{"id":120236,"date":"2026-11-20T00:43:12","date_gmt":"2026-11-20T00:43:12","guid":{"rendered":"https:\/\/www.europesays.com\/spain\/120236\/"},"modified":"2026-11-20T00:43:12","modified_gmt":"2026-11-20T00:43:12","slug":"iberdrola-replaces-74-old-wind-turbines-with-just-11-giant-machines-at-its-muras-wind-farm-in-galicia-each-generating-more-than-six-times-as-much-energy-as-its-predecessor-while-continuing-to-supply","status":"publish","type":"post","link":"https:\/\/www.europesays.com\/spain\/120236\/","title":{"rendered":"Iberdrola replaces 74 old wind turbines with just 11 giant machines at its Muras wind farm in Galicia, each generating more than six times as much energy as its predecessor while continuing to supply the same 40,000 homes"},"content":{"rendered":"<p>                    Iberdrola showed a video on Monday, October 26, 2026, of the repowering work at the Muras wind farm in Lugo, Galicia. The 74 turbines rated at 660 kW each, installed in 1998, are being replaced by 11 machines rated at 4.3 MW, and the wind farm continues to supply 40,000 homes<\/p>\n<p class=\"wp-block-paragraph\">Iberdrola is replacing an entire wind farm in Galicia, in northern Spain. A forest of 74 old turbines is making way for just 11 giant machines.<\/p>\n<p class=\"wp-block-paragraph\">The company showed the progress of the work in a <a href=\"https:\/\/www.youtube.com\/watch?v=57VZJzJ3ITE\" target=\"_blank\" rel=\"noopener nofollow\">video published on YouTube<\/a> on Monday, October 26, 2026. The project was authorized by the <a href=\"https:\/\/www.xunta.gal\/es\/notas-de-prensa\/-\/nova\/010390\/xunta-autoriza-repotenciacion-parque-eolico-cerca-50-los-ayuntamientos-muras\" target=\"_blank\" rel=\"noopener nofollow\">Xunta de Galicia, the region\u2019s government<\/a>.<\/p>\n<p>Watch the video<\/p>\n<p>        ARTICLE CONTINUES BELOW<\/p>\n<p>                See also            <\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/panasonic-turns-glass-windows-into-solar-power-plants-brings-mass-production-of-perovskite-solar-glass-forward-by-a-year-and-begins-selling-btl96\/\" class=\"link-recomendacao-artigo pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" data-source=\"site\" data-medium=\"recomendacao\" data-campaign=\"recomendacao_de_artigo\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">Panasonic transforms glass windows into solar power plants, accelerates mass production of perovskite technology and begins selling first units for buildings<\/p>\n<p>                            <img loading=\"lazy\" width=\"1290\" height=\"726\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/panasonic-turns-glass-windows-into-solar-power-plants-brings-mass-production-of-.jpg\"\/>                        <\/a><\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/tesla-packs-a-transformer-switch-and-inverter-into-one-74-mw-unit-runs-it-from-40c-to-55c-offers-warranties-of-up-to-25-years-and-plans-to-mhbb01\/\" class=\"link-recomendacao-artigo pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" data-source=\"site\" data-medium=\"recomendacao\" data-campaign=\"recomendacao_de_artigo\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">Tesla integrates transformer, switch, and inverter into a single 7.4-MW unit, operable from -40\u00b0C to 55\u00b0C, offering warranties up to 25 years, with U.S.-made Powercore expected in 2027<\/p>\n<p>                            <img loading=\"lazy\" width=\"1290\" height=\"726\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/tesla-packs-a-transformer-switch-and-inverter-into-one-74-mw-unit-runs-it-from-4.jpg\"\/>                        <\/a><\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/byd-ties-decision-on-a-battery-plant-in-amazonas-costing-up-to-r500-million-and-producing-10-gw-to-dec-2-and-4-auctions-as-it-negotiates-mhbb01\/\" class=\"link-recomendacao-artigo pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" data-source=\"site\" data-medium=\"recomendacao\" data-campaign=\"recomendacao_de_artigo\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">BYD ties battery plant decision in Amazonas, investing up to R$500 million and producing 