{"id":271502,"date":"2026-08-22T07:13:12","date_gmt":"2026-08-22T07:13:12","guid":{"rendered":"https:\/\/www.europesays.com\/ro\/271502\/"},"modified":"2026-08-22T07:13:12","modified_gmt":"2026-08-22T07:13:12","slug":"kazahstan-dezvolta-6-proiecte-mari-de-energie-regenerabila-simultan-demonstrand-ca-energia-eoliana-poate-fi-ieftina-chiar-si-cu-stocare-de-baterii-piataauto-md","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/ro\/271502\/","title":{"rendered":"Kazahstan dezvolt\u0103 6 proiecte mari de energie regenerabil\u0103 simultan, demonstr\u00e2nd c\u0103 energia eolian\u0103 poate fi ieftin\u0103, chiar \u015fi cu stocare de baterii | PiataAuto.md"},"content":{"rendered":"<p>\t<img decoding=\"async\" src=\"https:\/\/www.europesays.com\/ro\/wp-content\/uploads\/2026\/08\/1787382790_111_Loader5.gif\" \/><\/p>\n<p>21 August 2026, 19:23<br \/>Redac\u0163ia PiataAuto.md<\/p>\n<p>\t\t\t\t\t\t\u00cen ultimii ani auzim tot mai des despre problema ap\u0103s\u0103toare a costurilor mari la energie pentru industria european\u0103, iar asta e valabil \u015fi pentru Rom\u00e2nia, dar \u015fi pentru Germania, considerat\u0103 unul din nucleele industriale ale Europei. Povara costurilor mari la energie, \u00een special electricitate, e una ap\u0103s\u0103toare, care reduce competitivitatea industriei germane \u015fi duce la concedieri, falimente \u015fi \u00eenchideri de fabrici. Acum c\u00e2teva s\u0103pt\u0103m\u00e2ni, indicam \u00eentr-un articol c\u0103 Siemens va construi o sta\u0163ie uria\u015f\u0103 de convertire HVDC \u00een Marea Nordului pentru un parc eolian care nu exist\u0103 \u015fi nu e alocat \u00eenc\u0103, \u00eentruc\u00e2t dup\u0103 ce Germania a renun\u0163at s\u0103 le mai garanteze pre\u0163uri uria\u015fe noilor parcuri eoliene, a disp\u0103rut brusc interesul pentru alocarea noilor suprafe\u0163e de parcuri eoliene maritime, licita\u0163iile sold\u00e2ndu-se cu zero oferte depuse. Ar\u0103tam \u00een acel <a class=\"BluLink11\" target=\"_blank\" href=\"\/Stiri\/2026\/07\/Siemens-va-construi-o-statie-uriasa-convertire-HVDC-Marea-Nordului-un-parc-eolian-care-nu-exista-revigorare-capacitati-productie-Germania\/\">articol<\/a> c\u0103 \u00een 2025, pre\u0163ul mediul de v\u00e2nzare a electricit\u0103\u0163ii din surse eoliene la burse \u00een Germania a fost de 67,77 euro\/MWh, doar c\u0103 statul german, prin mecanismele de garantare, le-a mai pl\u0103tit parcurilor eoliene \u00eenc\u0103 97 euro\/MWh, ajung\u00e2ndu-se la un cost total de 165 euro\/MWh \u00een energia eolian\u0103. E un pre\u0163 enorm, care nu poate fi competitiv \u015fi chiar dac\u0103 el nu e pl\u0103tit direct de consumator, tot din taxele lui e pl\u0103tit\u0103 \u015fi diferen\u0163a. Germania are \u015fi parcuri terestre \u015fi maritime, \u015fi e adev\u0103rat c\u0103 cele maritime cost\u0103 mai mult \u00een investi\u0163ii ini\u0163iale, dar \u015fi randamentul de produc\u0163ie e mai mare \u00eentotdeauna. Iar Germania are nevoie de energie eolian\u0103 pentru a-\u015fi acoperi golurile l\u0103sate de renun\u0163area la energie nuclear\u0103. Se poate