{"id":28307,"date":"2026-09-29T22:20:36","date_gmt":"2026-09-29T22:20:36","guid":{"rendered":"https:\/\/www.europesays.com\/poland\/28307\/"},"modified":"2026-09-29T22:20:36","modified_gmt":"2026-09-29T22:20:36","slug":"bechtel-westinghouse-sign-epc-contract-for-polands-first-nuclear-plant","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/poland\/28307\/","title":{"rendered":"Bechtel-Westinghouse sign EPC contract for Poland\u2019s first nuclear plant"},"content":{"rendered":"<p><img loading=\"lazy\" post-id=\"73237\" fifulocal-featured=\"1\" decoding=\"async\" width=\"1000\" height=\"599\" src=\"https:\/\/www.europesays.com\/poland\/wp-content\/uploads\/2026\/09\/bechtel-1.jpg\" alt=\"\" class=\"wp-image-73238\"  \/>A render of the nuclear facility on Poland\u2019s Baltic coast (Image courtesy of Polish Nuclear Power Plants\/Bechtel)<\/p>\n<p>\nA consortium of Bechtel and nuclear power firm Westinghouse has been awarded an engineering, procurement and construction (EPC) contract from the state-owned Polskie Elektrownie J\u0105drowe (PEJ) for the country\u2019s first nuclear power plant.\n<\/p>\n<p class=\"wp-block-paragraph\">They will build the facility in Choczewo, Pomerania, on the Baltic coast. PEJ said the new plant will start generating electricity in 2036.<\/p>\n<p class=\"wp-block-paragraph\">The EPC contract\u2019s main commercial terms have been agreed, paving the way for further, detailed negotiations regarding the remaining aspects.<\/p>\n<p class=\"wp-block-paragraph\">The second stage of preparatory work is currently underway, involving grading and levelling the site, drainage works, construction of temporary roads and geological surveys.<\/p>\n<p class=\"wp-block-paragraph\">PEJ applied in March 2026 for a building permit to begin in 2027.<\/p>\n<p class=\"wp-block-paragraph\">Budimex, Doraco, Unihouse, MSA Security and Barg M.B Gda\u0144sk ar\u0119 among some of the Polish companies that have won contracts worth $250m on the project.<\/p>\n<p class=\"wp-block-paragraph\">The price tag for the nuclear plant <a href=\"https:\/\/www.globalconstructionreview.com\/bechtel-opens-polish-office-to-oversee-countrys-first-nuclear-plant\/\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">could reach $37bn<\/a>. It will have three Westinghouse AP1000 units generating 3,750 MWe of energy. The Generation III+ reactor has fully passive safety systems, a modular design and one of the smallest footprints per MWe.<\/p>\n<p class=\"wp-block-paragraph\">The project aims to reduce Poland\u2019s dependence on coal, reducing it from 51% at present, <a href=\"https:\/\/ember-energy.org\/countries-and-regions\/poland\/#:~:text=In%202023,%20Poland%20generated%20nearly,were%20above%20the%20global%20average.\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">according<\/a> to energy think tank Ember. The country is one of the top 10 emitters of coal mine methane globally.\u00a0<\/p>\n<p class=\"wp-block-paragraph\">If finance can be secured, a second plant will be built by Kepco of South Korea and will consist of two APR 1400 reactors installed in Poland\u2019s central Patn\u00f3w-Konin region.<\/p>\n<p>Subscribe to our newsletter <a href=\"https:\/\/www.globalconstructionreview.com\/newsletter\/\" target=\"_blank\" rel=\"noopener nofollow\">here<\/a> to receive construction news and insights from around the world straight to your inbox<\/p>\n","protected":false},"excerpt":{"rendered":"A render of the nuclear facility on Poland\u2019s Baltic coast (Image courtesy of Polish Nuclear Power Plants\/Bechtel) A&hellip;\n","protected":false},"author":2,"featured_media":28308,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[12972,2482,9],"class_list":["post-28307","post","type-post","status-publish","format-standard","has-post-thumbnail","category-poland","tag-bechtel","tag-nuclear","tag-poland"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/28307","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/comments?post=28307"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/posts\/28307\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media\/28308"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/media?parent=28307"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/categories?post=28307"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/poland\/wp-json\/wp\/v2\/tags?post=28307"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}