10 GW, to December 2 and 4 auctions, negotiating with 70 interested companies<\/p>\n<p>                            <img loading=\"lazy\" width=\"1290\" height=\"726\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/byd-ties-decision-on-a-battery-plant-in-amazonas-costing-up-to-r500-million-and-.jpg\"\/>                        <\/a><\/p>\n<p>                        <a href=\"https:\/\/en.clickpetroleoegas.com.br\/engie-tests-a-robot-that-cleans-solar-panels-without-a-drop-of-water-invests-r356-million-in-18-months-of-development-boosts-power-mhbb01\/\" class=\"link-recomendacao-artigo pseudo-icon flex cursor-pointer items-center gap-3.5  before:size-[24px] before:bg-primary relateds-bg before:transition-all [&amp;_picture]:ml-auto\" data-source=\"site\" data-medium=\"recomendacao\" data-campaign=\"recomendacao_de_artigo\" rel=\"nofollow noopener\" target=\"_blank\"><\/p>\n<p class=\"!line-clamp-4 !text-sm !font-semibold !leading-[140%] !tracking-[-0.28px] text-secundary\">ENGIE tests robot that efficiently cleans solar panels without water, boosts energy output by 5.4%, prepares further R$4.5 million investments<\/p>\n<p>                            <img loading=\"lazy\" width=\"1290\" height=\"726\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" class=\"!min-w-[80px] !w-[80px] !min-h-[80px] !h-[80px] !ml-auto md:!min-w-[100px] md:!w-[100px] md:!min-h-[60px] md:!h-[60px] !mb-0 object-fit rounded-md wp-post-image\" alt=\"\" decoding=\"async\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/engie-tests-a-robot-that-cleans-solar-panels-without-a-drop-of-water-invests-r35.jpg\"\/>                        <\/a><\/p>\n<p class=\"wp-block-paragraph\">The technical details come from a December 14, 2023, announcement and documents from the Galician government, which authorized the project on March 4, 2025.<\/p>\n<p>What Iberdrola showed in the video<\/p>\n<p class=\"wp-block-paragraph\">The video is 37 seconds long and has already passed 550,000 views. Its description sums up the idea: an upgrade, or how \u201cless\u201d becomes \u201cmore.\u201d<\/p>\n<p class=\"wp-block-paragraph\">The footage shows cranes raising the new towers and enormous blades lying on the ground.<\/p>\n<p class=\"wp-block-paragraph\">It also shows the Iberdrola-branded nacelle being lifted through the fog.<\/p>\n<p class=\"wp-block-paragraph\">A crane unloads a transformer from a truck, while an overhead camera shows workers on a concrete foundation.<\/p>\n<p class=\"wp-block-paragraph\">The message on screen is direct. The wind farm will go from 74 turbines to 11.<\/p>\n<p class=\"wp-block-paragraph\">Each new turbine generates more than six times as much energy as its predecessor. Clean energy will continue to reach 40,000 homes.<\/p>\n<p>Where the Muras wind farm is located<\/p>\n<p class=\"wp-block-paragraph\">The wind farm is in the municipalities of Muras and Ourol, in the province of Lugo, Galicia. It has been operating since 1998 and has a capacity of 49 MW, according to Iberdrola\u2019s 2023 announcement, published by the Spanish news site Bolsaman\u00eda.<\/p>\n<p class=\"wp-block-paragraph\">At the time, the company said Muras supplied 41,000 homes a year. In the 2026 video, the figure shown is 40,000 homes.<\/p>\n<p class=\"wp-block-paragraph\">The project is being run by Iberdrola Renovables Galicia, which is based in Ourense.<\/p>\n<p class=\"wp-block-paragraph\">The official notice in Galicia\u2019s official gazette, dated September 3, 2024, calls the project the \u201ctechnological renewal of the 47.3-MW Muras wind farm.\u201d<\/p>\n<p>The machines being removed<\/p>\n<p class=\"wp-block-paragraph\">The site currently has 74 G47 wind turbines, each rated at 0.66 MW, with rotor hubs 45 meters above the ground. Together, they have a capacity of 48.84 MW.<\/p>\n<p class=\"wp-block-paragraph\">The Xunta, Galicia\u2019s regional government, detailed what is being removed: the 74 turbines, 74 transformer stations, the underground medium-voltage network and two meteorological towers.