l\u0103sa, deci, impresia c\u0103 energia eolian\u0103 poate fi doar exorbitant de scump\u0103, iar o \u0163ar\u0103 care ar miza prea mult pe ea ar deveni necompetitiv\u0103. Dar ceea ce se \u00eent\u00e2mpl\u0103 acum \u00een Kazahstan demonstreaz\u0103 c\u0103 nu e deloc a\u015fa \u015fi serve\u015fte ca un contrast enorm fa\u0163\u0103 de pre\u0163urile la energie \u00een Germania sau chiar \u00een Rom\u00e2nia. Kazahstan dezvolt\u0103 \u00een prezent 6 proiecte mari de energie regenerabil\u0103 simultan, cu costuri aprobate care demonstrez\u0103 f\u0103r\u0103 echivoc c\u0103 energia eolian\u0103 poate fi ieftin\u0103, chiar \u015fi cu stocare de baterii inclus\u0103.<\/p>\n<p>\t\t\t\t\t\tCele 6 proiecte despre care vorbim reprezint\u0103 5 parcuri eoliene terestre, a c\u00e2te 1 GW fiecare, cu centrale BESS de stocare a electricit\u0103\u0163ii incluse, iar cel de-al 6-lea e un proiect cu func\u0163ionalitate diferit\u0103, care va combina energia eolian\u0103, solar\u0103 \u015fi bateriile pentru a furniza 200 MW de electricitate constant\u0103, 24 ore din 24, c\u0103tre centrele de date de inteligen\u0163\u0103 artificial\u0103, care vor fi alimentate astfel cu energie regenerabil\u0103, nu cu <a class=\"BluLink11\" target=\"_blank\" href=\"\/Stiri\/2026\/08\/Producatorii-turbine-mari-gaz-au-randuri-de-5-ani-inainte-motivand-revenirea-pietei-la-tehnologia-arhaica-a-turbinelor-cu-abur-cu-randament-redus\/\">turbine<\/a> cu gaze sau cu <a class=\"BluLink11\" target=\"_blank\" href=\"\/Stiri\/2026\/08\/In-timp-ce-normele-Euro-7-sunt-la-orizont-germanii-vor-livra-zeci-motoare-V18-de-2206-litri-intr-o-singura-locatie-vor-emite-cat-1000000-masini-noi\/\">motoare<\/a> imense, ca \u00een cazurile despre care scriam recent. \u015ei asta chiar dac\u0103 tocmai Kazahstan e o \u0163ar\u0103 cu rezerve imense de combustibili fosili.<\/p>\n<p>\n\t\t\t\t\t\tIar aceste parcuri eoliene sunt dezvoltate cu particip\u0103ri ale unora din cele mai reputate companii \u015fi finan\u0163atori interna\u0163ionali, deci nu e o situa\u0163ie \u00een care ar fi vorba de dezvoltatori incipien\u0163i, care ar livra primele parcuri foarte ieftin, ca s\u0103-\u015fi afirme experien\u0163a. Spre exemplu, unul din parcurile eoliene, Mirny, e dezvoltat de renumita companie francez\u0103 TotalEnergies, \u00eempreun\u0103 cu partenerii s\u0103i de la Samruk Energy \u015fi KazMunayGas, cu participarea unui consor\u0163iu de finan\u0163atori care cuprinde institu\u0163ii precum BERD, Societe Generale, Propaco, DEG \u015fi al\u0163ii.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tNoul parc eolian Mirny va con\u0163ine 150 de turbine eoliene, cu o putere instalat\u0103 total\u0103 de 1 GW, cu o putere de aproximativ 6,7 MW per turbin\u0103. Parcul va con\u0163ine \u015fi o central\u0103 de baterii de stocare, de 600 MWh capacitate \u015fi 300 MW putere, bateriile urm\u00e2nd a fi folosite conform necesit\u0103\u0163ilor din re\u0163ea. Durata de via\u0163\u0103 estimat\u0103 a parcului e de minim 25 de ani, timp \u00een care el trebuie s\u0103 livreze 100 TWh de electricitate, deci c\u00e2te 4 TWh