{"id":27297,"date":"2026-09-23T19:05:00","date_gmt":"2026-09-23T19:05:00","guid":{"rendered":"https:\/\/www.europesays.com\/poland\/27297\/"},"modified":"2026-09-23T19:05:00","modified_gmt":"2026-09-23T19:05:00","slug":"bechtel-westinghouse-group-pej-agree-on-terms-for-polands-first-nuclear-power-plant","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/poland\/27297\/","title":{"rendered":"Bechtel-Westinghouse Group, PEJ Agree on Terms for Poland&#8217;s First Nuclear Power Plant"},"content":{"rendered":"<p>\t\t\t\t\t\t\t<img loading=\"lazy\" width=\"300\" height=\"156\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/09\/stock_ap1000-nuclear-plant-model_westinghouse-300x156.jpg\" class=\"img-fluid wp-post-image\" alt=\"Bechtel-Westinghouse Group, PEJ Agree on Terms for Poland\u2019s First Nuclear Power Plant\" style=\"width: 100%; height: auto;\" decoding=\"async\"  \/>\t\t\t\t\t\t<\/p>\n<p>Poland\u2019s state-owned nuclear power company and a consortium led by Bechtel and Westinghouse have agreed on the main commercial terms of a deal to build that country\u2019s first nuclear power plant.<\/p>\n<p>The groups on September 23 said the engineering, procurement, and construction (EPC) contract, which still must be signed, stipulates that the power station will use three Westinghouse AP1000 Generation III+ pressurized water reactors, with a total 3,750 MW of generation capacity. Both Polskie Elektrownie J\u0105drowe (PEJ), a special purpose vehicle 100% owned by Poland\u2019s state treasury, and the Bechtel-Westinghouse consortium said they are committed to finishing negotiations for the EPC deal by year-end. The companies noted that the agreement \u201cbrings together American reactor technology and an American engineering and construction team, working with Polish industry on one of Europe\u2019s most important energy infrastructure projects.\u201d<\/p>\n<p>Westinghouse was <a href=\"https:\/\/www.powermag.com\/poland-picks-westinghouse-to-build-countrys-first-nuclear-reactors\/\" rel=\"nofollow noopener\" target=\"_blank\">first announced in 2022<\/a> as the reactor supplier for the Poland power station. Poland wants to build more carbon-free power generation capacity (<a href=\"https:\/\/www.powermag.com\/nuscale-last-energy-make-significant-insteps-for-smrs-in-poland\/\" rel=\"nofollow noopener\" target=\"_blank\">including small modular reactors<\/a>) to help <a href=\"https:\/\/www.powermag.com\/smrs-may-replace-polish-coal-ge-hitachi-in-fuel-supply-pact\/\" rel=\"nofollow noopener\" target=\"_blank\">reduce its reliance on coal-fired power<\/a>.<\/p>\n<p>\u201cThis agreement reflects the momentum we\u2019ve built with PEJ, and it\u2019s a vote of confidence in American nuclear technology and know-how,\u201d said Dena Volovar, president of Bechtel\u2019s Nuclear, Security &amp; Environmental business. \u201cBechtel has designed, built, or supported 150 nuclear power plants over 80 years, and we recently completed the most modern <a href=\"https:\/\/www.powermag.com\/westinghouse-files-to-update-ap1000-design-certification-make-vogtle-expansion-the-u-s-reference-plant\/\" rel=\"nofollow noopener\" target=\"_blank\">AP1000 units<\/a> in the United States [at the Plant Vogtle site in Georgia]. Using modern execution tools to drive efficient delivery, we\u2019re bringing that experience to Poland, and we\u2019re building local capability as we go. By the time this plant is running, Polish companies and Polish workers will be part of a nuclear industry that can compete for decades.\u201d<\/p>\n<p>Bechtel\u2019s Experience<\/p>\n<p>Bechtel is known as one of the world\u2019s leading engineering, construction and project management companies. Bechtel since 1898 has supported more than 25,000 projects in 160 countries on all seven continents. The company has said the first nuclear concrete pour for the Polish plant is targeted for 2028.<\/p>\n<p>\u201cPEJ and the Westinghouse-Bechtel consortium have agreed on the main terms of the contract for the construction of the first Polish nuclear power plant, which provides the basis for further, detailed negotiations regarding the remaining terms of cooperation under the EPC Contract,\u201d said Marek Woszczyk, president of Polskie Elektrownie Jadrowe. \u201cThe American Westinghouse-Bechtel consortium will be responsible for the construction of the facility, with the first electricity to the Polish grid from the power plant to flow in 2036.\u201d<\/p>\n<p>The companies on Wednesday said work \u201cis moving forward\u201d at the power plant site in the Lubiatowo-Kopalino location in Choczewo commune. PEJ released the project site to Bechtel in August of this year.<\/p>\n<p>PEJ applied to Poland\u2019s State Atomic Energy Agency for a construction permit in March of this year. A second stage of preparatory work is underway, which includes grading and leveling of the grounds, upgrading drainage systems, and constructing temporary roads to support future development, according to the groups. In-depth geological surveys are continuing.<\/p>\n<p>Local Workforce<\/p>\n<p>The project continues to award contracts to Polish companies for key site work; those groups include Budimex, Doraco, Unihouse, MSA Security, and Barg M.B Gda\u0144sk. Officials on Wednesday said more contracts with Polish subcontractors are expected to be awarded soon.<\/p>\n<p>Bechtel and Westinghouse said their recent experience in completing the two-unit expansion at the Vogtle site is a key element of the work that will be done in Poland. The companies said the second of the two new units at the Georgia plant was built \u201c30% more efficiently than the first.\u201d<\/p>\n<p>Officials said the Polish project has included nearly 200 Polish nationals on the project team, with another 100 in the recruitment process. Construction of the new power station already has provided about $250 million contracts for Poland-based companies. Staff-development agreements are in place with three Polish universities.<\/p>\n<p>\u2014Darrell Proctor is a senior editor for POWER.<\/p>\n","protected":false},"excerpt":{"rendered":"Poland\u2019s state-owned nuclear power company and a consortium led by Bechtel and Westinghouse have agreed on the main&hellip;\n","protected":false},"author":2,"featured_media":27298,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[16247,12972,2957,2866,2482,16248,16249,9,16250,16251,16252],"class_list":["post-27297","post","type-post","status-publish","format-standard","has-post-thumbnail","category-poland","tag-ap1000","tag-bechtel","tag-coal","tag-first","tag-nuclear","tag-pej","tag-plant-vogtle","tag-poland","tag-pressurized-water-reactor","tag-pwr","tag-westinghouse"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/27297","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/comments?post=27297"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/27297\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media\/27298"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media?parent=27297"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/categories?post=27297"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/tags?post=27297"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}