\" rel=\"nofollow noopener\" target=\"_blank\">where it inaugurated the country\u2019s largest project in June<\/a>, and in Italy, where it <a href=\"https:\/\/www.energy-storage.news\/italy-is-a-natural-market-for-batteries-greenvolt-power-on-its-macse-winning-project\/\" rel=\"nofollow noopener\" target=\"_blank\">won a MACSE contract for a 75MW\/600MWh BESS (subscription required)<\/a>.\u00a0<\/p>\n<p>Enlight buys Finland BESS from Korkia<\/p>\n<p class=\"wp-block-paragraph\">Developer Korkia has sold a 125MW ready-to-build BESS in Finland to IPP Enlight.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">The sale was completed by Korkia Semecon Finland Renewables, a joint venture between Korkia and fellow developer Semecon. The Kukonkyl\u00e4 project is in Sievi, Northern Ostrobothnia, Finland.<\/p>\n<p class=\"wp-block-paragraph\">Under Enlight\u2019s ownership, Kukonkyl\u00e4 is set to connect to Finland\u2019s transmission grid by H1 2028. The IPP is also active in BESS <a href=\"https:\/\/www.energy-storage.news\/enlight-advances-us3-billion-1-2gw-solar-4gwh-bess-complex-in-arizona\/\" rel=\"nofollow noopener\" target=\"_blank\">in the US<\/a> and <a href=\"https:\/\/www.energy-storage.news\/enlight-hybridises-spains-largest-wind-power-plant-with-solar-pv-bess-retrofits\/\" rel=\"nofollow noopener\" target=\"_blank\">Spain<\/a>.\u00a0<\/p>\n<p>UAB Elesela reaches financial close on 20MWh Lithuania BESS<\/p>\n<p class=\"wp-block-paragraph\">Developer UAB Elesela has reached financial close with a non-recourse financing package from Artea Bank for its Klaip\u0117da 20MWh BESS project in Lithuania. It has appointed China-based system integrator ZEO Energy Storage to deliver the project, with commissioning expected to begin on 20 January 2027.\u00a0<\/p>\n<p>Capalo AI to optimise Lithuanian and Latvia hybrid projects\u00a0<\/p>\n<p class=\"wp-block-paragraph\">Developer and IPP European Energy has enlisted Finland-based optimiser to trade and monetise two solar-plus-storage projects in Lithuania and Latvia totalling 140MW solar and 71MW\/170MWh of BESS.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">The deal covers the 78MW solar, 25MW\/65MWh BESS Anyk\u0161\u010diai hybrid park in Lithuania and the 65.7MW solar, 46MW\/105MWh Saldus Hybrid Park in Latvia. Anyk\u0161\u010diai went online in June while Saldus will be completed in the second half of this year.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">European Energy has previously <a href=\"https:\/\/www.energy-storage.news\/eu-roundup-operators-commission-682mwh-of-bess-in-germany-estonia-belgium-denmark-and-bulgaria\/\" rel=\"nofollow noopener\" target=\"_blank\">completed two large solar-plus-storage projects in its home country of Denmark<\/a>, optimised by Danske Commodities.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">Capalo has had success in expanding out of Finland into the Baltic region, also winning separate optimisation contracts <a href=\"https:\/\/www.energy-storage.news\/greenvolt-european-energy-olana-and-energix-progress-denmark-poland-and-baltic-bess-projects\/\" rel=\"nofollow noopener\" target=\"_blank\">in Lithuania<\/a> and <a href=\"https:\/\/www.energy-storage.news\/edf-completes-120mwh-poland-bess-eurus-ngen-and-aretis-progress-other-cee-projects\/\" rel=\"nofollow noopener\" target=\"_blank\">in Latvia<\/a> in the past year.\u00a0<\/p>\n<p>GEN-I enlists EPC Waldemar for Romania project<\/p>\n<p class=\"wp-block-paragraph\">GEN-I Sonce has enlisted EPC firm Waldevar Energy to build a 55MW\/220MWh BESS in\u00a0Gheorgheni, Romania.<\/p>\n<p class=\"wp-block-paragraph\">GEN-I has historically been focused on trading energy but recent announcements show it moving into full ownership of BESS projects in Romania.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">It recently completed two BESS projects in neighbouring Bulgaria with system integrator Sunotec, totalling <a href=\"https:\/\/www.energy-storage.news\/eu-roundup-operators-commission-682mwh-of-bess-in-germany-estonia-belgium-denmark-and-bulgaria\/\" rel=\"nofollow noopener\" target=\"_blank\">50MW\/126MWh<\/a> and <a href=\"https:\/\/www.energy-storage.news\/europe-round-up-encavis-ox2-move-on-bess-in-italy-sunotec-commissions-bulgarian-battery\/\" rel=\"nofollow noopener\" target=\"_blank\">150MW\/379MWh<\/a> respectively.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"They are part of a 1.2GW portfolio of projects that Greenvolt won capacity market (CM) contracts for in&hellip;\n","protected":false},"author":2,"featured_media":22884,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[13968,13969,2767,13970,605,10166,1598,352,4329,9,76,13971,2769],"class_list":["post-22883","post","type-post","status-publish","format-standard","has-post-thumbnail","category-poland","tag-energystoragecee","tag-enlight","tag-epc","tag-european-energy","tag-finland","tag-greenvolt","tag-latvia","tag-lithuania","tag-optimisation","tag-poland","tag-romania","tag-solar-plus-storage","tag-storagecee"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/22883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/comments?post=22883"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/22883\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media\/22884"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media?parent=22883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/categories?post=22883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/tags?post=22883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}