anual. Asta \u00eenseamn\u0103 un factor de capacitate estimat la tocmai 45,5%, printre cele mai mari imaginabile pentru un pac eolian terestru, dar dezvoltatorii ne asigur\u0103 c\u0103 cifra e fezabil\u0103 \u015fi realist\u0103 \u00een condi\u0163iile reliefului kazah, cu stepe \u00eentinse \u015fi v\u00e2nturi puternice. Investi\u0163iile necesare \u00een acest parc, cu tot cu baterii, sunt de 1,2 miliarde de dolari. Statul kazah nu pl\u0103te\u015fte niciun dolar, \u00eens\u0103 va cump\u0103ra toat\u0103 electricitatea produs\u0103 de parc tip de 25 de ani, la un pre\u0163 fix.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tUn alt parc de 1 GW putere e dezvoltat de compania Masdar din Emiratele Arabe Unite \u00een regiunea Zhambyl. Parcul eolian va con\u0163ine \u00een mod similar o central\u0103 de baterii de 300 MW putere \u015fi 600 MWh capacitate de stocare, folosit\u0103 conform cerin\u0163elor din re\u0163ea. Masdar a anun\u0163at c\u0103 investi\u0163ia pentru acest proiect e aprobat\u0103 la 1,4 miliarde de dolari, \u00eentruc\u00e2t ea presupune \u015fi construc\u0163ia a 400 km de linii electrice aeriene noi, care trebuie s\u0103 integreze noul parc eoliana cu re\u0163eaua din sudul Kazahstanului. Din nou, statul kazah nu pl\u0103te\u015fte nimic, nici m\u0103car pentru acele linii electrice adi\u0163ionale, \u00eens\u0103 le garanteaz\u0103 celor de la Masdar pre\u0163 fix de achizi\u0163ie a electricit\u0103\u0163ii produse timp de 25 de ani. Masdar estimeaz\u0103 produc\u0163ia anual\u0103 a parcului la 3,4 TWh.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\t\u015ei dac\u0103 tot avem aceste dou\u0103 parcuri eoliene de aceea\u015fi putere \u015fi aceea\u015fi capacitate de stocare inclus\u0103, iar unul are investi\u0163ii ceva mai mari \u00een liniile electrice, putem compara \u015fi pre\u0163ul cu care Kazahstan va cump\u0103ra electricitatea de la ele. \u00cen cazul primului parc, al TotalEnergies, pre\u0163ul agreat e de 4,25 cen\u0163i de dolar per kWh. Cifra \u00eenseamn\u0103 42,50 USD\/MWh, iar dac\u0103 o transform\u0103m \u00een euro \u2014 e 36,38 EUR\/MWh. Deci, statul kazah va pl\u0103ti 3,64 eurocen\u0163i per kWh de electricitate produs\u0103 \u00een acest parc, pre\u0163 fix timp de 25 de ani \u00eenainte, \u015fi va ad\u0103uga \u00een mod evident costuri de transport \u015fi operare a distribuitorului, dar la final electricitatea va ajunge la consumatori oricum la un pre\u0163 excep\u0163ional de accesibil, de maxim 6-7 cen\u0163i per kWh. Poate fi industria competitiv\u0103 astfel? R\u0103spunsul e evident.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\t\u015ei parcul eolian al celor de la Masdar are un pre\u0163 fix u\u015for mai mare, din cauza investi\u0163iei ceva mai mari necesare \u00een liniile aeriene. E un pre\u0163 de 4,49 cen\u0163i de dolari per kWh, sau 44,90 USD\/MWh. \u00cen euro, \u00eenseamn\u0103 38,44 EUR\/MWh sau 3,84 euro cen\u0163i per kWh de electricitate din surse eoliene.