<\/p>\n<p class=\"wp-block-paragraph\">Roads that are no longer needed will be restored. The overhead medium-voltage line <a class=\"cpg-int\" href=\"https:\/\/en.clickpetroleoegas.com.br\/jampfs-eldorado-gets-until-july-2027-to-replace-mooring-points-and-berth-protection-at-santos-ports-berth-34-as-antaq-approves-study-to-btl96\/\" rel=\"nofollow noopener\" target=\"_blank\">will also<\/a> lose its 3.61-kilometer central circuit.<\/p>\n<p><img loading=\"lazy\" data-takopic=\"\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"Old, small wind turbines scattered across hills with dirt roads.\" class=\"wp-image-408906\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/iberdrola-74-turbinas-11-muras-bt19a-2-726300f7.jpg\"\/>Old turbines at the Muras wind farm in Galicia, at the beginning of Iberdrola\u2019s video. Photo: Screenshot\/YouTube\/Iberdrola.<br \/>\nThe machines being installed<\/p>\n<p class=\"wp-block-paragraph\">They will be replaced by 11 Vestas V117 wind turbines, each rated at 4.3 MW. The rotor has a diameter of 117 meters, and its hub is 84 meters above the ground.<\/p>\n<p class=\"wp-block-paragraph\">The 11 new machines have a combined capacity of 47.3 MW. In other words, there will be fewer turbines and nearly the same installed capacity, with far fewer towers spread across the mountain range.<\/p>\n<p class=\"wp-block-paragraph\">Each turbine has a 5,150 kVA dry-type transformer at the base of its tower, which raises the voltage from 0.72 kV to 30 kV. 30 kV cables connect the machines to the substation.<\/p>\n<p>What will change at the Muras substation<\/p>\n<p class=\"wp-block-paragraph\">The Muras substation is also being upgraded. The old medium-voltage switchgear cells will be removed and replaced with new 30 kV cells.<\/p>\n<p class=\"wp-block-paragraph\">The two old 132\/20 kV, 30 MVA transformers will be removed. One 132\/30 kV, 55 MVA transformer with an on-load tap changer will take their place.<\/p>\n<p class=\"wp-block-paragraph\">Civil works include an access road, an internal road network, turbine foundations, assembly platforms, a storage area, cable trenches and drainage.<\/p>\n<p>How much the project will cost<\/p>\n<p class=\"wp-block-paragraph\">The construction budget published in Galicia\u2019s Official Gazette is 39,390,366.79 euros.<\/p>\n<p class=\"wp-block-paragraph\">The Xunta, Galicia\u2019s regional government, put the cost at about 43 million euros when it authorized the project. That figure includes dismantling the old machines and installing the new ones.<\/p>\n<p class=\"wp-block-paragraph\">The Xunta announced the authorization in a statement on Tuesday, March 4, 2025. The resolution was signed by the Directorate-General for Renewable Energy and Climate Change.<\/p>\n<p>How much energy the new wind farm will generate<\/p>\n<p class=\"wp-block-paragraph\">The repowered wind farm is expected to produce 155,886 MWh net per year, according to the Xunta.<\/p>\n<p class=\"wp-block-paragraph\">Iberdrola says each new turbine generates more than six times as much energy as its predecessor.<\/p>\n<p class=\"wp-block-paragraph\">In 2023, the company had already said the new machines would have up to six times the capacity of the first wind turbines installed in Spain.<\/p>\n<p class=\"wp-block-paragraph\">The promised result is to keep supplying about 40,000 homes with far fewer turbines on the landscape.<\/p>\n<p>Why Iberdrola is doing this<\/p>\n<p class=\"wp-block-paragraph\">The process is called repowering.<\/p>\n<p class=\"wp-block-paragraph\">The old wind turbines are dismantled and replaced with modern machines that make better use of the wind and produce more electricity, the website Energ\u00edas Renovables explained in December 2023.<\/p>\n<p><img loading=\"lazy\" data-takopic=\"\" decoding=\"async\" width=\"1920\" height=\"1080\" src=\"data:image\/svg+xml,%3Csvg%20xmlns=\" http:=\"\" alt=\"White nacelle bearing Iberdrola's logo atop a wind turbine tower, surrounded by fog.\" class=\"wp-image-408907\" data-lazy- data-lazy- data-lazy-src=\"https:\/\/www.europesays.com\/spain\/wp-content\/uploads\/2026\/11\/iberdrola-74-turbinas-11-muras-bt19a-3-36cdc26c.jpg\"\/>Nacelle of one of the new turbines installed atop its tower, amid the mountain fog. Photo: YouTube\/Iberdrola.