{"id":105316,"date":"2026-10-24T16:40:08","date_gmt":"2026-10-24T16:40:08","guid":{"rendered":"https:\/\/www.europesays.com\/spain\/105316\/"},"modified":"2026-10-24T16:40:08","modified_gmt":"2026-10-24T16:40:08","slug":"iberdrola-transforms-its-infrastructure-ntt-data-2","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/spain\/105316\/","title":{"rendered":"Iberdrola transforms its infrastructure | NTT DATA"},"content":{"rendered":"<p style=\"text-align: left\">NTT DATA, in collaboration with INGECID \u2014 a BIM engineering and consulting firm \u2014 and ISASTUR \u2014 an engineering company\u2014 designed and delivered a comprehensive BIM-based digital transformation solution tailored to the unique needs of the electrical industry.<\/p>\n<p style=\"text-align: left\">The phased approach supported progressive, scalable adoption aligned with i-DE\u2019s strategic objectives of integrating technology, processes and people.<\/p>\n<p style=\"text-align: left\">Key components of the digital transformation project included:<\/p>\n<p>AS-IS analysis and TO-BE design:\u00a0Assessing current processes in detail and defining a new BIM operating model suited to a high-voltage electrical environmentBIM process implementation and workflow design:\u00a0Standardizing processes across asset lifecycle phases \u2014 from design to construction \u2014 to improve consistency, traceability and efficiencyThe creation of a common data environment (CDE):\u00a0Configuring the CDE as a collaborative platform to manage project information and coordinate work across support engineering firms, contractors and internal teamsThe automation of technical tasks:\u00a0Implementing customized solutions that leveraged automated tools and tailored processes to increase design precision, and significantly reduce the time spent on repetitive activitiesCustomized BIM catalog development:\u00a0Creating a standardized catalog of over 2,800 parametric BIM objects aligned with i-DE\u2019s standards to support intelligent, reusable design componentsIntegration with corporate systems:\u00a0Integrating BIM models with i-DE\u2019s internal platforms, ensuring digital data continuity and improving interoperability between teams and applicationsTraining and change management:\u00a0Designing a plan for technical training and support that helps teams adopt BIM and steadily build the level of BIM maturity within the organizationBIM maturity key performance indicators and monitoring:\u00a0Establishing metrics to measure the adoption, performance and quality of the BIM process to support decision-making and continuous improvement.<\/p>\n<p style=\"text-align: left\">The project leveraged modeling and design applications, process automation solutions, utilities for technical data processing as well as document management platforms and collaborative environments that facilitated team coordination.<\/p>\n","protected":false},"excerpt":{"rendered":"NTT DATA, in collaboration with INGECID \u2014 a BIM engineering and consulting firm \u2014 and ISASTUR \u2014 an&hellip;\n","protected":false},"author":2,"featured_media":102068,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[122],"tags":[35579,35576,35575,35578,35577,35574,3337,146],"class_list":["post-105316","post","type-post","status-publish","format-standard","has-post-thumbnail","category-iberdrola","tag-asset-lifecycle-management","tag-bim-methods","tag-bim-based","tag-data-traceability","tag-data-driven-asset-management","tag-digital-engineering","tag-digital-infrastructure","tag-iberdrola"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/105316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/comments?post=105316"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/105316\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media\/102068"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media?parent=105316"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/categories?post=105316"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/tags?post=105316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}