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tIar partea de care nu trebuie s\u0103 uit\u0103m e c\u0103 aici aceste pre\u0163uri includ \u015fi stocarea \u00een baterii, ceea ce \u00een proiectele din alte \u0163\u0103ri ar \u00eensemna un tarif separat ustur\u0103tor.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tAl treilea parc eolian aflat deja \u00een construc\u0163ie e Parvlodar, dezvoltat de chinezii de la State Power Investment Corporation cu Samruk Energy. Putem observa \u015fi distribu\u0163ia foarte strategic\u0103 a aloc\u0103rii acestor parcuri \u2014 unul c\u0103tre francezi\/europeni, altul c\u0103tre cei din Orientul Mijlociu \u015fi altul c\u0103tre China. Parcul eolian de la Pavlodar va avea aceea\u015fi formul\u0103 de 1 GW de putere instalat\u0103 \u015fi central\u0103 de 600 MWh, cu 300 MW putere. Investi\u0163ia e estimat\u0103 la 1,2 miliarde \u015fi aici, ca \u00een cazul francezilor. Din nou, statul kazah nu pl\u0103te\u015fte nimic, dar garanteaz\u0103 achizi\u0163ia electricit\u0103\u0163ii. \u00cen acest caz pre\u0163ul e stipulat \u00een yuani \u015fi n-a fost anun\u0163at public, dar s-a sugerat c\u0103 e chiar mai mic.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tUn alt 4-lea parc, cu licita\u0163ie deja desf\u0103\u015furat\u0103 \u015fi alocat\u0103 \u015fi construc\u0163ie care trebuie s\u0103 \u00eenceap\u0103 \u00een cur\u00e2nd. C\u00e2\u015ftig\u0103torul e compania local\u0103 Turan Wind Energy, \u015fi formula e similar\u0103 \u2014 1 GW de putere instalat\u0103 a turbinelor, cu central\u0103 de baterii de 300 MW putere \u015fi 600 MWh capacitate, cu o produc\u0163ie anual\u0103 estimat\u0103 de 3,9 TWh. Pre\u0163ul fixat aici e \u00een moneda kazah\u0103, tenge, \u015fi constituie 18,72 tenge\/kWh, echivalentul a 4,1 cen\u0163i de dolar per kWh. Deci \u015fi mai ieftin dec\u00e2t primele dou\u0103 de mai sus, iar \u00een euro asta \u00eenseamn\u0103 35,10 euro\/MWh, sau trei cen\u0163i \u015fi jum\u0103tate per kWh.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tPre\u0163ul stabilit la cel de-al 5-lea proiect eolian de 1 GW, ACWA Power, are un mecanism diferit, de doar 2,81 cen\u0163i\/kWh pentru electricitate \u015fi o plat\u0103 fix\u0103 de 5,4 milioane de dolari lunar pentru bateria de 300 MW \u015fi 600 MWh. Produc\u0163ia anual\u0103 estimat\u0103 aici de 4,0 TWh, \u015fi e u\u015for s\u0103 raport\u0103m suma lunar\u0103 fix\u0103 \u00een mediu per kWh livrat. La 4,0 TWh anual, se vor livra \u00een mediu 333.333 MWh lunar, iar cifra fix\u0103 de 5,4 milioane de dolari pl\u0103tit\u0103 lunar rezult\u0103 \u00een 16,2 dolari\/MWh, sau 1,62 cen\u0163i de dolar per kWh. Dac\u0103 o adun\u0103m la cei 2,81 cen\u0163i pentru electricitate direct\u0103, avem o sum\u0103 total\u0103 de aproximativ 4,43 cen\u0163i de dolar per kWh, apropiat\u0103 de cifra parcului Masdar.