<\/p>\n<p class=\"wp-block-paragraph\">The turbines being removed were installed about a quarter-century ago.<\/p>\n<p class=\"wp-block-paragraph\">The Xunta, Galicia\u2019s regional government, says voluntary repowering can cut the number of turbines at a wind farm by up to 80% and increase renewable capacity by 35%.<\/p>\n<p class=\"wp-block-paragraph\">In the year before that authorization, the Galician government reviewed nine projects of this kind.<\/p>\n<p>The other wind farms on the list<\/p>\n<p class=\"wp-block-paragraph\">Muras is part of a package of four wind farms that Iberdrola announced on December 14, 2023, in Galicia and Castilla-La Mancha.<\/p>\n<p class=\"wp-block-paragraph\">At Serra da Panda, in A Coru\u00f1a, the 18.5-MW wind farm, built in 2002, is being reduced from 24 turbines to five.<\/p>\n<p class=\"wp-block-paragraph\">It currently has 22 turbines rated at 660 kW and two rated at 2 MW. After the upgrade, it will have three rated at 4.3 MW and the two 2-MW turbines. The wind farm supplies electricity to 12,600 households.<\/p>\n<p class=\"wp-block-paragraph\">At Molar de Molinar, in Albacete, the 49.5-MW wind farm, built in 2001, is replacing 75 turbines rated at 660 kW with 11 rated at 4.5 MW. It supplies electricity to 29,500 homes, according to Forbes Spain.<\/p>\n<p class=\"wp-block-paragraph\">At Isabela, also in Albacete, the 48-MW wind farm is going from 64 turbines rated at 750 kW to 11: six rated at 4.5 MW and five at 4.2 MW.<\/p>\n<p class=\"wp-block-paragraph\">In Galicia alone, the number of turbines will fall by 82. Across the package, the total reduction is 200 turbines, while average output rises by 30%.<\/p>\n<p class=\"wp-block-paragraph\">The package was included in the first round of the Repotenciaci\u00f3n Circular grant program, run by Spain\u2019s Ministry for the Ecological Transition through IDAE.<\/p>\n<p>Iberdrola\u2019s footprint in Spanish wind power<\/p>\n<p class=\"wp-block-paragraph\">In 2023, when it announced the package, Iberdrola had nearly 200 wind installations across 13 of Spain\u2019s autonomous communities, with 6,550 MW of capacity, according to Forbes Spain.<\/p>\n<p class=\"wp-block-paragraph\">Worldwide, it had more than 41,000 MW of installed renewable capacity, including more than 20,000 MW of onshore wind power.<\/p>\n<p>What remains to be done at Muras<\/p>\n<p class=\"wp-block-paragraph\">A video from October 2026 shows the work progressing, with new towers standing and components being brought to the mountaintop.<\/p>\n<p class=\"wp-block-paragraph\">Construction <a class=\"cpg-int\" href=\"https:\/\/en.clickpetroleoegas.com.br\/mrv-launches-r-1384-million-condominium-with-372-apartments-in-olympic-barra-concurrently-managing-construction-and-sales-in-rios-southwest-btl96\/\" rel=\"nofollow noopener\" target=\"_blank\">is still<\/a> underway. Iberdrola ends the video by recalling its 125-year history in the energy sector.<\/p>\n<p class=\"wp-block-paragraph\">Is replacing dozens of old turbines with a handful of giant machines the best path for wind power?<\/p>\n","protected":false},"excerpt":{"rendered":"Iberdrola showed a video on Monday, October 26, 2026, of the repowering work at the Muras wind farm&hellip;\n","protected":false},"author":2,"featured_media":120237,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[122],"tags":[146],"class_list":["post-120236","post","type-post","status-publish","format-standard","has-post-thumbnail","category-iberdrola","tag-iberdrola"],"_links":{"self":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/120236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/comments?post=120236"}],"version-history":[{"count":0,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/posts\/120236\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media\/120237"}],"wp:attachment":[{"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/media?parent=120236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/categories?post=120236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.europesays.com\/spain\/wp-json\/wp\/v2\/tags?post=120236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}