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tDeci, pre\u0163ul mic la electricitate e o regul\u0103 valabil\u0103 pentru toate cele 5 mari parcuri eoliene, toate de 1 GW putere, dezvoltate acum \u00een Kazahstan. Iar ele vor produce \u00eempreun\u0103 aproximativ 19 TWh de electricitate anual, o cantitate suficient de mare de energie, \u00eenc\u00e2t s\u0103 influen\u0163ele prin ponderea sa foarte mult pre\u0163ul la electricitate pentru consumatorii finali. \u015ei la pre\u0163urile pe care le vedem mai sus, putem spune c\u0103 electricitatea va r\u0103m\u00e2ne ieftin\u0103 \u00een Kazahstan, chiar \u015fi cu 5 asemenea parcuri uria\u015fe. Deci, energia eolian\u0103 poate fi ieftin\u0103 \u015fi cumva to\u0163i dezvoltatorii din cele 5 parcuri au calculat c\u0103-\u015fi vor rambursa investi\u0163iile f\u0103cute p\u00e2n\u0103 \u015fi cu un asemenea pre\u0163 mic de achizi\u0163ie. \u015ei a fost concuren\u0163\u0103 la fiecare proiect, cu c\u00e2te 4-5 oferte analizate.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tCel de-al 6-lea proiect e \u015fi mai ambi\u0163ios ca formul\u0103 tehnic\u0103, \u00eens\u0103. Va fi dezvoltat tot de Masdar \u015fi presupune combinarea de energie eolian\u0103 \u015fi solar\u0103 cu o central\u0103 mult mai mare de baterii, pentru a putea livra 24 ore din 24 o putere de 200 MW c\u0103tre centrele de date de inteligen\u0163\u0103 artificial\u0103. Contractul n-a fost semnat cu ministerul energiei, ci cu cel al inteligen\u0163ei artificiale \u015fi al digitaliz\u0103rii, Kazahstan av\u00e2nd deja un asemenea minister.\n\t\t\t\t\t<\/p>\n<p>\t\t\t\t\t\tIar Masdar are deja experien\u0163a conceperii celui mai mare proiect similar din lume chiar \u00een patria sa, \u00een Abu Dhabi, unde <a class=\"BluLink11\" target=\"_blank\" href=\"\/Stiri\/2025\/01\/Abu-Dhabi-a-anuntat-constructia-celui-mai-mare-proiect-de-energie-regenerabila-din-lume-care-va-livra-electricitate-24-ore-din-24\/\">construie\u015fte<\/a> un parc fotovoltaic de 5,2 GW \u00een de\u015fert, cooptat cu o central\u0103 de baterii de 19 GWh capacitate, urm\u00e2nd s\u0103 livreze 1 GW de putere constant\u0103, 24 ore din 24. Acel proiect are o investi\u0163ie de 6,1 miliarde de dolari \u015fi are deja toat\u0103 finan\u0163area asigurat\u0103, fiind \u00een plin proces de construc\u0163ie. Iar cel din Kazahstan va fi o versiune mai mic\u0103, de 200 MW ini\u0163ial \u015fi cu 500 MW \u0163inti\u0163i la o etap\u0103 ulterioar\u0103. Fiind adaptat la geografia din Kazahstan, proiectul va avea \u015fi energie eolian\u0103, care va avea chiar o pondere majoritar\u0103 \u00een produc\u0163ie. Configura\u0163ia exact\u0103 e \u00een proces de analiz\u0103 \u015fi stabilire acum, dar acordul pentru 200 MW e deja semnat, chiar dac\u0103 detaliile urmeaz\u0103 a fi stabilite.<\/p>\n<p>\n\t\t\t\t\t\tDe asemenea, \u00eentre timp Kazahstan construie\u015fte campusuri de inteligen\u0163\u0103 artificial\u0103, cu o putere de 200 MW pentru primul din ele, deci noul proiect Masdar de 24 ore pare sincronizat cu campusul vizat. Nu se cunoa\u015fte exact formula de finan\u0163are \u00eenc\u0103, dar e foarte posibil ca mecanismul s\u0103 fie unul similar, cu contract de achizi\u0163ie garantat\u0103. Pre\u0163ul va trebui s\u0103 fie mai mare, din cauza dimension\u0103rii uria\u015fe a bateriilor, care trebuie s\u0103 livreze vreo 19 ore \u00een continuu, dac\u0103 e s\u0103 judec\u0103m dup\u0103 experien\u0163a din Abu Dhabi. Dar chiar dac\u0103 acest proiect ar avea un pre\u0163 de 3 ori mai mare dec\u00e2t parcurile eoliene men\u0163ionate, tot ar r\u0103m\u00e2ne s\u0103 livreze energie la un pre\u0163 competitiv, mai ales \u00een folosirea pentru centre de date.\n\t\t\t\t\t<\/p>\n<p>\n\t\t\t\t\t\tLucruri foarte interesante se \u00eent\u00e2mpl\u0103, deci, \u00een \u0163\u0103ri care sunt mai rar \u00een vizorul nostru. Dar o incursiune \u00een aceast\u0103 situa\u0163ie ne arat\u0103 clar c\u0103 energia regenerabil\u0103 \u015fi implicit cea eolian\u0103 nu e obligatoriu s\u0103 fie scump\u0103, ba dimpotriv\u0103, poate fi foarte ieftin\u0103. \u015ei finan\u0163\u0103ri se pot g\u0103si. \u015ei doritori de a participa la licita\u0163ii, cu concuren\u0163\u0103 intens\u0103. \u015ei industria \u015fi cet\u0103\u0163enii pot beneficia \u00een cele din urm\u0103 de pre\u0163uri mici \u015fi competitive la energie.\n\t\t\t\t\t<\/p>\n<p>\t\t<a onclick=\"LikeNews(35888)\"><img decoding=\"async\" src=\"https:\/\/www.europesays.com\/ro\/wp-content\/uploads\/2026\/08\/1787382791_745_like_news.png\" border=\"0\" \/><\/a><\/p>\n<p>2<\/p>\n<p>2,492<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.europesays.com\/ro\/wp-content\/uploads\/2026\/08\/1787382791_783_nwlstatRd.png\" \/><\/p>\n<p>\t<a class=\"GenOpacEf\" onclick=\"history.back()\"><img decoding=\"async\" src=\"https:\/\/www.europesays.com\/ro\/wp-content\/uploads\/2026\/08\/1787382792_464_nwback.png\" border=\"0\" alt=\"\u00cenapoi\" title=\"\u00cenapoi\" \/><\/a><\/p>\n<p>\u015eTIRI DE CARE A\u0162I PUTEA FI INTERESAT<\/p>\n","protected":false},"excerpt":{"rendered":"21 August 2026, 19:23Redac\u0163ia PiataAuto.md \u00cen ultimii ani auzim tot mai des despre problema ap\u0103s\u0103toare a costurilor mari&hellip;\n","protected":false},"author":2,"featured_media":271503,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_share_on_mastodon":"0"},"categories":[14],"tags":[97,268,96,35197,2537,3159,10486,5332,5883,4802,42207,581,41,40,38,39,16002,7417],"class_list":["post-271502","post","type-post","status-publish","format-standard","has-post-thumbnail","category-afaceri","tag-afaceri","tag-baterii","tag-business","tag-dezvolta","tag-economie","tag-energie","tag-eoliene","tag-ieftina","tag-industrie","tag-kazahstan","tag-parcuri","tag-preturi","tag-ro","tag-romana","tag-romania","tag-romanian","tag-simultan","tag-stocare"],"share_on_mastodon":{"url":"https:\/\/pubeurope.com\/@ro\/117137926636314731","error":""},"_links":{"self":[{"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/posts\/271502","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/comments?post=271502"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/posts\/271502\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/media\/271503"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/media?parent=271502"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/categories?post=271502"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/ro\/wp-json\/wp\/v2\/tags?post=271502"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}